Ayush Srivastava
Prozessmanager iTWO/BIM at B&O Gruppe- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
German Professional working proficiency
-
Hindi Native or bilingual proficiency
Topline Score
Bio
Experience
-
B&O Gruppe
-
Germany
-
Facilities Services
-
1 - 100 Employee
-
Prozessmanager iTWO/BIM
-
Mar 2023 - Present
-
-
-
BATEG GmbH
-
Germany
-
Construction
-
1 - 100 Employee
-
Prozessmanager iTWO und BIM
-
Jan 2021 - Feb 2023
Development of the strategic and operational implementation in the BIM and iTWO, taking into account of the digitization concepts. 4D Modeling and Kalkulation of the projects (erweiterter Rohbau und Ausbau). Execution, Optimization of the projects according to VOB (Vergabe- und Vertragsordnung für Bauleistungen). Development of the strategic and operational implementation in the BIM and iTWO, taking into account of the digitization concepts. 4D Modeling and Kalkulation of the projects (erweiterter Rohbau und Ausbau). Execution, Optimization of the projects according to VOB (Vergabe- und Vertragsordnung für Bauleistungen).
-
-
-
IBT.PAN Ingenieur- und Sachverständigengesellschaft mbH
-
Germany
-
Architecture and Planning
-
1 - 100 Employee
-
BIM Koordinator (Team Hochbau)
-
Apr 2020 - Oct 2020
•Project development and 3D modeling of the Project Deutsche Wohnung Construction and Facilities GmbH Marienhain, Berlin Köpenick. •Execution, Optimization, and Detailed Planning of the project according to HOAI_Leistungsphase 3 to 5. •Creation of 3D models of Planning buildings, underground garages, and the surrounding area as Ausführungsplanung. •Project development and 3D modeling of the Project Deutsche Wohnung Construction and Facilities GmbH Marienhain, Berlin Köpenick. •Execution, Optimization, and Detailed Planning of the project according to HOAI_Leistungsphase 3 to 5. •Creation of 3D models of Planning buildings, underground garages, and the surrounding area as Ausführungsplanung.
-
-
-
Technische Universität Berlin
-
Germany
-
Education Administration Programs
-
700 & Above Employee
-
Building Sustainability Management (MBA)
-
Oct 2016 - Oct 2019
• Asset management with a Smart/ Sustainable building concept.• Special Modules such as Energy Performance of building, Project Management, Real Estate Economics, Life Cycle, and Facility Management.
-
-
Master Thesis Project
-
May 2019 - Sep 2019
Master Thesis topic- Investigation and Optimization of BIM-Based Crowd Simulation for Railway Station Safety.• The research aim of this thesis is to investigate and optimize railway station safety through BIM-based crowd simulation.• Tools, techniques, and implementation of BIM and crowd simulation in the case of railway stations have been analyzed.• Created a framework and identified the best possible format for data configuration exchange between BIM and crowd simulation tool.• This research will help identify the importance of BIM-based crowd simulation and its integral part of building management which will support the safety of the crowd over the lifetime of a railway station. Final thesis Grade- 1,8 (gut)
-
-
Seminar Thesis: FUTURE PERSPECTIVES OF SMART BUILDING SECURITY WITH VOICE BIOMERIC SECURITY
-
Apr 2017 - Jul 2017
Compulsory Elective Smart Buildings• This paper focuses on the key research topics through a wide-ranging survey of the latest development in Smart buildings which offers strategic principles aligning to the “Voice Biometric Identifier” (VBI).• Current voice recognition system.• Challenges with Voice biometric identifier remain now (Case study).• Future work.
