Ayu Diani Aquarista

Staff Industrial Engineering at PT. Selalu Cinta Indonesia
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Salatiga, Central Java, Indonesia, ID
Languages
  • Bahasa Inggris Limited working proficiency
  • Bahasa Indonesia Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Microsoft Certified : Azure AI Fundamental
    Microsoft
    Nov, 2021
    - Nov, 2024

Experience

    • Indonesia
    • Spectator Sports
    • 400 - 500 Employee
    • Staff Industrial Engineering
      • Apr 2023 - Present

      - Improving production efficiency with line balancing processes, analyzing manpower needed and machine utilization on periodically in the bottom and stockfit areas- Standardize output target and flow process time by updating the cycle time per process by model- increase productivity and minimize expenses by continuous improvement processes in the bottom and stockfit areas- Minimizing problems in production by analyzing actual output data to find bottlenecks and pouring them into daily reports- contribute to checking PPH by analyzing output data, man power and work hours every day and then putting it in the report on the yamazumi chart- Design new layouts for manufacturing to improve work efficiency Show less

    • Staff Modernization Machine Analyst
      • Feb 2022 - Apr 2023

      -Continuous improvement processes using modern cutting machines to increase performance of modern cutting machines in order to increase productivity and reducing MPP- Make improvements to modern cutting machines by trial to cut various types of materials and component shapes, so that more types of materials can be cut on modern machines and make reports every bi-weekly- Standardize flow process to increase work process efficiency by making OPCs for each shoe model- Modern cutting machine loads are used ideally and minimize problems with tracking OEE data and analyzing through PDCA to understand various problems in production- Check the machine is used ideally and problems in production with tracking OEE data and analyze with PDCA report Show less

    • Indonesia
    • Government Administration
    • 100 - 200 Employee
    • Internship Trainee
      • Jul 2021 - Sep 2021

    • Indonesia
    • Higher Education
    • 300 - 400 Employee
    • Assistant Lecturer
      • Sep 2017 - Dec 2020

      Assistant for mathematics I & II, physics I & II, basic electronics, and practicum I courses

    • Faculty's Assistant Coordinator
      • Jan 2019 - Dec 2019

      Assistant Coordinator of the Electronic and Computer Engineering Faculty

    • Research Intern
      • May 2020 - Sep 2020

      Conducted research with the title "Simulation of Hexagon Ultra Wideband Patch Microstrip Antenna Design at C-Band Frequency" which assisted by a supervisor Conducted research with the title "Simulation of Hexagon Ultra Wideband Patch Microstrip Antenna Design at C-Band Frequency" which assisted by a supervisor

    • Research Intern
      • Sep 2019 - Feb 2020

      Conducted a research of "Simulation and Comparative Analysis of Rectangular and Elliptical Circle Patch Microstrip Antennas at a Frequency of 2300 MHz" and assisted by a supervisor Conducted a research of "Simulation and Comparative Analysis of Rectangular and Elliptical Circle Patch Microstrip Antennas at a Frequency of 2300 MHz" and assisted by a supervisor

Education

  • Universitas Kristen Satya Wacana
    Gelar Sarjana, Teknik Elektro dan Komunikasi
    2016 - 2021
  • SMA Negeri 4 Semarang
    2013 - 2016

Community

You need to have a working account to view this content. Click here to join now