Bekir Kağan

Quality Assurance Specialist at Polyak Eynez Enerji Üretim Madencilik San. ve Tic. A.Ş.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Turkey, TR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Quality Assurance Specialist
      • Sep 2021 - Present

    • Türkiye
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Quality Assurance Quality Control supervisor
      • Aug 2018 - Aug 2021

    • Türkiye
    • Construction
    • 100 - 200 Employee
    • Mechanical Inspector
      • Jul 2017 - Jul 2018

      To monitor and coordinate all QC activities performed in the field, according to project specification and preparing daily, weekly, monthly reports for project quality departments. Monitor construction progress and perform QC inspection according to Quality Control Plans (QCP's), applicable standards and specification. Personnel qualifications/training review. (NDE, PWHT, Hardness Testing, Positive Material Identification etc.) Witnessing of PQR, WPQ/WQT according to the ASME Sec. IX, EN ISO 15614, EN ISO 15609-1, ISO9606-1, ASME B 31.3, PED and Project Specifications. Inspection of orifice flanges . Checking alignment of flanges, installation of gasket according to project specifications. Verification of Pressure Testing equipment adequacy. (Checking Test Manifold, Pressure Gauges, PSV, Hoses & Couplings, etc.) Calibration status of inspection and test Instrumentation and devices Checks before Erection of Derrick Structure (FLARE STRUCTURE); Assembly of components as per AFC Drawing, High strength bolts torquing controlling Equipment / Accessories Receiving Inspection; Visual Inspection for condition (External Inspection, Internal Inspection, Markings and Traceability check.) Following of punch before hydro test and commisioning Show less

    • South Korea
    • Construction
    • 700 & Above Employee
    • Quality Control Inspector
      • Nov 2016 - Jun 2017

      Following of Demensional controls and welding visual controls Before welding, during welding and after welding. Visual inspection of the Fit-up and weld joints, according to ASME B31.3(Table 341.3.2Acceptance Criteria for Welds / Visual and Radiographic Examination) Control of document and side accordingly ASME, EN and ITP. Witnessing of PQR, WPQ/WQT according to the ASME Sec. IX, EN ISO 15614, EN ISO15609-1, ISO9606-1, ASME B 31,1 and 31.3, PED and Project Specifications. Following of NDE at site and document accordingly project requeriment. Following Line check accordingly project and site. To comment if there is any problem. Auditting of sub constructor which is installing and making pressure test of GRP. Check of equipments accordingly releted procudures and check of connection pipe – equipment with dimensional-tolerance. Check of painting ( surface preparation, thickness of inter paint and touch up), check cleaning before insulation and checking of thickness of insulation(connection of pipe,vessel,elbov and equipments) during to insulate and after insulate. Checking of tork inspection of steel structures Checking of test package(weldlog, PWHT chart and WPS) Preparing of test package, following of pressure and pineumatic test. Verification of Pressure Testing equipment adequacy. (Checking Test Manifold, PressureGauges, PSV, Hoses & Couplings, etc.) Calibration status of inspection and test Instrumentation and devices. Show less

    • Türkiye
    • Fossil Fuel Electric Power Generation
    • 1 - 100 Employee
    • Quality Control Supervisor
      • Jul 2015 - Nov 2016

      Following of Demensional controls and welding visual controls Before welding, during welding and after welding. Following of NDE at site and document accordingly project requeriment. Checking of welder test and preparing their ID cards. Chechking of ITP and checking of site accordingly ITP. • Preparing of Weld log and call for inspection. Preparing of test package, following of pressure and pineumatic test. Following of punch before hydro test and commisioning Welder tests surveillance and card verification Equipment and Pumps ITPs checking Preparation of equipment and pump reports according to ITP Control of pumps and equipment according to ITP and ınpection Preparing of equipment log and call for inspection Material receiving inspections Preparation of audit reports Show less

    • Türkiye
    • Oil and Gas
    • 700 & Above Employee
    • Quality Control Technician
      • Jan 2013 - Jul 2015

      QA/QC inspector of welding – manufacturing Following of Dimensional controls and welding visual controls before welding, during welding and after welding. Following punch before hydro test and commisioning Following hydrotest of valves. Following welding - titanium and following of installation of titanium material Following İnstallation of OTOKLAV Tank Nikel and Cobalt facility process operator (Following – Checking- Operation of process pumps, following of general process, Checking valves, pipe lines and chemical tanks). Show less

Education

  • Anadolu Üniversitesi
    Lisans Derecesi, Çalışma ekonomisi endüstri ilişkiler
    2013 - 2018
  • Orta Doğu Teknik Üniversitesi
    Welding Inspector
    2015 - 2015
  • Düzce Üniversitesi
    Lisans Derecesi, Kaynak Mühendisliği Teknolojisi/Teknisyen
    2010 - 2012

Community

You need to have a working account to view this content. Click here to join now