G.R Baghmisheh
Technical Manager at sepdco- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Persian -
-
Turkish -
-
English Professional working proficiency
Topline Score
Bio
khalil Farshdousti
Hi how are u good friend
Payam Motamed
he worked for this complicated work too hard and the final results which he received was so helpful for us not only as a detailed simulation report but also as a full practical work.
khalil Farshdousti
Hi how are u good friend
Payam Motamed
he worked for this complicated work too hard and the final results which he received was so helpful for us not only as a detailed simulation report but also as a full practical work.
khalil Farshdousti
Hi how are u good friend
Payam Motamed
he worked for this complicated work too hard and the final results which he received was so helpful for us not only as a detailed simulation report but also as a full practical work.
khalil Farshdousti
Hi how are u good friend
Payam Motamed
he worked for this complicated work too hard and the final results which he received was so helpful for us not only as a detailed simulation report but also as a full practical work.
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
sepdco
-
Iran
-
Oil and Gas
-
1 - 100 Employee
-
Technical Manager
-
Apr 2004 - Present
-
-
Technical Manager
-
Jan 2001 - Present
- Research New Project- Dynamic Simulation of Process- OTS (Operator training simulator) development- Process Monitoring and Soft Sensor system Development- Process Troubleshooting & De-bottle-necking - Conceptual Design- Flare Gas Recovery1- Define and perform Internal research project2. Preparing Technical & Financial Proposal for Tenders.3.Scheduling Activity of Project, Assignment Man Hour and Cost for Each Activities.4. Perform Training Course
-
-
-
Pars Oil and Gas Company (POGC)
-
Oil and Gas
-
100 - 200 Employee
-
Researcher
-
Aug 2013 - Present
The title of this project is "Using CO2 produced in Ethane Treatment Unit instead of Natural Gas In Flare Network for sweeping gas, purging gas or assists gas" This research provides an opportunity to reduce Natural Gas consumption in the process and also decrease the Greenhouse gases (GHG) releasing in flare tip. This project is feasibility study at which a conceptual design has been presented. The location of this project is in Asaloyeh of Iran. https://telegram.me/SEPDCO2 The title of this project is "Using CO2 produced in Ethane Treatment Unit instead of Natural Gas In Flare Network for sweeping gas, purging gas or assists gas" This research provides an opportunity to reduce Natural Gas consumption in the process and also decrease the Greenhouse gases (GHG) releasing in flare tip. This project is feasibility study at which a conceptual design has been presented. The location of this project is in Asaloyeh of Iran. https://telegram.me/SEPDCO2
-
-
-
Petro Amout
-
United States
-
Individual and Family Services
-
Head of Process
-
Jul 2016 - Sep 2018
https://telegram.me/SEPDCO2 https://telegram.me/SEPDCO2
-
-
-
-
Technical Consultant
-
Apr 2015 - Sep 2016
Design, Procurement, Fabrication of Grease production unit. Capacity: 24 ton/day Product: Calcium, Lithium, Clay Grease Design, Procurement, Fabrication of Grease production unit. Capacity: 24 ton/day Product: Calcium, Lithium, Clay Grease
-
-
-
RIPI
-
Iran
-
Oil and Gas
-
200 - 300 Employee
-
Developer
-
Aug 2014 - Jan 2015
1. Research in GTL (Gas to Liquid) Project (Conceptual Design) 2. Steady state GTL Fixed bed Reactor 1D & 2D simulation 3. Research in HTE (Heat Transfer Enhancement), Fast Air Cooler design 4. Development software 5- Development Web base Air Pollution system (PEMSYS) based on API, EPA including TANK & WASTE WATER SYSTEM. https://telegram.me/SEPDCO2 1. Research in GTL (Gas to Liquid) Project (Conceptual Design) 2. Steady state GTL Fixed bed Reactor 1D & 2D simulation 3. Research in HTE (Heat Transfer Enhancement), Fast Air Cooler design 4. Development software 5- Development Web base Air Pollution system (PEMSYS) based on API, EPA including TANK & WASTE WATER SYSTEM. https://telegram.me/SEPDCO2
