Bahar Shams
Technical Auditor at MTN Irancell- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Persian Native or bilingual proficiency
Topline Score
Bio
Experience
-
MTN Irancell
-
Iran
-
Telecommunications
-
700 & Above Employee
-
Technical Auditor
-
Jul 2023 - Present
-
-
USO Access Transmission Planning and optimization Engineer
-
Feb 2022 - Jul 2023
-
-
-
AEC - RavanErtebat ( Access Endless Communication )
-
Iran
-
Telecommunications
-
100 - 200 Employee
-
IE and Acceptance Coordinator
-
Dec 2018 - Feb 2022
Implementation Engineer of FTK, Relocation,USO project for RBS & links. *In charge of requesting the Ericsson, Huawei,Nokia & ZTE material (Radio and Microwave) based on MTNI plan. *In charge of requesting the Ericsson and Nokia material of ALM Project (Antenna Line Modification SSV) based on MTNI plan. *In charge of requesting the MW material of Cow Site based on MTNI plan. *In charge of requesting the Nokia, Huawei, Ericsson,ZTE Radio material for Relocation and USO Project based on MTNI plan. *Delivery coordination of material. *Checking the faulty and missing material of the sites and arranging to resolve the issues. *Checking OSS status, Sites alarms , ESC Alarms. *Checking Link status and alarms. *Following for SDM Acceptance SOAC and PAC. *Link Monitoring in SO-EM Show less
-
-
-
FlipNet.
-
Iran
-
Telecommunications
-
1 - 100 Employee
-
Project TI Coordinator
-
Jul 2017 - Dec 2018
Implementation Engineer of new sites , modernization and relocation for RBS & links. *In charge of requesting the Ericsson material (Radio and Microwave) based on MTNI plan. *In charge of requesting the Huawei material (Radio and Microwave) based on MTNI plan. *In Charge of requesting material of Capacity Delivery in POIs. *Delivery coordination of material. *Checking the faulty and missing material of the sites and arranging to resolve the issues. *Requesting new material for site relocation and modernization. *Responsible of MW planning *Following Dismantle materials for FAC. Show less
-
-
-
-
TI Engineer
-
Jun 2016 - Jul 2017
Engineering , coordination and preparation Site folders of P7(U900 Installation , L1800 Installation , Antenna redesign , Modernization) ,Cut over , Cannibalized and Config BTS ,acceptance of Samin Sanat.
-
-
Project TI Coordinator
-
Aug 2015 - Jun 2016
MBB AssistantMBB CoordinatorTaliya CoordinatorCutover and dismantling CoordinatorU900 Coordinator Dismantle of Taliya CoordinatorLTE 2600 and Ant Redesign Coordinator Anntena Redesign & RRUS 2100 was Changed to RRUS 900 coordinatorAudit Phase-7 coordinatorWarehouse InventoryModernization // U900 Installation // L1800 Installation//Antenna redesign Coordinator
-
-
-
-
The internship
-
Jul 2014 - Sep 2014
-
-
Education
-
Islamic Azad University, South Tehran Branch
Master's degree, Network telecommunication -
University of Applied Science and Technology
Bachelor's degree, Interior design architecture -
Islamic Azad University
Bachelor’s Degree, Control Electrical Engineering -
haftetir high school
High School, Science