Azamat Omarov
E&I QC INSPECTOR at GATE (GAMA-TEKFEN)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
GATE Construction
-
Kazakhstan
-
Construction
-
200 - 300 Employee
-
E&I QC INSPECTOR
-
Aug 2017 - Present
Electrical & Instrumentation Quality Control Inspector on the Tengiz field / "FUTURE GROWTH PROJECT" TCO (TengizChevroil) Reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project plan preparation. Coordinating with Contractor for making quality work schedule, Monitoring of work progress, provide technical help for any concern, making outstanding quality reports with Inspection plan. Represent Company during weekly meeting concerning schedule Quality plan activity and project plan for construction. Performing inspection for all E&I equipment’s installations, hookup, loop checking and functional testing are in compliance with the technical requirement according to the project specification. Inspection of cable installation including cable trays, cable glands, termination, insulation resistance, continuity testing etc. Witnessing all tests including verification and calibration of instruments and safety devices Inspection of Fiber optic cable installation Inspection of High voltage system up to 35KV, Diesel generator, power transformer, Switchboard & HVAC Panel, Lighting and Earthing system Performing inspection for all E&I equipment’s installations,are in compliance with the technical requirement according to the project specification. Closing check list and Acts. Red Line Mark Up on drawings for E&I and Telecom Disciplines.
-
-
-
ISKER Group
-
Kazakhstan
-
Construction
-
400 - 500 Employee
-
Electrical & Instrumentation QA/QC Inspector
-
Jul 2016 - Aug 2017
Name of Company: ISKER Group (Main contractor) Name of Project: Sub-Project: EWRP / Project: KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAMME Client: NCOC-North Caspian Operating Company ( AgipCaspian Sea B.V. (Eni) / Total / ExxonMobil / Royal Dutch Shell / CNPC / Inpex / KMG Kashagan B.V. ) Daily monitoring/inspections of electrical and instrumentation, fire and gas, telecom system during construction and commissioning. Controlling contractor procedures, inspection and test plans and other technical and quality documents, to ensure effective controls. Performing inspection for all E&I equipment’s installations, hookup, loop checking and functional testing are in compliance with the technical requirement according to the project specification. Inspection of High voltage system up to 35KV, Diesel generator, power transformer, switchboard, UPS, lighting, earthing and heat tracing system. Inspection of cable installation including cable trays, cable glands, termination, Hipot, insulation resistance, continuity testing etc. Witnessing all tests including verification and calibration of instruments and safety devices. Inspection of Fiber optic cable installation, daily and weekly reports (nonconformities reports). Weekly monitoring equipment preservation. Pre-inspection for project completion team, pre-walk down. Work with internationals codes and standards relating to E&I works such as BS/IEC/ISO/GOST/ATEX. Red Line Mark Up on drawings for E&I and Telecom Disciplines. Closing check list and punch list.
-
-
-
-
Electrical & Instrumentation QA/QC ENGINEER,Atyrau Refinery Plant modernization
-
Jan 2016 - Jun 2016
Inspection of the E&I activities Follow up “ Inspection and Test Plan “ (ITP)Insure that there is a strong health and safety culture when executing worksInspection of the work force for to have the correct competency and certificatesInspection of the material dept to ensure that materials have all needed documentation before start of workInspect and verify E&I activities is perform after current procedures/instruction and specificationTake actions whenever there are persons violating rules and procedures.Give input to develop the site: Equipment, personnel, organization.
-
-
Electrical & Instrumentation FOREMAN,Bolashak Oil and Gas Processing Plant (Karabatan)
-
Jan 2012 - Jan 2016
Controlling all E&I scopes, planning, giving daily report to Supervisor. The main task secondary cable tray installation, secondary cable pulling for the E&I equipments, junction box installation, cable glanding and termination, Instrument equipments installation, air line tubing installation, Fire & Gas system equipments installation.
-
-
-
-
Electrical & Instrumentation Technician,Bolashak Oil and Gas Processing Plant (Karabatan)
-
Nov 2008 - Dec 2011
Electrical equipment installation Instrument equipment installation Telecom equipment installation Electrical, Instrumentation, Telecom cable pulling, glanding, termination. "Cable joints" Cable ladder/tray installation Electrical equipment installation Instrument equipment installation Telecom equipment installation Electrical, Instrumentation, Telecom cable pulling, glanding, termination. "Cable joints" Cable ladder/tray installation
-
-
Education
-
Atyrau Institute of Oil and Gas, Atyrau
Energy Engineer, Power engineering