Ashley Webster TMIET
Electrical Design Engineer at BARHALE TRANT UTILITIES LLP- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
BARHALE TRANT UTILITIES LLP
-
United Kingdom
-
1 - 100 Employee
-
Electrical Design Engineer
-
Jul 2020 - Present
-
-
-
Sweco
-
Sweden
-
Professional Services
-
700 & Above Employee
-
Senior Electrical Engineer
-
Nov 2018 - Jul 2020
-
-
-
Arcadis
-
United States
-
Architecture and Planning
-
1 - 100 Employee
-
Senior Electrical & ICA Engineer
-
Sep 2016 - Sep 2018
* Develop high level statement of needs into initial designs* Produce & review Specifications for HV & LV Power Systems, Protection Schemes, Control Systems, Earthing Design and Lightning Protection for new Advanced Anaerobic Digestion (AAD) plant and associated satellite sites* Production of P&ID’s, Block Cable Diagram, Single Line Diagram, Instrument Schedules and Cable Schedules to augment specifications into tender pack.* Review of received tenders for technical compliance – request clarifications and review same when received* Review of main plant packages for electrical compliance with WIMES & BS standards* Liaise with local DNO to upgrade power supplies to site & embed 3.5MW of generated power* Supervise team members located in Cardiff (home office), East Kilbride, London, Birmingham and India to assist in above* Liaise with construction partners
-
-
-
Trant Engineering Ltd
-
United Kingdom
-
Civil Engineering
-
200 - 300 Employee
-
EICA Design Engineer
-
Dec 2014 - Sep 2016
Scope of work report (data gatherer)Design of electrical, instrumentation and process control schemes to enable effective site and asset performance monitoring.Production of P&ID’s, Block Cable Diagram, Single Line Diagram, Loop Diagrams, Instrument Schedules and Cable Schedules to communicate design into a construction pack.Use information from Instrument Schedule to obtain quotations from framework suppliers for required instrumentation and fixing accessories. Place orders for delivery to site in line with construction schedule.
-
-
-
-
Project Engineer
-
Feb 2014 - Dec 2014
Design of electrical, instrumentation and process control schemes for construction projects within clean water treatment plants.Production of P&ID’s, Block Cable Diagram, Instrument Schedules, Control Philosophies, Circuit Schematics and BOM to communicate design into a construction pack.Production of RAMS (Risk Assessment Method Statements) for construction activities and Project Management Plans ahead of site establishment.Inspect, approve and sign off sub-contractors electrical & instrumentation installations. Attend MCC panel Factory Acceptance Tests.
-
-
-
Grontmij
-
Netherlands
-
Senior Electrical & ICA Engineer
-
Nov 2012 - Feb 2014
Feasibility studies, outline and detailed design of clean and dirty water projects.Design of instrumentation, control and power systems to deadlines and within budget.Production of Single Line Diagrams, P&ID’s, Load Schedules, Instrument Schedules, Control Philosophies, installation and system integration documents to communicate required designs to Contractors.Several new ideas introduced in design phase and now official policy for client, other designs highlighted as best practice.Attend Factory Acceptance Tests (FAT) of MCC panels when required to ensure compliance with quality and performance requirementsElectrical project engineering work to ensure smooth co-ordination of on site activities between suppliers and installation contractors
-
-
-
Jacobs
-
Netherlands
-
Retail Office Equipment
-
1 - 100 Employee
-
Electrical Design Engineer
-
Sep 2011 - Nov 2012
Design of electrical, instrumentation and process control schemes for tendering and construction projects within the clean & dirty water industries.Production of P&ID’s, Block Cable Diagram, Instrument Schedules, Control Philosophies, Circuit Schematics, GA’s and BOM to communicate design into a construction pack.Running satellite design office Suggesting & implementing procedural change where existing practices would impede efficient operation.
-
-
-
MWH Global
-
Zimbabwe
-
Advertising Services
-
1 - 100 Employee
-
Electrical Engineer
-
Apr 2010 - Sep 2011
-
-
-
Severn Trent Water
-
Utilities
-
Electrical Engineer
-
Jun 2001 - Apr 2010
Feasibility studies, outline and detailed design of clean and dirty water projects.Design of instrumentation, control and power systems to deadlines and within budget.Production of Single Line Diagrams, P&ID’s, Load Schedules, Instrument Schedules, Control Philosophies, installation and system integration documents to communicate required designs to Contractors.Attend Factory Acceptance Tests (FAT) of MCC panels when required to ensure compliance with quality and performance requirements.
-
-
Education
-
East Warwickshire College of FE
HNC, Electrical and Electronics Engineering