Badrulhisham Awang Baharu

Project Engineer at PETRONAS Technical Services Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Kuala Lumpur, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oil and Gas
    • 100 - 200 Employee
    • Project Engineer
      • May 2023 - Present

    • Malaysia
    • Oil and Gas
    • 100 - 200 Employee
    • Planning Engineer
      • Aug 2022 - Feb 2023

    • Malaysia
    • Oil and Gas
    • 400 - 500 Employee
    • Planning Engineer
      • Mar 2022 - Sep 2022

    • Malaysia
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Project Planner
      • Apr 2021 - Feb 2022

    • Malaysia
    • Chemical Manufacturing
    • 700 & Above Employee
    • Planning Engineer
      • Nov 2018 - Apr 2021

    • Oil and Gas
    • 100 - 200 Employee
    • Planning Engineer
      • Sep 2011 - Apr 2018

      Providing excellent support for the Senior Planner in developing and maintaining integrated 90/28/7- day plans on all production operations and maintenance activities for PML operated assets Provide a proactive planning service to support all phase on/ offshore work Provide resource planning, scheduling and allocation; detailed plans and the appropriate progress reports Support production and facilities, developing plans for major projects and shutdowns Ensure accurate integrated project plans are maintained and communicated to all levels for the productions / operations / maintenance Communication with external suppliers / contractors / vendors for planning progress information and feedback Manage the interface between the planning applications and the maintenance management systems Ensure the delivery of materials and equipment in line with the plan To collate and provide status reports to the operations Superintendent Ensure short-terms critical tasks are reviewed on a priority basis Ensure plans are co-ordinate with logistics. Any other instruction deems necessary by the management in order that the project being executed within the Specific time, cost, performance and quality without jeopardizing the health safety and environment. Show less

    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Project Controls Engineer
      • Jul 2013 - Sep 2013

      Management action, either pre-planned to achieve the desired result or taken as a corrective measure prompted by the monitoring process. Liaison between the project manager and the technical disciplines involved in a project. Responsibilities include schedule preparation, pre-planning and resource forecasting for engineering and other technical activities relating to the project. Be in charge of performance management. To assure the accuracy of financial forecasts, which tie-in to project schedules. To ensure projects are completed according to project plans. Project engineers manage project team resources and training and develop extensive project management experience and expertise. Responsible to align project teams are structured so that multiple specialty disciplines report to the project engineer, then two important responsibilities of the project engineer are inter-discipline coordination. Show less

    • Malaysia
    • Oil and Gas
    • 300 - 400 Employee
    • Lead Scheduler
      • Nov 2012 - Jun 2013

      To prepare the turnaround preparation and execution schedules showing key activity schedule and duration, early and late start dates, early finish and late finish dates, total and free float and the critical path of the turnaround. Liaise with Turnaround Area Coordinators and Contractors to report to the Turnaround Manager on areas of concern relating to progress and assessment of operating levels to ensure duration is met. Produce daily 'S' curves to monitor the same. Monitor the extra/additional work and the effect to the Turnaround Plan Schedule. Ensure the Area Coordinators update the daily plan to reflect the actual status of developments. Show less

    • Oil and Gas
    • 700 & Above Employee
    • Planning Engineer
      • Jun 2010 - Sep 2011

      Responsibilities include schedule preparation, pre-planning and resource forecasting forengineering and other technical activities relating to the project.Be in charge of performance management.To assure the accuracy of financial forecasts, which tie-in to project schedules.To ensure projects are completed according to project plans.Project engineers manage project team resources and training and develop extensive project management experience and expertise.Responsible to align project teams are structured so that multiple specialty disciplines report to the project engineer, then two important responsibilities of the project engineer are inter-discipline coordination. Show less

    • Offshore Planner
      • Dec 2008 - Jun 2010

      Reporting to Construction Superintendent and Project ManagerPrepare Project Overall ScheduleResponsible in updating Project Construction “S” Curve in daily basis during project execution.Coordinate with, sub-contractors and vendors on all issues pertaining to project.Prepare Weekly & Daily Progress and Activity ReportEstablish construction manpower distribution & manpower histogram.Highlights any area of concern raise during project executionPrepare and discuss action plan to catch-up schedule progress as per CPN (Critical path network).Prepare manpower loading and work schedule breakdown.Prepare supplementary planning/ schedule package for additional particular assignment such as siteInstruction works, including estimation of manpower and equipment to be used.Assist supervision fabrication and installation of structures and piping.Represent as safety committee on safety activity i.e. meeting and walkout visit.Manage and coordinate planning team to plan, monitor and track work progress.Reschedule project plan (when necessary) to suit project work pack planning. Planning analysis to identifyproblem area and propose corrective solution to resolve the matters. Record all weather, equipment & operation down time.Manage site personnel welfare Show less

    • Malaysia
    • Oil and Gas
    • 400 - 500 Employee
    • Planner / Scheduler
      • Jun 2008 - Nov 2008

      Reporting to Construction Manager and Project Manager Prepare Project Overall Schedule Responsible in updating Project Overall Schedule and Procurement & Construction “S” Curve in weekly basis during pre shut down & daily basis during shutdown mechanical day. Prepare Weekly & Daily Progress and Activity Report Establish construction manpower distribution & manpower histogram. Responsible to establish equipment loading & advice project team Highlights any area of concern raise during project execution Prepare and discuss action plan to catch-up schedule progress as per CPN (Critical path network). o Prepare manpower loading and work schedule breakdown. Prepare supplementary planning/ schedule package for additional particular assignment i.e. additional o Works, including estimation of manpower and equipment to be used. Assist supervision fabrication and installation of structures and piping. Manage and coordinate planning team to plan, monitor and track work progress. Reschedule project plan (if necessary) to suit project work pack planning. Planning analysis to identify problem area and propose corrective solution to resolve the matters. Show less

Education

  • Universiti Tun Abdul Razak (UNIRAZAK)
    Bachelor Of Management (Hons), Bachelor of management
    2021 - 2023
  • Universiti Teknologi MARA
    Diploma, Business Administration and Management, General
    1997 - 2000

Community

You need to have a working account to view this content. Click here to join now