Asif jan

Project Lead at RMZ International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saudi Arabia, SA
Languages
  • English -
  • Urdu Full professional proficiency
  • Arabic Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Saudi Arabia
    • Telecommunications
    • 1 - 100 Employee
    • Project Lead
      • Feb 2019 - Present

      Management of a recent achieved project of IBS and Aspirations Management of a recent achieved project of IBS and Aspirations

    • Saudi Arabia
    • Telecommunications
    • 700 & Above Employee
    • NFM Engineer
      • Feb 2019 - Feb 2019

      Through Mobiserve Holding Telecom Through Mobiserve Holding Telecom

    • United Arab Emirates
    • Telecommunications
    • 700 & Above Employee
    • NFM Engineer
      • Feb 2019 - Feb 2019

      Holding Cluster of 120 Cellular Stc Gsm Full Configuration Network Onair Sites As Managed Services Opreation's & Maintenance By 24/7 with a Managed cycle. Holding Cluster of 120 Cellular Stc Gsm Full Configuration Network Onair Sites As Managed Services Opreation's & Maintenance By 24/7 with a Managed cycle.

    • Telecommunications
    • 200 - 300 Employee
    • Telecom Alcatel MW Coordinator
      • Dec 2018 - Feb 2019

      Got new Job with other employer

    • L800 Coordinator
      • Jul 2018 - Dec 2018

      • Now As a Coordinator Griped for L800+Penta Scope in EAST Region Dammam Al-Hafof Division Responsible For Total Batco L800 Scope Insatallation,Commissioning,Integration,HO’S ,Teams utilization for Nokia Requirements As per daily Routine For Achievements of TargetsReff # Nokia Maged jalal 0566644703 maged.galal@nokiasaudi.com

    • GSM Telecom Engineer
      • Mar 2015 - Nov 2018

       March 2015 to Till Date With Batco 29th dec 2018 Working …• With Nokia for Mobily+STC Operators for MS+MNS +Implementation projects of BATCO Telecom As a Transmission Engineer For Alcatel MPR900, Ericsson Mini Link + huawei RTN 910 950+Nokia FM200+Flexi Packet+Dragan Wave For 1+1,1+0,2+0,4+0 Hot standby handled upto Cluster of 300 on air sites In North Tabuk Region+Hail+Madina by 7/24b O&M.• As A RAN FLM Eng for Nokia worked in Batco Projects Of O&M MNS in Hail,Al qasim,Madina Munawara,Makkah,Taif,Yanbu,Tabuk,Alwaj,Dubba,Troubleshooting ,PMR,MDT’s Software Up gradation Commissioning Integration Of Flexi Multiracial, Flexi WCDMA,TDD,FDD,900,U900,1800,L2100,L2600, L2300• From Nov 2017 to 11-12-2018 Working With Nokia Copex 2017 Swap Modernization Project Dammam Region (East).1st Start MW+RAN TSSR Making & acceptance in Nokia Office Khuber 3 Months For Batco Scope After that…• As Engineer Performed Swap, CutOver, Installation, Commissioning, Integration,PAT HO’s of New Nokia AirScale 5G Ready Flexi Solution SRAN+TDD+L800 Flexi Solution Via 2T2R,4T4R G900,U900,L800,L1800,L2100,L2600+Penta Band Antenna Installation ,Indoor Outdoor Bts Power Connection to Rectifier Or Dcdb• Now As a Coordinator Griped for L800+Penta Scope in EAST Region Dammam Al-Hafof Division Responsible For Total Batco L800 Scope Insatallation,Commissioning,Integration,HO’S ,Teams utilization for Nokia Requirements As per daily Routine For Achievements of TargetsReff # Nokia Maged jalal 0566644703 maged.galal@nokiasaudi.com .

    • Fixed Network Engineer
      • Apr 2013 - Mar 2015

       April 2013 to March 2015.S.T.S MSP O&M Project of Huawei VDSL Gpon FTTX ,FTTH ,FTTM,OLT MDU MA5616 .MA5612 operations,As a FTTX engineer through Sub-Con BATCO in South Region Najran ,Asseer region Ref: .( AHMAD HADDAD Batco 0506790455)

    • Telecommunications
    • 1 - 100 Employee
    • CoreNetwork + Gpon FTTX OLT Engineer
      • Nov 2011 - Apr 2013

       Nov 2011 to April 2013S.T.S MSP O&M Project of Huawei VDSL Gpon FTTX as a Corenetwork Engineer For ,FTTH ,FTTM,OLT MDU MA5616 .MA5612 installation integration Commissioning+ Huawei Msoftx3000, Softx3000, Umg8900, Xptu, Igwb. Maintenence Installation Troubleshooting, IP,IMPLS Aggregators EDGE,NE 40, OSP Operations .Fiber Splicing testing etc.In Delta Turkish Company (ATMC) in SOUTH Region Ref:.( FM Mr.Ayaz ali anwar South huawei Technologies Co., Ltd Mobile: 0096655532989 (Got best performance award from STC huawei In the Emergency plan of restoration effected Services by Natural disaster Fire incident Take place in South Khamis Exchange in June 2016)

    • Saudi Arabia
    • Banking
    • 500 - 600 Employee
    • Fixed Network Engineer
      • Sep 2010 - Nov 2011

       SEP 2010 to Nov 2011.Worked in STC Data Field Operations ,Special Ckt’s As ,Fiber, WiMax ,DSL CPE,SHDSL,ADSL,ADSL2, NGN,MSAN’s As Fixed network Engineer in stc Project in ABANA Enterprises Group (All Jeddah STC Exchanges). Ref:(PM- ABANA Groups Abu ahmad alhadi_0555181459)  SEP 2010 to Nov 2011.Worked in STC Data Field Operations ,Special Ckt’s As ,Fiber, WiMax ,DSL CPE,SHDSL,ADSL,ADSL2, NGN,MSAN’s As Fixed network Engineer in stc Project in ABANA Enterprises Group (All Jeddah STC Exchanges). Ref:(PM- ABANA Groups Abu ahmad alhadi_0555181459)

Community

You need to have a working account to view this content. Click here to join now