-
-
Seminar Thesis: ENERGY EFFICIENCY OF CITY WITH USAGE OF LOCAL PUBLIC TRANSPORT
-
Apr 2017 - Jul 2017
This paper focuses on how city local public transport may help to improve the energy efficiency of the urban transport system. Estimated the status of both energy use and the present energy efficiency of the public transportation system. • Research Question- How to measure the energy efficiency of private/ public transportation?• Evaluated the efficiency of Single vehicle, Individual trip, and multiple transportation systems• Considered the ASI- concept (avoid-shift-improve) and it's principal. • Presented various case study of ASI successful model, such as the Seoul public transportation system, Tokyo’s railways, • Presented Mobility Benefit, Environmental Benefit, and Social Benefit.
-
-
-
Deutsche Bahn
-
Rail Transportation
-
700 & Above Employee
-
Internship/ Praktikant- Projektmanagement und Projektentwicklung
-
Mar 2019 - May 2019
Building Information Modelling/ 3D-Modellierung of central railway stations in Germany. • Project Development and Modernisation of Stations, Reception building, and surrounding areas. • Building Information Modelling (BIM) Implementation for Railway Stations Development. • Designed the 3D model to achieve sustainable urban planning. Developed 3D visualization and real-time simulation of Neumünster Hauptbahnhof. • Modeling the reception building of the Ingolstadt Hauptbahnhof. • Developed 3D for Virtual Reality and Real-time simulation for rendering to understand the design better.
-
-
-
Arcadis
-
Netherlands
-
Professional Services
-
700 & Above Employee
-
Project: Next Step of ISO 50001 Energy Management Systems
-
Nov 2017 - Feb 2018
To develop a strategy to reach the next level in the Arcadis ISO 50001, considering actual company data, strategies and targets. Include ISO 9001 and ISO 14001 to measure energy consumption, energy-saving solution, and identified energy cost concerns. Target documentation & tracking, decision making, useful reports, and KPI sets expedient measures and a promising strategy for performance-oriented energy management. Evaluating energy DATA of heating, electricity, transportation and CO2 emission. Strategy Development. Data Analytics/ Data Security in Energy Management Systems Technical aspect to improve Energy Management Systems.
-
-
-
Sitab Shree Contractors & Suppliers
-
Auraiya, India
-
Project Engineer
-
Aug 2014 - Aug 2016
Working as Project Engineer for contracting firm undertaking public projects under GAIL (Gas Authority of India Ltd) and Rural Engineering Department (RED) for the rural infrastructure like public roads and public buildings. • Managed various commercial construction projects including school, hospital, public roads and lead a team of 5. • Developed and successfully maintained project schedules, contractor coordination, cost estimation, material scheduling, and Client billing. • Successfully completed the project on time with cost savings as the planned budget by using the MS-project. • Prepared periodical MIS (Management Information System) reports to monitor Resource and Budgets. Developed periodical MOM (Minutes of Meeting) reports for change management.
-
-
-
CSIR- Unit for Research and Development of Information Products (URDIP)
-
India
-
Research Services
-
200 - 300 Employee
-
Research Internship
-
Jun 2013 - Aug 2013
Completed summer internship from Central Road Research Institute (CSIR-CRRI). Undertaken a Sustainable research project “To check the feasibility of the use of Construction and Demolition (C&D) waste in road construction work". • Research project under Chief Scientist Mr. Sudhir Mathur in the Geotechnical Division. • Managed a team of 2, conducted various laboratory and field compaction tests to determine the strength, material, and costs. • Got exposure regarding the properties and composition of construction and demolition waste • Subbase course soil tested for Rigid-pavement and highways roads. • Managing the labor, material, machine and prepared the detailed report on “Feasibility of construction and demolition waste in road construction work”. • Successful research findings are reusing the waste materials lowers around 30% of the original construction cost.
-
-
Education
-
Technische Universität Berlin
MBA- Building Sustainability Management Methods for Energy Efficiency, Smart/ Sustainable Building -
Bharati Vidyapeeth
Bachelor of Technology (B.Tech.), Civil Engineering -
Bharati Vidyapeeth
Diploma in Network Security, Network and System Administration/Administrator -
John Milton Public, School
11th and 12th -
St. Augustine Senoir Secondary
10th