Bassel Yassin PMP®, CIOB,CIArb ,LEED® Green Associate™

Project Manager at Webuild
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Riyadh, Saudi Arabia, SA
Languages
  • English Full professional proficiency
  • Arabic Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

EUR ING Gerhard Bakker MIEAust CEng

Bassel is a great asset in the Elevated Stations team. I highly value his ability to manage the numerous engineering details in the design documents. He also has created good working relations with the engineers of the subcontractors. Gerhard Bakker

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • LEED Green Associate
    USGBC Central Coast Green Building Council
    Apr, 2022
    - Nov, 2024
  • Associate
    Chartered Institute of Arbitrators (CIArb)
    Dec, 2021
    - Nov, 2024
  • Associate
    The Chartered Institute of Building (CIOB)
    Oct, 2021
    - Nov, 2024
  • Project Management Professional (PMP)
    Project Management Institute
    Jan, 2018
    - Nov, 2024
  • Civil Engineer
    Saudi Council of Engineers
    Mar, 2012
    - Nov, 2024

Experience

    • Italy
    • Construction
    • 700 & Above Employee
    • Project Manager
      • Mar 2023 - Present

      Riyadh Metro Project. Riyadh Metro Project.

  • AL Adwan Real Estate
    • Riyadh, Saudi Arabia
    • Real Estate Representative
      • Dec 2020 - Mar 2023

      During this experience, I have managed the take-off and design phases of the off-plan properties in 2 cities. 🎯 Key Achievements included: ☑ Interviewed 15+ engineering candidates for the implementation phase of the project ☑ Contracted an architectural design office to conduct 3D designs and monitored progress ☑ Supervised the process of Structural, Electrical and Mechanical design of the project ☑ Estimated the costs of the project and identified break-even points for each property ☑ Monitored budgets and ensured adherence to cost control standards ☑ Co-developed Bill of Quantity (BOQ), Scope of Work, and publicized tender documents ☑ Studied 10+ commercial & technical proposals ☑ Collaborated with management in the qualification and selection of contractors ☑ Tracked project schedules and monitored productivity rate of subcontractors and site team ☑ Partnered with a consulting firm to supervise & review submittals of contractors Show less

    • Saudi Arabia
    • Consumer Services
    • 400 - 500 Employee
    • Senior Project Coordinator
      • Oct 2019 - Nov 2020

      Throughout this experience, I have managed 2 projects; the Management Office Building and the Construction Village Housing. 🎯 Key Achievements include: ☑ Prepared budget estimates for the projects ☑ Maintained contact with clients and sustained relationships with 50+ suppliers and 3rd parties ☑ Coordinated logistics, collaborated with the procurement department and followed-up on timely availability of materials and long-lead items on site ☑ Ensured adherence to guidelines of LEED (Silver) consultant ☑ Hired team members such as Document Controller, Structural & Site Engineer ☑ Hired a Building Information Modeling (BIM) expert to detect and report inconsistencies in different engineering trades ☑ Headed negotiations and change requests resulting in increased project value by 7% ☑ Supervised the fabricated unit assembly, infrastructure works, and underground utilities for the construction village housing (CVH) project ☑ Mobilized 10+ subcontractors for prefabricated units, HVAC, agricultural & MEP works Show less

    • Projects Coordinator
      • Oct 2018 - Sep 2019

      As a Projects Coordinator, I have executed 2 project phases simultaneously for the Steel Structure Tanks and Polishing Plant, water transmission lines project. 🎯 Key Achievements include: ☑ Followed-up on procurement of 50+ of items and pre-qualification of 30+ suppliers ☑ Cascaded design specifications and guided the design of 200+ schematic and shop drawings ☑ Directed mobilization on-site, and cooperated between the different internal departments ☑ Conducted health and safety audit action plans and ensured implementation of HSE policies ☑ Coordinated between the subcontractors and the site team for project implementation ☑ Headed technical meetings with the client, submitted daily and monthly progress reports Show less

    • Saudi Arabia
    • Construction
    • 100 - 200 Employee
    • Senior Civil Engineer
      • Sep 2015 - Jun 2018

      At Fast Consortium, I have facilitated site works of underground utilities, piles, slabs, steel structure, railway, and fit-out works for the Metro Project. 🎯 Key Achievements include: ☑ Maintained documents such as method statements, Inspection & Test Plans (ITP), and Concrete Mix Design guidelines as part of QA/QC involvement ☑ Attended weekly meetings with subcontractor and the consultant to review submittals ☑ Directed a team of 6 members from Site and Design Engineers ☑ Scheduled the interfaces between concrete and steel structural works Show less

    • Saudi Arabia
    • Construction
    • 700 & Above Employee
    • Senior Civil Engineer
      • Nov 2007 - Apr 2015

      With SBG, I have joined as Site Engineer, scaled to Zone Manager and Senior Civil Engineer, where I have worked on 3 different projects throughout my engagement. 🎯 Key Achievements include: ☑ Reviewed shop drawings for the 3 projects and reported to the construction manager ☑ Guided the development of facilities and construction of bridge at the KAIA project ☑ Operated security building extension for the Ministry of Interior project ☑ Liaised with subcontractors on concrete & fit-out for the 14-story hotel endowment project ☑ Managed 100s of site workers and ensured adherence to health and safety guidelines ☑ Planned the civil work activities including the surveying and earth works Show less

Education

  • Aleppo University
    Good, Civil Engineering
    2002 - 2007

Community

You need to have a working account to view this content. Click here to join now