Ashraf Khan, E.I.T, C.M.I.T.

Project Manager at ALSAL Construction, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US
Languages
  • English Native or bilingual proficiency
  • Hindi Native or bilingual proficiency
  • Urdu -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Fahad Najeeb

Mr. Ashraf Khan was very helpful and supportive during the entire construction process. He was quite honest and worked in the favor of the home buyer. I completely trusted him. I was provided with weekly telephone contact and photos with all the updates on my home. He made the building experience very positive and exciting because I was able to build a new home with my choice of design, finishes and colors. He went above and beyond to make my home building project go as smoothly as possible. I highly recommend him without any reservations. Fahad Najeeb 1301 Veloce Drive, Plano TX

Zulfiqar Ishaq

Khan was site manager on two of our houses being built in Plano, TX. I found him very hardworking, professional and passionate individual, willing to go an extra mile to achieve customer satisfaction. He has successfully demonstrated his capabilities to simultaneously work across multiple projects and keeping up with detailed notes/follow ups. He takes pride in the work being done and open to accept suggestive feedback where needed. He has all the necessary skill-sets, education and attitude to grow in this profession. I feel no hesitation in strongly recommending him for similar projects in future.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • CMIT- Construction manager in training
    Construction Management Association of America (CMAA)
    Sep, 2015
    - Oct, 2024
  • OSHA 30 Hour Construction Industry OutreachTraining Program
    U.S. Department of Labor
    Sep, 2015
    - Oct, 2024
  • Engineer-in-Training
    Texas Board of Professional Engineers
    Aug, 2015
    - Oct, 2024

Experience

    • United States
    • 1 - 100 Employee
    • Project Manager
      • May 2020 - Present

      • Completed Retail Center at 12,000sft AC built up area with budget of $4.5M, from April 2022 to Sept 2022• Completed multiple Custom homes ranging from 5000sft to 20000sft with budgets ranging from $800k to $5M, from May 2021 to April 2022• Complete development of Islamic center of Colin county cemetery 33 Acre land with budget of $5M, from May 2020 to June 2021• Complete development of Goddard School 2.2 Acre land, 13,000sft AC built-up area with budget of $5.5M, from May 2019 to April 2020• Complete development of Genstar Montessori Academy 1.5 Acre land, 12,000sft AC built-up area with budget of $4M, from Mar 2018 to May 2019 Was involved in all the above projects from start to completion as a single point of contact to employer Lead projects by creating detailed scope of works, cost estimating and scheduling. Focused on buyouts of all trades before start of project. Effectively communicate with A/E & owners for submittal approvals & RFIs. Lead on evaluating field problems, arrange project meetings with all subs on site, coordinate timely review and resolution of on-site issues Inspect project sites to monitor progress and ensure conformance to engineering design specification and safety or sanitation standards Performed preconstruction meeting effectively with cities official involving fire marshal, civil engineering dept, water dept, building inspectors to go over respective cities requirements Managed multiple clients during the progress of project until its completion, with the fullest customer satisfaction, which encourage client to bring future projects to organization  Assist craftsmen, foremen by creating punch lists of each construction activities at completion time, to ensure we address our quality standards, design requirements and clients expectations

    • Project Superintendent
      • May 2019 - May 2020

      The Goddard School.

    • Project Superintendent / Manger
      • May 2018 - May 2019

      Genstar Montessori Academy

    • United States
    • 1 - 100 Employee
    • Project Engineer
      • Mar 2018 - May 2018
    • United States
    • Construction
    • 1 - 100 Employee
    • Project Control Scheduler / Construction Manager
      • Aug 2016 - Feb 2018

      • Managed Completion of more than 7 residential custom homes at any given time, plus warranty jobs valued in excess of $10 million annually • Utilize BuilderTrend scheduling software to develop baseline schedules and manage progress throughout project lifecycle • Maintains and updates the master program schedule using Builder Trend • Develops and maintains base line schedules for individual projects using Builder Trend • After scheduling for project is completed I share with project managers and the program manager as to whether those schedules are logical, complete, and satisfies contract requirements • Overall control on jobsite, track construction schedule through Builder trend, good communication with city inspectors and subs to achieve completion of project within time frame • Communicated deliverable deadlines and responsibilities to team members and managers • Effectively coordinate with the clients, Sub contractors, Vendors and bidders • Tracking material shipments and matching it with client selection report before installation • Update daily logs, projects photographs, weekly updates to clients, tracking calendar, follow up on RFI’s and emails on Builder Trend • Ensured that job-sites were both clean and safe throughout the process • Performed periodic site inspections of projects by uploading photograph on daily logs and document as-built conditions, weekly updates to clients through Builder Trend • Worked effectively within a team environment & self-manage time to ensure deadlines are met

    • United States
    • Construction
    • 1 - 100 Employee
    • Superintendent
      • May 2016 - Aug 2016

      • Assist Project Manager for bid preparation, estimating material, coordinating with the suppliers, for the Holiday Inn, Candlewood project for first one month• Worked as superintendent for rest of the months and build 120 LF Retaining wall, and supervised both job till foundation • Performed quantity takeoffs using electronic onscreen takeoff programs or by hand as required

    • Assistant Superintendent
      • Dec 2015 - May 2016

      Assistant Superintendent – Holiday Inn, Beaumont, Tx ($10 Million)• Responsible for ensuring that subcontractor is executing according to scope of work and ensure to correct all deficiencies on jobsite by subcontractor• Communicate with project team for ASI’s, RFI’s and Material Submittals• Prepare Daily reports, Weekly progress reports, technical reports, and submit it to the project team.• Responsible for awarding contract to subcontractor and payments• Ensure the jobsite is always kept cleaned, organized manner and follows safety standards• Responsible for quality control duties and proper work being executed

    • United States
    • Civil Engineering
    • Construction Inspector - Intern
      • Oct 2015 - Dec 2015

      • Performed inspections for Structural steel reinforcement to ensure its per approved drawings • Performed Drilling of Piers inspections as per Geo-technical report requirement • Executed construction site inspections to monitor construction progress and ensured conformance to the plans and specifications • Performed inspections for Structural steel reinforcement to ensure its per approved drawings • Performed Drilling of Piers inspections as per Geo-technical report requirement • Executed construction site inspections to monitor construction progress and ensured conformance to the plans and specifications

    • Senegal
    • Accounting
    • 1 - 100 Employee
    • Construction Field Engineer
      • Sep 2013 - Jun 2014

      •Maintained contract drawings and updated construction site issues to the project manager •Responsible for tracking and monitoring changes in work schedule and perform verification of compliance •Reviewed shop drawings, materials and sample submittal for conformance with structural specifications •Coordinated between design team and site engineer to resolve problems with drawings and day to day site work •Perform responsibilities of preparing and maintaining records of high level, detail level requirements and quality issues

    • United States
    • 1 - 100 Employee
    • Site Engineer
      • Dec 2012 - Jan 2013

      •Managed and Supervised material resources on sites •Ensured implementation of designs and plans on site •Assisted managers in design and site related works •Managed and Supervised material resources on sites •Ensured implementation of designs and plans on site •Assisted managers in design and site related works

Education

  • The University of Texas at Arlington
    Master of Civil Engineering, Construction Engineering and Management
    2014 - 2015
  • Osmania University
    Bachelor of Engineering (B.E.), Civil Engineering
    2009 - 2013

Community

You need to have a working account to view this content. Click here to join now