Ashraf Badawi
Site Manager / Plumbing at Reliance Electro Mechanical Plumbing Contracting Co., LLC (REMCO)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Experience
-
Reliance Electro Mechanical Plumbing Contracting Co., LLC (REMCO)
-
United Arab Emirates
-
Construction
-
100 - 200 Employee
-
Site Manager / Plumbing
-
Oct 2018 - Present
-
-
-
Drake and Scull Engineering
-
Amman, Jordan
-
Mechanical Site Engineer
-
Feb 2015 - Jun 2018
1) HVAC System: a) Supervise the installation of Ducts and to ensure that all installations are done as per approved shop drawings. b) Supervise the installation of Fan coil Units. c) Conduct light Test Inspection for all ducts and submit to the Engineer (Consultant). d) Supervise the installation of Chillers: including pumps installation. e) Supervise the installation of AHUs & FAHUs: including ducts, sound attenuators. f) Pressure Test for chilled water network. 2) Water Supply System: a) Supervise the installation of water pipes (PPR) with fittings for all area including insulation. b) Pressure test for water pipes network. c) Supervise the installation of First Fix Embedment in wet areas. 3) Fire Fighting System: a) Supervise the installation of firefighting network pipes and fittings. b) Supervise the installation of Fire Fighting's Pumps Room. c) Pressure test for firefighting system. 4) Drainage System: a) Supervise the installation of drainage pipes b) Supervise the installation of First Fix Embedment inside wet areas. c) Pressure test for drainage pipes, Gravity Test for Bath Tub Mixers & Under Tile Network. 5) LPG System: a) Supervise the installation of both Copper Pipes for Residential Apartments & Seamless Pipes for Main Kitchens. b) Pressure test for LPG Pipes. 6) Issuing various letters such as: Prevailing Site Condition, Request for Information (RFI), Inspection Requests… etc. 7) Installation of energy meters & water meters (BMS). 8) Study all shop drawings, project documents and any revisions thereon. 9) Execute the works according to the latest approved revision of shop drawings and /or instruction of Line manager or project manager. 10) Prepare Red Marked drawings for final AS Built Drawings. 11) Prepare Reflected Ceiling Layout Drawings (RCP) for mechanical. 12) Prepare Daily Reports for Man Power Allocations with duties and percentage of work done. 13) Prepare weekly progress reports for mechanical works.
-
-
-
Triumpharma
-
Pharmaceutical Manufacturing
-
1 - 100 Employee
-
Senior Clinical Coordinator
-
Sep 2012 - Jan 2015
-
-
-
-
Site Engineer
-
Mar 2010 - Sep 2012
- Responsible for Installing, Testing & Commissioning of Digital Meters (Water, Electricity, Gas and BTU meters).- Responsible for connecting all meters with the main server via fiber optic loops and through the hubs and switches (Automated Meter Reading).- Responsible for the daily monitoring of all meters readings and solve any problem occurred. - Perform Daily inspections for the mechanical and electrical metering system.- Prepare and issue reports related to the previous inspections.- Follow – up with assigned persons to achieve the goals of the reports. - Preparing manuals to help technicians in their installation work: manual for mechanical meters installation and connecting the meters to the servers.- Conduct training sessions for Automated Meter Reading for KAHRAMAA and UDC contractors
-
-
Mechanical Sales Engineer
-
Mar 2008 - Mar 2010
- Work as a sales engineer for Digital Metering System.- Responsible for marketing of Grooved End Coupling for Fire Fighting Systems.- Responsible for marketing Pipe Hangers and Pipe Support system for firefighting systems.
-
-
Site Engineer
-
Mar 2006 - Mar 2008
- Working as Site Engineer for the building of a new Sewage Treatment Plant at Doha, Qatar.- Installation, pre commissioning, commissioning and handing over of electrical/mechanical works with quality in according to project specification within the designated time frame - Study all shop drawings, project documents and any revisions thereon- Execute the works according to the latest approved revision of shop drawings and /or instruction of Line manager or project manager- Prepare materials take off from shop drawings - Prepare red marked drawings for final AS Built Drawings
-
-
-
In
-
Amman - Jordan
-
Clinical Supervisor
-
Feb 2003 - Feb 2006
-
-
Education
-
Jami'at Mu'tah
Bachelor's degree, Engineering Bsc