Ashutosh Shukla

Project Controls Manager at Altrad Services APAC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Calgary, Alberta, Canada, CA
Languages
  • Hindi -
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Rebecca Chapman

Ashutosh is incredibly dedicated to the quality of his work. In the first 6months of working with Ashutosh. He was able to make major improvements to the reporting process. Adding a vast amount of value to us, the client. Sometimes this included tight timelines and very particular requests. Ashutosh was a pleasure to deal with along each milestone. He is certainly a very valuable team member on the contract. Thanks for all your hard work!

Sandeep S.

I worked with Ashutosh for about a year during my time at Petron Engineering, and have found him to be a hard working and professional individual. He is very systematic and meticulous in his work. I am sure he will make a great addition wherever he goes.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Excel: Creating a Basic Dashboard
    LinkedIn
    Mar, 2022
    - Oct, 2024

Experience

    • Australia
    • Oil and Gas
    • 100 - 200 Employee
    • Project Controls Manager
      • Oct 2022 - Present

    • Project Controls / Planning Engineer
      • Nov 2018 - Oct 2022

    • Work Management Planner
      • Jul 2018 - Oct 2018

    • Project Controls / Planning Engineer
      • Sep 2016 - Jun 2018

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Lead Planning / Project Controls Engineer
      • Feb 2013 - Aug 2016

    • India
    • Mechanical Or Industrial Engineering
    • 500 - 600 Employee
    • Executive Engineer - Projects
      • Feb 2012 - Jan 2013

      • Responsible for all Estimation / QS related activities of the Projects. • Preparation of Bid documents, evaluation, obtaining Management approvals, Award and Management of these Projects till close out. • Preparation & Tracking of the project master schedule and summary level curves and Manpower histogram. • Identification, monitoring and streamlining of critical paths running through the Project Master Schedule and individual contracts. • Weekly/Monthly reports generation including ‘S’-Curves for Client and Management review. • Job allocation to all Discipline Engineers and follow up for daily job progress. • Cost control by Optimization of Resource utilization. • Understanding project work scope, needs and deliverables, contract milestones, Estimating budget quantities, costs, durations and resources. • Aligning Project work scope with company structured WBS (Work Breakdown Structure). • Coordinating with Vendors in line to Material Management. • Project operating with SAP system. • Going through technical specifications, standards and instructions given by client, Contract requirements. • Resource Planning, Resource Loading and resource scheduling. • Project Costing, Preparing and updating milestone schedule for the total project and/or major portions of the Project for top management. • Management reports i.e. Overall Project Progress, Productivity analysis, Resource utilization, Material Consumption and reporting activities (weekly/monthly) in line with the project and corporate Procedures. • Monthly forecasting and shortfall analysis for the Project. • Critical activity analysis and highlight to management potential delays and assess the impact to the project. • Assigned to find the project delayed status and responsible for fixing the breakdowns. • Coordinate with the HSEQ personnel to oversee the implementation of risk and safety assessments.

    • Germany
    • Construction
    • 700 & Above Employee
    • Project Controls / Planning Engineer
      • Aug 2008 - Jul 2011

      • Monitor, evaluate and control during execution of work and recommend preventive/corrective measure if necessary. • Going through technical specifications, Contract requirements. • Preparation of S-Curve and Look ahead schedule. • Performance analysis (Earned Value Analysis), Monitoring, Coordinating and Reporting MIS. • Resource Planning, Resource Loading and resource scheduling. • Project Costing, Preparing and updating milestone schedule for the total project and/or major portions of the Project for top management. • Management reports i.e. Overall Project Progress, Productivity analysis, Resource utilization, Material Consumption and reporting activities (weekly/monthly) in line with the project and corporate Procedures. • Monthly forecasting and shortfall analysis for the Project. • Critical activity analysis and highlight to management potential delays and assess the impact to the project. • Preparation of claim document on the basis of delay analysis. • Evaluating and selecting the available course of action for achieving the desired objectives under the Resource constraints. • Reconciliation of the Project Materials (Comparison of Budgeted Vs Actual quantity). • Collection of weekly safety statistics and review of the same. • Collection of weekly Quality statistics (No of inspection / NCR etc.) and review of the same. • Pre-planning the audit in accordance with the scope and complexity of the area. • Managing the audit in relation to time and resource budgets. • Ensuring that audit findings and recommendations made during the course of the audit are promptly communicated to management by preparation of audit report and follow-up.

    • India
    • Public Safety
    • 400 - 500 Employee
    • Planning Engineer
      • Aug 2006 - Jul 2008

      • Conduct preshift activities like checking machine condition, going through the logbook, and monitoring conduct of autonomous operations IN ORDER TO ensure necessary preparation is done and the shift starts on time. • Conduct loss analysis, tool life control, management loss control and scrap control IN ORDER TO minimize losses. • Conduct all shift closure activities including updating the log-book IN ORDER TO ensure smooth handover to the next shift. • Responsible for preparing Product Development Plan. • Execution of Project including designing, purchasing, inspecting and installing of equipment. • Execution of Project in budgeted cost and time including planning of documentation and purchase of accessory equipment, making technical submittals, obtaining approvals, delivery etc. • Understanding customer’s needs and Facilitating R&D to convert customer’s requirements to Engineering specifications. • Responsible for preparing material requisition, datasheets, Technical bid evaluation for product.

Education

  • SITM, UPTU
    Bachelor of Technology (B.Tech.), Mechanical Engineering
    2002 - 2006

Community

You need to have a working account to view this content. Click here to join now