Bekir Efil
Project Manager at Aka Otomotiv- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Aka Otomotiv
-
Türkiye
-
Motor Vehicle Manufacturing
-
100 - 200 Employee
-
Project Manager
-
Dec 2022 - Present
-
-
Project Supervisor
-
Apr 2021 - Dec 2022
I managed the Ford V710 Cross Car Beam project, V769 Brake pedal project, Sono motors Rear Twistbeam and Front Subframe projects, VW Rear Stabilizier project and Running change projects.
-
-
-
MARTUR FOMPAK International
-
Türkiye
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Senior Project Lead
-
Nov 2020 - Apr 2021
Ford V710 driver seat project management. Ford V710 driver seat project management.
-
-
-
Rollmech Automotive
-
Türkiye
-
Automotive
-
200 - 300 Employee
-
project leader
-
Feb 2018 - Nov 2020
· ASTON MARTIN AM800 PROJECT DBX SUV PROJECT DOOR HINGES. · NAMI UMP PROJECT MPV PROJECT SLIDING DOOR SYST · FORD V36X & 36X MCA HINGE AND SLIDING DOOR SYSTEMS . · ASTON MARTIN AM800 PROJECT DBX SUV PROJECT DOOR HINGES. · NAMI UMP PROJECT MPV PROJECT SLIDING DOOR SYST · FORD V36X & 36X MCA HINGE AND SLIDING DOOR SYSTEMS .
-
-
-
Coşkunöz Holding
-
Türkiye
-
Motor Vehicle Manufacturing
-
400 - 500 Employee
-
Central Method Supervisor
-
Jan 2016 - Feb 2018
· 01.2016 –02.2018- I WORKED AS A CENTRAL METHOD SUPERVISOR IN COŞKUNÖZ METAL FORM ENGINEERING DEPARTMANT. · CENTRAL METHOD DEPARTMANT MANAGED, APQP, PPAP, PSW, PFMEA, FLOW CHART, IMDS, SAP AND ISO16949 REQUIRED DOCUMENTS. · 01.2016 –02.2018- I WORKED AS A CENTRAL METHOD SUPERVISOR IN COŞKUNÖZ METAL FORM ENGINEERING DEPARTMANT. · CENTRAL METHOD DEPARTMANT MANAGED, APQP, PPAP, PSW, PFMEA, FLOW CHART, IMDS, SAP AND ISO16949 REQUIRED DOCUMENTS.
-
-
-
Aka Otomotiv
-
Türkiye
-
Motor Vehicle Manufacturing
-
100 - 200 Employee
-
Project leader
-
May 2012 - Jan 2016
FORD B460 (TURNEO COURIER) PROJECT; I MANAGED CHASSIS PARTS PROJECTS, FRONT CROSS MEMBER ASSY. (SUBFRAME), LOWERCONTROL ARM, REAR AXLE (TWISTBEAM). ADDITIONALY FORD GAVE US THE VALIDATION TEST RESPONSIBILITIES IN THIS PROJECT. CYCLING CORROSION TESTS, FIXTURE DESIGNS FOR DOING VALIDATION TESTS ACCORDING TO CUSTOMER SPECIFICATIONS, TESTS APPLICATIONS AND REPORTING PERIODS FOLLOWED BY ME. · TOFAŞ 636 DOBLO USA PROJECT; I MANAGED SERIAL PRODUCTION TOOLS AND CHECKING FIXTURES… Show more FORD B460 (TURNEO COURIER) PROJECT; I MANAGED CHASSIS PARTS PROJECTS, FRONT CROSS MEMBER ASSY. (SUBFRAME), LOWERCONTROL ARM, REAR AXLE (TWISTBEAM). ADDITIONALY FORD GAVE US THE VALIDATION TEST RESPONSIBILITIES IN THIS PROJECT. CYCLING CORROSION TESTS, FIXTURE DESIGNS FOR DOING VALIDATION TESTS ACCORDING TO CUSTOMER SPECIFICATIONS, TESTS APPLICATIONS AND REPORTING PERIODS FOLLOWED BY ME. · TOFAŞ 636 DOBLO USA PROJECT; I MANAGED SERIAL PRODUCTION TOOLS AND CHECKING