-
-
-
OTCC
-
France
-
Retail Art Supplies
-
Researcher
-
Jan 2011 - Feb 2013
1-Dynamic Studies of Centrifugal Compressor Anti Surge for unit 106 of 20 and 21 phases of South Pars Company 2-Flow Assurance and Dynamic Analysis of Qeshm Oil Pipeline 3- Study of Lubricant Air cooler Impact on Gas Turbine Air Intake 1-Dynamic Studies of Centrifugal Compressor Anti Surge for unit 106 of 20 and 21 phases of South Pars Company 2-Flow Assurance and Dynamic Analysis of Qeshm Oil Pipeline 3- Study of Lubricant Air cooler Impact on Gas Turbine Air Intake
-
-
-
Iranian Offshore Oil company
-
Oil and Gas
-
400 - 500 Employee
-
Researcher
-
Oct 2010 - Jan 2013
1. Decreasing H2S from crude oil 2. Optimization of TEG Process of SALMAN Platform to Decrease Malfunction of Re-boiler 3. Preparing and Construction of Operator Training Simulator for SIRI NGL 1. Decreasing H2S from crude oil 2. Optimization of TEG Process of SALMAN Platform to Decrease Malfunction of Re-boiler 3. Preparing and Construction of Operator Training Simulator for SIRI NGL
-
-
-
BIPC (Bandar Imam Petrochemical)
-
200 - 300 Employee
-
Researcher
-
Jan 2002 - Jan 2012
1. Petrochemical Projects Aromatic Plant Feed Capacity Enhancement. 2. Economic and Technical Evaluation Process for TDS Aromatic Plant Bandar Imam 3. Optimization of BTX Tower Imam to Extract Pure Toluene 4. Investigation of Control Philosophy of Benzene/ Toluene/ Xylene Distillation Column of BANDAR Imam Petrochemical 1. Petrochemical Projects Aromatic Plant Feed Capacity Enhancement. 2. Economic and Technical Evaluation Process for TDS Aromatic Plant Bandar Imam 3. Optimization of BTX Tower Imam to Extract Pure Toluene 4. Investigation of Control Philosophy of Benzene/ Toluene/ Xylene Distillation Column of BANDAR Imam Petrochemical
-
-
-
South Pars Gas company
-
Iran
-
Oil and Gas
-
100 - 200 Employee
-
Researcher
-
Jan 2002 - Jan 2012
1. Design and fabrication of integrated monitoring and management system using modeling Soft Sensor for Gas Phases 6, 7 and 8 of South Pars Gas Complex. Environmental, Energy and Flare estimation system based on DCS data 2. Economic and technical Feasibility study for reducing flare gas and proposing flare gas estimation method in Asalouyeh 3. Design and fabrication of integrated monitoring and management system using modeling Soft Sensor for Gas Phases 4& 5 of South Pars Gas Complex. 4.Optimization of ethane recovery refrigeration of phases 4 and 5 of South Pars 5. 4th South Pars Gas Refinery Capacity Enhancement Investigation 6. Feasibility Study of Using Carbon Dioxide as Purging / Sweeping Gas in Flare System 7. Reusing DSO (Disulphide Oil), by product of Merox unit, in other plants 8. Redesign Propane Refrigerant Compressor Anti Surge Control Philosophy Show less
-
-
-
TEHRAN JONOOB
-
Construction
-
1 - 100 Employee
-
Contractor
-
Jan 2011 - 2012
Flow Assurance and Dynamic Analysis of Yadavaran Oil Pipeline Filed Flow Assurance and Dynamic Analysis of Yadavaran Oil Pipeline Filed
-
-
-
-
Researcher
-
Sep 2006 - Aug 2007
- Preparing a Energy Monitoring System (EMS) - Preparing a Energy Monitoring System (EMS)
-
-
Education
-
Sharif University of Technology
Doctor of Philosophy (Ph.D.), Chemical Engineering -
Sharif University of Technology
Master of Science (M.Sc.), Chemical Engineering, Control, Simulation -
Sahand University of Technology
BS, Chemical Engineering -
Shahid madani
High School, Major