Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Instrumentation Fitter
      • Feb 2021 - Present

      @Cameron Brittmore Rd, Houston, TX.

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Instrumentation Fitter
      • Dec 2020 - Jan 2021

      Field Service Tech @Grupo R Tampico, Mexico.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Instrumentation Fitter
      • Dec 2019 - Oct 2020

      @Energy Montgomery County Power Station, Willis, Texas.

    • United States
    • Construction
    • 700 & Above Employee
    • Instrumentation Fitter
      • Jun 2019 - Dec 2019

      @SaSol Lake Charle, LA.* Ran Instruments Air Pipe 1/2", 3/4", and 1”* Fabricating and Installs support for the Instruments Air Pipe.* Ran 1/4", 3/8", and 1/2" Stainless Steel Tubing. * Fabricating and Install support tray and tubing clips for the tubing.* Plan and layout Pipe and Tubing.* Installs Instruments and supports.

    • Construction
    • 700 & Above Employee
    • Instrumentation Fitter 1
      • Sep 2018 - Jun 2019

      @ExxonMobil BPEX Plant* Ran Instruments Air Pipe 1/2", 3/4", 1" and 1 1/2". * Working on Lokring equipment for the pipe. * Fabricating and Installs support for the Instruments Air Pipe.* Ran 1/4", 3/8", and 1/2" Stainless Steel Tubing. * Fabricating and Install support tray and tubing clips for the tubing.* Plan and layout Pipe and Tubing.

    • United States
    • Construction
    • 700 & Above Employee
    • Field Service Instrumentation Fitter/Tech
      • Aug 2017 - Aug 2018

      Oversea Field Service Tech On ExxonMobil Zafiro Producer* Ran Rack 1/4", 3/8", and 1/2" Stainless Steel Tubing. * Fabricating support tray and tubing clips for the tubing.* Trouble shooting control valves.* Reconnect tubing to control panels.* Plan and layout tubings.

    • Instrumentation Fitter II
      • Aug 2016 - Jul 2017

      @Chevron Phillips Plant* Ran 1/4", 3/8", and 1/2" Stainless Steel Tubing. * Installing ELEC TRACED AND STEAM TRACED wired.* Fabricating support tray and tubing clips for the tubing.* Install control valves, PT, FT, TT and other Instruments. * Plan and layout tubing.

    • Instrumentation & Pipe Fitter
      • Jul 2015 - Aug 2016

      @Cameron Berwick, LA* Ran 3/4", 1", 1 1/4", and 1 1/2" socket welded heavy wall tubing.* Fabricating and Installs support for the tubing and pipe.* Ran rack 1/4", 3/8", and 1/2" Stainless Steel Tubing. * Fabricating and Install support tray and tubing clips for the tubing.* Plan and layout Pipe and Tubing.

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Instrumentation Fitter
      • Sep 2013 - Jul 2015

      @Cameron Bingle Rd Houston, Tx* Subsea POD , MUX & Panels* Ran rack 1/4", 3/8", and 1/2" Stainless Steel Tubing. * Fabricating and Install support and tubing clips for the tubing.* Trouble shooting * Plan and layout Pipe and Tubing.* Stand by for testing * Night shift

    • Azerbaijan
    • Market Research
    • 1 - 100 Employee
    • Instrument Fitter
      • May 2010 - Aug 2013

      @H&P LandRig * Ran 1/4", 3/8", 1/2", 1 1/4" and 1 1/2" Stainless Steel Tubing. * Fabricating and Install support tray and tubing clips for the tubing.* Plan and layout Pipe and Tubing.* Pressure testing each tubing after install.* Install Top Drive kit.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • CNC Machinist
      • Oct 2009 - Mar 2010

Community

You need to have a working account to view this content. Click here to join now