FIXTURES EQUIPMENTS FOR FRONT CROSS MEMBER (SUBFRAME). · TOFAŞ 356 (EGEA) PROJECT; I MANAGED THE REAR AXLE PART SERIAL PRODUCTION TOOLS AND EQUIPMENTS ACCORDING TO PROJECT SCHEDULE. ·%100 TRACEABILITY SYSTEM HAS BEEN APPLIED ACCORDING TO CUSTOMER SPESIFICATION. IN THIS TRACABILITY SYSTEM HAS BEEN DEVELOPED FOR EVERY PARTS RAW MATERIAL INFORMATIONS/VERIFICATIONS, PRESS PART PRODUCTION DATES, WELDING PARAMETERS RECORDS, BUSHING ASSEMBLY RECORDS AND CATAPHORESIS RECORDS. · I MANAGED THE SHOT PEENING MACHINE DESIGN, MANUFACTERING AND R&D APPLICATION PERIOD. SHOT PEENING PROCESS IS BASED ON STRENGTHENING ON THE PART. Show less FORD B460 (TURNEO COURIER) PROJECT; I MANAGED CHASSIS PARTS PROJECTS, FRONT CROSS MEMBER ASSY. (SUBFRAME), LOWERCONTROL ARM, REAR AXLE (TWISTBEAM). ADDITIONALY FORD GAVE US THE VALIDATION TEST RESPONSIBILITIES IN THIS PROJECT. CYCLING CORROSION TESTS, FIXTURE DESIGNS FOR DOING VALIDATION TESTS ACCORDING TO CUSTOMER SPECIFICATIONS, TESTS APPLICATIONS AND REPORTING PERIODS FOLLOWED BY ME. · TOFAŞ 636 DOBLO USA PROJECT; I MANAGED SERIAL PRODUCTION TOOLS AND CHECKING FIXTURES… Show more FORD B460 (TURNEO COURIER) PROJECT; I MANAGED CHASSIS PARTS PROJECTS, FRONT CROSS MEMBER ASSY. (SUBFRAME), LOWERCONTROL ARM, REAR AXLE (TWISTBEAM). ADDITIONALY FORD GAVE US THE VALIDATION TEST RESPONSIBILITIES IN THIS PROJECT. CYCLING CORROSION TESTS, FIXTURE DESIGNS FOR DOING VALIDATION TESTS ACCORDING TO CUSTOMER SPECIFICATIONS, TESTS APPLICATIONS AND REPORTING PERIODS FOLLOWED BY ME. · TOFAŞ 636 DOBLO USA PROJECT; I MANAGED SERIAL PRODUCTION TOOLS AND CHECKING FIXTURES EQUIPMENTS FOR FRONT CROSS MEMBER (SUBFRAME). · TOFAŞ 356 (EGEA) PROJECT; I MANAGED THE REAR AXLE PART SERIAL PRODUCTION TOOLS AND EQUIPMENTS ACCORDING TO PROJECT SCHEDULE. ·%100 TRACEABILITY SYSTEM HAS BEEN APPLIED ACCORDING TO CUSTOMER SPESIFICATION. IN THIS TRACABILITY SYSTEM HAS BEEN DEVELOPED FOR EVERY PARTS RAW MATERIAL INFORMATIONS/VERIFICATIONS, PRESS PART PRODUCTION DATES, WELDING PARAMETERS RECORDS, BUSHING ASSEMBLY RECORDS AND CATAPHORESIS RECORDS. · I MANAGED THE SHOT PEENING MACHINE DESIGN, MANUFACTERING AND R&D APPLICATION PERIOD. SHOT PEENING PROCESS IS BASED ON STRENGTHENING ON THE PART. Show less
-
-
-
Yagmaksan Machinery Industry
-
Türkiye
-
Machinery Manufacturing
-
1 - 100 Employee
-
Quality Manager
-
Mar 2011 - May 2012
ISO 9001/2008 KALİTE SİSTEM YENİLEMESİ VE %100 KALİTE KONTROL SİSTEMİNİ KALDIRARAK ÜRETİMDE HATASIZLAŞTIRMA İLE MÜŞTERİ KALİTE SEVİYESİNİ A NOTUNA ÇIKARDIK. ISO 9001/2008 KALİTE SİSTEM YENİLEMESİ VE %100 KALİTE KONTROL SİSTEMİNİ KALDIRARAK ÜRETİMDE HATASIZLAŞTIRMA İLE MÜŞTERİ KALİTE SEVİYESİNİ A NOTUNA ÇIKARDIK.
-
-
Education
-
Afyon Kocatepe Üniversitesi
Bachelor of Engineering (B.E.), Mechanical Engineering