Atul Patel

MEP CAD Technician (SC Cleared) at NG BAILEY LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pinner, England, United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • MEP CAD Technician (SC Cleared)
      • Nov 2018 - Present

      November 2018 – Present Working on a high Integrity Nuclear Facility for AWE, Producing 2d Mechanical & Electrical drawings for this project. Also part of the QA Checking team responsible for drawing compliance & certification. November 2018 – Present Working on a high Integrity Nuclear Facility for AWE, Producing 2d Mechanical & Electrical drawings for this project. Also part of the QA Checking team responsible for drawing compliance & certification.

    • United Kingdom
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • M&E CAD Technician
      • Jun 2018 - Nov 2018

      Working on various small AV projects, Producing 2d M&E layouts, elevations and rack details, relating to LCD Displays, touch screens, projectors, audio systems, controls, cabling and video conferencing. Working on various small AV projects, Producing 2d M&E layouts, elevations and rack details, relating to LCD Displays, touch screens, projectors, audio systems, controls, cabling and video conferencing.

    • United Kingdom
    • M&E CAD Technician
      • Apr 2018 - May 2018

      Producing 2d M&E drawings for a Residential development in Nigeria. (Short term contract) Producing 2d M&E drawings for a Residential development in Nigeria. (Short term contract)

    • MEP CAD Technician
      • Feb 2015 - Apr 2018

      Working on Project Allenby/Connaught, an Army Basing programme consisting of new living accommodation, sports facilities, medical & dental surgeries and dining centres for Army personnel due back from overseas duty. My responsibilities were to Produce 2d Mechanical & Electrical drawings for these facilities. I was also responsible for the issuing and distribution of all the architectural drawings that came from GDS Cad format for this project. Working on Project Allenby/Connaught, an Army Basing programme consisting of new living accommodation, sports facilities, medical & dental surgeries and dining centres for Army personnel due back from overseas duty. My responsibilities were to Produce 2d Mechanical & Electrical drawings for these facilities. I was also responsible for the issuing and distribution of all the architectural drawings that came from GDS Cad format for this project.

    • MEP CAD Technician
      • Aug 2014 - Feb 2015

      Working on the Redevelopment project of Terminal 2. I was responsible for Producing 2d record drawings for lighting & small power layouts, plantrooms, containment & fire alarm layouts. Working on the Redevelopment project of Terminal 2. I was responsible for Producing 2d record drawings for lighting & small power layouts, plantrooms, containment & fire alarm layouts.

    • United Arab Emirates
    • Computer and Network Security
    • 100 - 200 Employee
    • M&E CAD Technician
      • Aug 2011 - Aug 2014

      Atkins Global, Epsom, Surrey. Client confidential – MEP CAD Technician (SC Cleared) Working on a high Integrity Nuclear Facility for AWE, Producing 2d Mechanical & Electrical drawings for this facility. (2 months experience of updating 3d models using Autocad MEP). Atkins Global, Euston Tower, London. MEP CAD Technician Producing 2d MEP drawings for the new King Abdul’Aziz International Airport in Jeddah, Saudi Arabia, due to become the world’s largest airport when completed in 2015. I was involved in producing all aspects of MEP drawings with teams here in the UK and Atkins Bangalore. Show less

    • Cad Draughtsman
      • May 2011 - Jul 2011

      Electrical Services CAD Draughtsman May 2011 – July 2011(3 months) Working on a Project called Saffron Square, A 45-storey tower incorporating a light feature to the Croydon skyline. My main Duties included production of lighting and small power layouts, containment drawings, fire alarm and security layouts using AutoCAD 2012. . Electrical Services CAD Draughtsman May 2011 – July 2011(3 months) Working on a Project called Saffron Square, A 45-storey tower incorporating a light feature to the Croydon skyline. My main Duties included production of lighting and small power layouts, containment drawings, fire alarm and security layouts using AutoCAD 2012. .

