Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Wes Buchanan

I have known Austin now for a few years. I first meet him when he was a student in three of my classes at the Colorado School of Mines. He impressed me in those classes with his willingness to learn and his questioning of material and how it would apply in the real world. After those classes, we kept in touch and a followed him through his early jobs. Even through the downturns, he kept a good attitude and was able to find work and branch out into new and different fields. Austin returned to Mines to work on a Master's degree and I jumped at the chance to have him as a Teaching Assistant for a summer field related class. Again, Austin impressed me with his work ethic and good attitude and willingness to get the job done. Austin has the academic background, work ethic, and correct attitude to preserve and excel in any petroleum related field.

Amit Sharma

Austin responded very well to fast paced learning environment of Schlumberger Field Engineer trainee. He is a quick learner. This allowed him to take on the responsibilities of standalone wellsite engineer during his training days. He adapts well to changes evident from his responses to last minute changes in schedule, assignment, team or working conditions. His commitment to excellence stands out as his most impressive quality to me. He is always looking for opportunities to improve himself, seeking feedback and listening intently to all suggestions. It has been a great experience working with Austin and I wish him good luck for a bright future ahead.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Well Control - Wellsite Supervisor
    Petroleum Educational Services Inc.
    Nov, 2022
    - Sep, 2024
  • Unconventional Reservoir Geomechanics
    Stanford University
    Mar, 2020
    - Sep, 2024
  • Light Vehicle Defensive Driving
    Schlumberger
    Aug, 2019
    - Sep, 2024
  • SafeLand/SafeGulf
    PEC
    Aug, 2019
    - Sep, 2024

Experience

    • United States
    • Oil and Gas
    • 100 - 200 Employee
    • Completions Engineer
      • Jan 2022 - Present

      Supervised all parts of well completions process from drilling rig release to first production. Designed and implemented hydraulic fracture and drillout campaigns in the Permian basin. Supervised all parts of well completions process from drilling rig release to first production. Designed and implemented hydraulic fracture and drillout campaigns in the Permian basin.

    • Government Administration
    • 1 - 100 Employee
    • Data Analyst
      • May 2021 - Dec 2021

      Developed statistical model focused on tracking and forecasting economic impact of the American Relief Plan Act (ARPA) in the Denver metro area. Developed statistical model focused on tracking and forecasting economic impact of the American Relief Plan Act (ARPA) in the Denver metro area.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Field Engineer 1
      • Jun 2019 - Jul 2020

      Hydraulic fracturing field engineer in the Williston basin. (Bakken and Three Forks) Hydraulic fracturing field engineer in the Williston basin. (Bakken and Three Forks)

    • Field Engineer Intern - Drilling Tools
      • Jun 2018 - Aug 2018

      Operated TrackMaster wellbore departure whipstock in both open and cased holes. Upon failure analysis and recommendations, decreased failure rates in MidCon region by 15%. Operated TrackMaster wellbore departure whipstock in both open and cased holes. Upon failure analysis and recommendations, decreased failure rates in MidCon region by 15%.

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Production Engineering Intern
      • May 2017 - Aug 2017

      Artificial lift and waterflood optimization in a maturing Big Horn basin waterflood. Lift optimization for gas production in the Green River basin. Artificial lift and waterflood optimization in a maturing Big Horn basin waterflood. Lift optimization for gas production in the Green River basin.

    • Production Engineering Intern
      • May 2016 - Aug 2016

      Artificial lift optimization in a large (600,000+ bpd total fluid), urbanized, mature waterflood. Artificial lift optimization in a large (600,000+ bpd total fluid), urbanized, mature waterflood.

Education

  • Colorado School of Mines
    Master of Science - MS, Mineral and Energy Economics
    2020 - 2022
  • Colorado School of Mines
    Bachelor of Science - BS, Petroleum Engineering
    2015 - 2019

Community

You need to have a working account to view this content. Click here to join now