Athar Husain

Assistant Manager ( 30MW CPP Project ) at Filatex india ltd
  • Claim this Profile
Contact Information
Location
Ahmedabad, Gujarat, India, IN
Languages
  • English Professional working proficiency
  • Hindi Full professional proficiency
  • Gujarati Native or bilingual proficiency
  • Urdu Elementary proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • ASNT NDT Level II Certification - Liquid Penetrant Testing (PT) (ASNT-NDT2-PT)
    ASNT (The American Society for Nondestructive Testing)
    Aug, 2019
    - Sep, 2024
  • ASNT NDT Level II Certification - Magnetic Particle Testing
    ASNT (The American Society for Nondestructive Testing)
    Aug, 2019
    - Sep, 2024
  • ASNT NDT Level II Certification - Ultrasonic Testing
    ASNT (The American Society for Nondestructive Testing)
    Aug, 2019
    - Sep, 2024
  • ASNT NDT Level III Certification - Radiographic Testing (ASNT-NDT3-RT)
    ASNT (The American Society for Nondestructive Testing)
    Aug, 2019
    - Sep, 2024
  • Energy Auditor
    Bureau of Energy Efficiency
    Jan, 2019
    - Sep, 2024
  • Energy Manager
    Bureau of Energy Efficiency
    Jan, 2018
    - Sep, 2024
  • Boiler Operation Engineer ( B.O.E. )
    Government of Gujarat
    Dec, 2016
    - Sep, 2024
  • L1 & L2 safety Program
    Thermax Inc. USA
    Jul, 2015
    - Sep, 2024

Experience

    • Textile Manufacturing
    • 200 - 300 Employee
    • Assistant Manager ( 30MW CPP Project )
      • Jul 2020 - Present

      - Civil work, Erection , Commissioning and Operation of thermal power plant having Boilers and Turbines, Auxiliaries and WTP- 130 TPH IR-CFBC Boiler, 30 MW Simens Turbine.- Ensure work completion of erection and commissioning as per Protocols and Time limits

    • India
    • Textile Manufacturing
    • 700 & Above Employee
    • Engineer ( B.O.E., Energy Auditor, NDT level-2 )
      • Mar 2017 - Jul 2020

      - Work as Boiler Operation Engineer ( Boiler Proficiency ) & Energy Auditor for energy efficient operation of plant.- Operation of Boiler, Turbine, Turbo compressor, and Auxiliaries.- Participating in new Boiler & Turbo Compressor Erection work.- Energy Efficient operation of Boiler, Turbine and Auxiliaries.- Preventive action, check list, Ensuring smooth running of plant and various equipment's. Smooth and timely supply of material and necessary post commissioning Services.- Handling emergency situation of plant.- Proactively coordinate with laboratory to know the boiler water, cooling tower, quality by use of chemical dosing and blow down.- Excellent relationship management and negotiation skills with the ability to take responsibility of working team.- Responsible for power plant operation for generation and supply of power as per standard operating parameters and with full compliance of safety and environment standards.- Setting up and managing entire plant operation with a view to achieve Business objectives and ensure top line and bottom line profitability.

    • United States
    • Building Construction
    • 1 - 100 Employee
    • Executive Mechanical Engineer ( B.O.E. - Boier Proficiency )
      • Nov 2015 - Mar 2017

      - Erection , Commissioning and Operation of thermal power plant having 4 Boilers and 3 Turbines and Auxiliaries. - 4*500 TPH IR-CFBC Boiler, 3*90.3 MW BHEL Turbine.- Ensure work completion of erection and commissioning as per Protocols and Time limits

    • Norway
    • Fire Protection
    • 1 - 100 Employee
    • Operation & Maintenance Engineer
      • Jul 2014 - Oct 2015

      Operation and Mainetanace of Plant at Porbandar, IndiaPlant :- Saurashtra Cement Ltd.Type :- Circulating Fluidised Bed Combustion Boiler (CFBC)Boiler :- 110 TPH (Thermax)Turbine :- 25 MW (Shin Nippon- SNM)Condensor :- Surface CondensorOperation and Maintenance EngineerStarted Work Career with Reputed Power industries Thermax limited as a O&M Engineer.Project commissioning during the Deputation of Thermax LTD.1). Company : Roqutte Riddhi Sidhi Ltd.Role : Desk EngineerDuration : 3 monthsCommissioning and stable operation of Boiler and Back Pressure Turbine as Desk Engineer on deputation of Thermax O&M plant.2). Company : North Eastern Power Corporation Ltd. Role : Desk EngineerDuration: 3 monthsCommissioning and Stable Operation of 4 WHRB Boilers and 2 Turbines as a desk engineer on deputation of Thermax client.

Education

  • Government Engineering College, Patan
    Bachelor of Engineering (B.E.), Mechanical Engineering
    2009 - 2013
  • Government of Gujarat
    Boiler Operation Engineer ( B.O.E. - Boiler Proficiency ), Boiler
    2016 - 2016
  • Bureau of Energy Efficiency
    Energy Manager ( B.E.E. ), Energy Management
    2018 - 2018
  • Bureau of Energy efficiency
    Energy Auditor, Energy Management and Auditing
    2018 - 2019

Community

You need to have a working account to view this content. Click here to join now