    • Electrical Services CAD Draughtsman
      • Jan 2011 - May 2011

      Working on the Waldorf Astoria Hotel project at Syon Park. My main duties were to produce As Fitted record drawings for all the electrical drawings on the project, liaising with the electrical contractor to get the Information required. I also helped with some mechanical drawings, producing ductwork and pipework layout drawings using AutoCAD 2011. Working on the Waldorf Astoria Hotel project at Syon Park. My main duties were to produce As Fitted record drawings for all the electrical drawings on the project, liaising with the electrical contractor to get the Information required. I also helped with some mechanical drawings, producing ductwork and pipework layout drawings using AutoCAD 2011.

    • Electrical Building Services CAD Draughtsman
      • Sep 2008 - Dec 2010

      Electrical Building Services CAD draughtsman using Autocad 2010, CADduct & Navis works & CMPIC. Worked on the Bronzfield Prison Project. My main Duties included production of lighting and small power layouts, containment drawings, single line diagrams, switchroom layouts, fire alarm and security layouts. Also working on the EDF West Burton Power Station Project. Duties include production of containment drawings, containment supports and switchroom layouts. While working on the EDF Power Station Project I was asked to join the cable management team routing cables. This involved routing HV/LV cables within the boundaries of the EDF site using Configuration Managed Project Integrated Cabling (CMPIC) software supplied by Cloudis Ltd. Show less

    • Electrical Building Services CAD Draughtsman using Autocad
      • Aug 2004 - Aug 2008

      Electrical Building Services CAD draughtsman using Autocad & CADuct 2004. Part of a large Heathrow Terminal 5 (T5) team. The total value of this job is £4.2 billion and is not due for completion until 2008. My main duties included production of lighting and small power layouts, containment drawings, single line diagrams, switchroom layouts, fire alarm and security layouts and ductwork & pipework Layout drawings. Electrical Building Services CAD draughtsman using Autocad & CADuct 2004. Part of a large Heathrow Terminal 5 (T5) team. The total value of this job is £4.2 billion and is not due for completion until 2008. My main duties included production of lighting and small power layouts, containment drawings, single line diagrams, switchroom layouts, fire alarm and security layouts and ductwork & pipework Layout drawings.

    • Electrical Building Services CAD Draughtsman using AutoCAD 2004
      • Aug 1999 - Jul 2004

      Electrical Building Services CAD draughtsman using AutoCAD 2004. Working on two major projects: Princess Margaret Hospital, Swindon & GCHQ Cheltenham. Duties included production of lighting and small power layouts, containment drawings, single line diagrams, switchroom layouts, fire alarm and security layouts. Ventilation Layout drawings using Cymap CSE with AutoCAD 2000. Electrical Building Services CAD draughtsman using AutoCAD 2004. Working on two major projects: Princess Margaret Hospital, Swindon & GCHQ Cheltenham. Duties included production of lighting and small power layouts, containment drawings, single line diagrams, switchroom layouts, fire alarm and security layouts. Ventilation Layout drawings using Cymap CSE with AutoCAD 2000.

    • Electrical Building Services CAD draughtsman using Microstation
      • Aug 1997 - Aug 1999

      Electrical Building Services CAD draughtsman using Microstation and AutoCAD R14, work included 2 major projects: ‘New Research Institute’ for Pliva Pharmaceuticals (Zagreb, Croatia), 700 room R&D facility. Full E&I services. ‘Petro 2 plant’ for R.J.Reynolds Tobacco (St.Petersburg, Russia), Installation of 40 Photos cigarette making machines, complete with full electrical services. Duties included production of lighting and small power layouts, containment drawings, single line diagrams, switchroom and sub-station layouts, fire alarm and security layouts, co-ordination drawings. Show less

Education

  • East Warwickshire College Of Further Education
    Higher Technicians Certificate, Electrical Engineering
    1980 - 1982
  • East Warwickshire College Of Further Education
    Ordinary Technicians Certificate, Electrical Engineering
    1978 - 1980
  • Newbold Grange Secondary School
    GCE ‘O’ Levels, Maths, English Language, English Literature, Technical Drawing, Physics, Biology.
    1974 - 1978

Community

You need to have a working account to view this content. Click here to join now