Banu Taşkıran, MSc.
Production Specialist at Teknomak A.Ş.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Udemy
UdemyFeb, 2023- Sep, 2024 -
Leadership Development Program
CRESTCOM TürkiyeDec, 2022- Sep, 2024 -
Yalın Üretim
PROGİMSep, 2022- Sep, 2024 -
İlkYardım
Ankara Valiliği İl Sağlık MüdürlüğüAug, 2022- Sep, 2024 -
Fikri ve Sınai Mülkiyet Hakları
Kızılay PatentFeb, 2021- Sep, 2024 -
Depo ve Stok Yönetimi
Biymed Eğitim ve DanışmanlıkDec, 2018- Sep, 2024 -
Satış ve Satış Yönetimi
TOBB ETÜSep, 2018- Sep, 2024 -
Tedarik Zinciri Yönetimi ve Satın Alma
TMMOB MAKİNA MÜHENDİSLERİ ODASIMar, 2018- Sep, 2024 -
İş Analizi Eğitimi
Çankaya ÜniversitesiJan, 2017- Sep, 2024 -
ERP Farkındalık Günü
Çankaya ÜniversitesiJan, 2016- Sep, 2024 -
Liderlik ve Küresel Girişimcilik
Yeditepe Üniversitesi Liderlik ve Girişimcilik KulübüJan, 2014- Sep, 2024 -
9. Genç Akademi
Bilkent ÜniversitesiJan, 2013- Sep, 2024 -
Preparatory School 4th Level Project Presentations
Çankaya ÜniversitesiJan, 2013- Sep, 2024
Experience
-
Teknomak A.Ş.
-
Türkiye
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Production Specialist
-
Jun 2022 - Present
To follow all project processes closely and contribute to finding solutions to problems that may arise in the project.To lean production.
-
-
Export and Project Specialist
-
Oct 2019 - Jun 2022
To provide information flow with abroad companies and customers.To follow foreign trade regulations and provide logistics management.
-
-
Planning Engineer
-
Feb 2018 - Oct 2019
To ensure that the planning and delivery stages of the project are completed without any problems.
-
-
-
BAŞÖZ ENERJİ TAAHHÜT TİCARET VE SANAYİ A.Ş.
-
Türkiye
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Senior Design Project Member
-
Sep 2016 - May 2017
Development of Performance of Welding Station and Scheduling System - Make deep analysis for the products and classification on welding operations. - Carry out time study and system productivity. - Identify bottlenecks and waiting times. - A scheduling was made by determining the workstations and capacities involved in production. Development of Performance of Welding Station and Scheduling System - Make deep analysis for the products and classification on welding operations. - Carry out time study and system productivity. - Identify bottlenecks and waiting times. - A scheduling was made by determining the workstations and capacities involved in production.
-
-
-
Makine ve Kimya Endüstrisi A.Ş.
-
Türkiye
-
Defense and Space Manufacturing
-
300 - 400 Employee
-
Internship
-
Jul 2016 - Aug 2016
Within the scope of the management internship, the minimum stock level of the 20 mm Cartridge type was determined with the EOQ model and its 3 month scheduling was solved with the GAMS model. Within the scope of the management internship, the minimum stock level of the 20 mm Cartridge type was determined with the EOQ model and its 3 month scheduling was solved with the GAMS model.
-
-
-
EB Rebosio Ltd. Sti.
-
Türkiye
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Internship
-
Jul 2015 - Aug 2015
For the summer training period, analysis of manufacturing system, production scheduling, quality, logistic are investigated. For the summer training period, analysis of manufacturing system, production scheduling, quality, logistic are investigated.
-
-
Education
-
Çankaya Üniversitesi
Yüksek Lisans (Master), Endüstri Mühendisliği -
Çankaya Üniversitesi
Endüstri Mühendisliği -
Özel Arı Okulları
High School Diploma