Bayram Ali GOCMEN, PhD

PROJECT/PROCESS MANAGER at PROKON LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Baku City, Contiguous Azerbaijan, Azerbaijan, AZ
Languages
  • English Full professional proficiency
  • Turkish Native or bilingual proficiency
  • German Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 100 - 200 Employee
    • PROJECT/PROCESS MANAGER
      • Jun 2019 - Present

      Investment Planning and Construction Projects: - Small Large Scale Refineries 2000-300000 BPSD- Investment Planning/Configuration/FEED/EPCC services - Gas Processing/ Petrochemical Plants, such as EP-200/600, Propylene, Polypropylene - Power Plant- Steam to Power Systems, Socar-Uniper LLC, Funding by ECAs - Chemical Plants/Biochemical Plants- Chlor Alkali/Electrolyzers/Feulcells/Salts-Brine- Fermentation Processes - Underground Gas Storage- Gas Processing- NGLs and Gas to Petrochemicals, Underground Storage Dewatering systems Show less

    • Türkiye
    • Oil and Gas
    • 700 & Above Employee
    • OIL&GAS- MIDSTREAM/UPSTREAM-PROJECT COORDINATOR UGS/Consultant/Business Development and Investments
      • May 2017 - Jun 2019

    • Türkiye
    • Chemical Manufacturing
    • 100 - 200 Employee
    • OIL&GAS-FERTILIZERs: PLANT MANAGER
      • Dec 2015 - Apr 2017

      •Operating 4 units under various licensors, KREBS, INCRO, etc. together with solid handling, tankage area, and jetty facilities to supply NPK and triple super phosphate fertilizers to market(market leader in sales and in NPK ferts production). •1 MT annual capacity, 400+ staff including maintanence(mechanical, electrical, instrumentation groups) and administration departments. •Coordinate maintanence/improvement activities in exiting units and manage/problem solving about commissioning/operations issues of all brown fields investments(desalination unit, ammonia storage, fire fighting unit, flare, cooling water system) in plant(including jetty/tankage area and solid handling system) without interruption of FERTs supply to market. Show less

    • Türkiye
    • Oil and Gas
    • 700 & Above Employee
    • OIL&GAS-REFINERY: TEAM LEADER/PROCESS, (LEAD PROCESS ENGINEER till 2014)
      • Jul 2011 - Nov 2015

      •Dealt with refinery project from conseptual study to the end detailed desing activities: mainly crude distillation, coking during conseptual/feasibility, re-FEED, and tendering(technical evaluation) stage and all UTILITY units and waste treatment with tankage/jetty facilities during EPC phase of grass-root refinery. •Evaluation of licensor/technology selection, check performance values/best practices, and modify as required for maximum yield with minimizing capex&opex. •Evaluation& participation of/to screening/concept/feasibility studies to determine optimum configuration and capacities at breakeven point. •Conduct simulation and optimization studies such overall refinery's electric/steam load optimization to get lower unit cost during operation, deciding turbine types, voltage level, and drivers application to decrease OPEX by providing consistent system integrity with loads in petrochemical complex nearby. •During EPC stage: managed engineering team by coordinating engineering issues in liaison offices(Spain, Italy, Korea) to attend detailed design activities of utility and offsite(incl. jetty, tankage) facilities of STAR refinery to resolve any process issues(request of information, change orders, etc.) between owner and contractors. •Gave comments to engineering documents and attended workshops to resolve technical issues, process, including PFD/ PID/ Plot plan reviews, HAZOP's, HAZIDs, Risk Assessments, Operability Reviews, 3D Model Reviews, 3D model reviews and SIL Rating. •Support and help to solve interface projects between parties, such as configuration of refinery natural gas RMS with local authorities and design of pipeline facilities by handling technical details, PID, HAZOP, Plot plan, etc to send/take products/raw materials from/to different units in petrochemical complex nearby. Show less

    • Türkiye
    • Chemical Manufacturing
    • 700 & Above Employee
    • OIL&GAS-PETROCHEMICAL: COMMISSIONING&OPERATIONS SUPERVISOR (LDPE)
      • Aug 2007 - Jun 2011

      •Experienced on petrochemical complex mainly LDPE unit with a capacity more than 160 kt/year, staff 80+ and gross profit more than 200 M$/year. •Studied about Gas Processing (C1-C4), i.e. hyper compressors operation, thermodynamics of C2-C4 gases and transportation, C2 polymerisation, gas-vapor-liquid equilibrium and separation. •Performed LDPE plant commissioning, start up, and turndown/shut down activities. Make plan for efficient turnaround timing with planning department and take early actions to finish at time. •Generated LDPE unit manuals, operator guidelines, etc. •Prepared check list and send update order for PFD, PIDs, data sheets, etc. •Checked daily activities and DCS engineering counsel to check alarms and troubleshooting of process and system issues. •Worked on energy optimization/efficiency, unit cost calculation, decreases losses in plant and complex i.e. steam and power system analysis with PROsteam (KBC). •Made cost model (microsoft office tools, VBE) of unit for different product diversity, optimize product(10 grades) portfolio during operation to descrease/eliminate off-spec product and quality problems. •Operated high pressure hazardous plant efficiently with DCS (HONEYWELL R3000), also, experienced on BENTLEY-NEVADA and PROGNOST compressor monitoring systems. • Working about capacity increase program of LDPE-T plant by doing technical bid/epc documents evaluation and approval of technical process documents, such as PID, Isometrics, equipment data sheets, etc. with TECHNIP-FRANCE/licensor STAMICARBON-NETHERLANDS and FAT (factory acceptance test) approval with HONEYWELL-FRANCE. •Worked with SHELL GLOBAL SOLUTIONS (3 months) for energy improvements in entire complex. Found energy improvement projects which have a potential to gain about $20 million per year in 2009. Show less

    • Türkiye
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • LIEUTENANT/LABORATORY SUPERVISOR/QUALITY CONTROL (TS EN ISO/IEC 17025)
      • Sep 2006 - Aug 2007

      •Supervise staff 6+ to control the quality experiments of foods in TSE standards to buy them in bulk. •Report and rearrange standards of experiments within TS EN ISO 17025, ISO 9001. •Worked on TURKAK accreditation of the laboratory. •Supervise staff 6+ to control the quality experiments of foods in TSE standards to buy them in bulk. •Report and rearrange standards of experiments within TS EN ISO 17025, ISO 9001. •Worked on TURKAK accreditation of the laboratory.

    • Türkiye
    • Higher Education
    • 700 & Above Employee
    • RESEARCH ASSISTANT
      • Sep 2004 - Jul 2006

Education

  • Bosphorus University
    M.Sc., Chemical Engineering
    2004 - 2006
  • Hacettepe University
    Doctor of Philosophy - PhD, Nanotechnology, Material Science, Polymer Composites, PP/PE based materials
    2012 - 2017
  • Bosphorus University
    B.Sc., Chemical Engineering & Chemistry