Balamurugan Periyasamy

Consultant - Senior Piping Designer at Moreld APPLY
  • Claim this Profile
Contact Information
Location
NO
Languages
  • Engligh Professional working proficiency
  • Tamil Native or bilingual proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Norway
    • Oil and Gas
    • 400 - 500 Employee
    • Consultant - Senior Piping Designer
      • Nov 2020 - Present

      Working on modification projects for Gullfaks, Oceberg and Valemon plotforms. Responsibilities, 1. Reviewing SOW and estimate hours. 2. Planning all material handling and transport route. 3. Routing of all critical and non critical piping as per P&ID 4. Coordinating with System group to fix Interfaces internally and externally 5. Coordinating with other Disciplines and with Clients Working on modification projects for Gullfaks, Oceberg and Valemon plotforms. Responsibilities, 1. Reviewing SOW and estimate hours. 2. Planning all material handling and transport route. 3. Routing of all critical and non critical piping as per P&ID 4. Coordinating with System group to fix Interfaces internally and externally 5. Coordinating with other Disciplines and with Clients

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Consultant Piping Designer, Engineer
      • Aug 2018 - Feb 2020

      Working for Johan Sverdrup Phase - 2 Project. Responsible for 1st stage separator and its related piping in Upper Process Module. Responsibilities, 1. Reviewing Equipment Nozzle, Manhole location and its orientation 2. Modeling Material handling and Main Transport route for the Module 3. Routing of all Critical and Utility piping as per P&ID 4. Coordinating with System group to fix Interfaces internally and externally 5. Coordinating with other Modules / Disciplines Working for Johan Sverdrup Phase - 2 Project. Responsible for 1st stage separator and its related piping in Upper Process Module. Responsibilities, 1. Reviewing Equipment Nozzle, Manhole location and its orientation 2. Modeling Material handling and Main Transport route for the Module 3. Routing of all Critical and Utility piping as per P&ID 4. Coordinating with System group to fix Interfaces internally and externally 5. Coordinating with other Modules / Disciplines

    • AIBEL Pte Ltd
      • Feb 2011 - May 2016

      As a Piping Engineer, Locating all modules on topside of the vessel based of HAZ / Non-HAZ zones. Developing a conceptual layout for a FPSO / FSO by locating all relevant equipment's inside the module. Routing Piping. Projects involved, 1. Catcher FPSO Development Project 2. Catcher FEED Project 3. Leviathan FEED Project 4. Statoil V&M – 107092 & 104035 Projects 5. Troll-A TPC34 EPC Project 6. Gudrun EPCh Project As a Piping Engineer, Locating all modules on topside of the vessel based of HAZ / Non-HAZ zones. Developing a conceptual layout for a FPSO / FSO by locating all relevant equipment's inside the module. Routing Piping. Projects involved, 1. Catcher FPSO Development Project 2. Catcher FEED Project 3. Leviathan FEED Project 4. Statoil V&M – 107092 & 104035 Projects 5. Troll-A TPC34 EPC Project 6. Gudrun EPCh Project

    • Consultant - Piping
      • Oct 2010 - Feb 2011

      Kazak Oil Aktobe Project Client : Petrofac, Shell, KazStoryService, Kazak Oil Aktobe Position : Piping Consultant Responsibilities, 1. Skid modelling (Separator Water Transfer Pump, Dehydrator Feed Pump and Wash water Heater) 2. Pipe Routing / Checking as per P&ID 3. Equipment Modelling as per Vendor GA 4. Isometrics Generation 5. Pipe Support Design / Checking Kazak Oil Aktobe Project Client : Petrofac, Shell, KazStoryService, Kazak Oil Aktobe Position : Piping Consultant Responsibilities, 1. Skid modelling (Separator Water Transfer Pump, Dehydrator Feed Pump and Wash water Heater) 2. Pipe Routing / Checking as per P&ID 3. Equipment Modelling as per Vendor GA 4. Isometrics Generation 5. Pipe Support Design / Checking

    • Piping Design Engineer
      • Aug 2007 - Nov 2010

      Projects: 1. FPSO Tupi NE 2. TALISMAN - YME FIELD Re-Development 3. FPSO Espirito Santo (TAMBA BV-BC10 Field) Clients : Petrobras, Brazilian Deepwater Floating Terminals Inc., Position : Piping Designer Responsibilities, 1. Pipe Routing / Checking as per P&ID 2. Equipment modeling as per Vendor Drawing 3. Preparation of Various Layouts, a. Equipment Layout b. Detail Arrangement c. Piping Layout (Floor wise) d. Pipe Support Layout e. Interface Location Layout 4. Isometrics Generation 5. Pipe Support Design & Extraction 6. Pipe Support – Detail Drawing 7. Generation of BoM from Model 8. Modules Worked, a. HP Separation b. LP Separation c. Oil / Sea Water Treatment d. Gas Treatment e. Power Generation / WHRU f. Amine Feed Booster Compressor g. Fired Heater

    • Lead Engineer - Plants
      • Jul 2006 - Jul 2007

      Modugno, 800MW Combined Cycle Power Plant Client : Energia Spa, Italy Position : Lead Engineer - Plants Responsibilities, 1. Pipe Routing as per P&ID 2. Equipment Modeling as per Vendor Drawing 3. Preparation of Various Layouts, a. Site Layout b. Interface Location Layout c. Equipment Layout d. Detail Arrangement e. Piping Layout (Floor wise) f. Lay down Plan g. Maintenance & Access ways h. Pipe Support Layout 4. Isometrics Generation 5. Pipe Support Design 6. Generation of BoM from Model. 7. Systems Handled, a. Main Steam b. Condensate c. Anti Icing d. Fire Fighting e. GT Air Cooling f. Dosing (Ammonia, Phosphate)

    • India
    • Truck Transportation
    • 1 - 100 Employee
    • Assistant Applications Engineer
      • Apr 2005 - Jun 2006

      Projects: 1. GREEN FUEL EMISSION CONTROL 2. ISOMERISATION UNIT 3. TNPL 1x15MW CPP 4. OSIL 1x24MW CPP 5. MONNET 2x45MW Clients : Engineers India Limited, BHEL, Orissa Sponge Iron Limited, Monnet Ispat Limited Position : Assistant Applications Engineer Responsibilities, 1. Pipe Routing as per P&ID 2. Equipment Modelling as per Vendor Drawing 3. Preparation of Layouts 4. Pipe Support Design 5. Generation of Isometrics 6. Generation of BoM from model. 7. Systems Handled, a. Main Steam b. Lube Oil Skid c. Compressor System d. Pump Suction & Discharge e. Bypass lines f. Extraction lines g. Condensate lines h. Feed Water i. Cooling Water

Education

  • M. Kumarasamy College of Engineering
    Bachelor of Engineering (B.E.), Mechanical Engineering
    2000 - 2004
  • MSP School
    HSC, Mathematics
    1993 - 2000

Community

You need to have a working account to view this content. Click here to join now