Ashley Leroux
President at XL Engineering Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Arnold Grohn
Ashley is detail oriented and a strategic manager with tons of vision.
Arnold Grohn
Ashley is detail oriented and a strategic manager with tons of vision.
Arnold Grohn
Ashley is detail oriented and a strategic manager with tons of vision.
Arnold Grohn
Ashley is detail oriented and a strategic manager with tons of vision.
Experience
-
XL Engineering Ltd.
-
Canada
-
Oil and Gas
-
1 - 100 Employee
-
President
-
Jan 2013 - Present
Professional consulting services for Operations, Engineering, Project Management, Earthworks, and Construction. Supporting various clients in western Canada with field services and office consulting. Managed the AER regulatory application for a 10,000 bbls/d SAGD project in northeastern Alberta. Process design basis review, facilities scoping, and project management support up until AER submission. Developed client specific project management documents using existing templates and creating new content. Coordinated field survey and field reports for various surface mineral lease developments and applications. Influenced engineering teams with new design concepts and technology as a project advisor on various thermal projects for various clients. Prepared various project metrics summaries to show key improvement opportunities. Itemized and prioritized opportunities list showing potential savings in excess of $50MM annually for a 100,000 bbls/d project. Supported the AER regulatory amendment and overall project for a 10,000 bbls/d project phase to include the relocation of an existing and mothballed central processing facility (CPF). Developed execution plans and concepts to implement for logistics and refurbishment.
-
-
-
Tundra Process Solutions
-
Canada
-
Oil and Gas
-
100 - 200 Employee
-
Vice President
-
Dec 2016 - Dec 2018
Managed and mentored a multi-disciplinary project and engineering team of 10 staff and 30 contractors for all engineered and packaged solutions. Delivered over 15 process packages, measurement skids, pump buildings and buildings on-time and on-budget. Captured lessons learned and coordinated the continuous improvement of all project processes. Lead a strategic development initiative that refocused the corporate brand, focusing on core business strengths and geographic expansion areas. Managed and mentored a multi-disciplinary project and engineering team of 10 staff and 30 contractors for all engineered and packaged solutions. Delivered over 15 process packages, measurement skids, pump buildings and buildings on-time and on-budget. Captured lessons learned and coordinated the continuous improvement of all project processes. Lead a strategic development initiative that refocused the corporate brand, focusing on core business strengths and geographic expansion areas.
-
-
-
Integrated Thermal Solutions Ltd.
-
Canada
-
Oil and Gas
-
President & CEO
-
Sep 2014 - Dec 2018
Developed patented wellpad technologies ready for commercial deployment. Integrated Thermal Solutions (iTS) has licensable technologies such as the Wellpad Manufactured Solution (WPMS), Single Parallel Row (SPR), and Dual Parallel Row (DPR). The iTS vision is to change how business is done, allowing resource rich regions to flourish and be profitable in any market condition. Developed patented wellpad technologies ready for commercial deployment. Integrated Thermal Solutions (iTS) has licensable technologies such as the Wellpad Manufactured Solution (WPMS), Single Parallel Row (SPR), and Dual Parallel Row (DPR). The iTS vision is to change how business is done, allowing resource rich regions to flourish and be profitable in any market condition.
-
-
-
Cenovus Energy
-
Canada
-
Oil and Gas
-
700 & Above Employee
-
Manager, New Resource Plays
-
2011 - 2013
Managed and mentored a multi-disciplinary engineering, operations, and construction team of fifty staff and 250 contractors for all emerging Cenovus Oil Sands areas. Advanced the SAGD commercial developments of Telephone Lake (90,000 bbls/d), Pelican Lake Grand Rapids (180,000 bbls/d), and Kirby West (80,000 bbls/d) by coordinating the regulatory application, FEED, and detailed engineering phases of the projects. Additionally, accountable for 7 EOR Pilot Projects with the potential to unlock in excess of 3MMM bbls of reserves. Designed, constructed and operated 5 Pilots including dewatering, AIDROH, LP SAGD, LP CSS, and Steam/Air Injection while integrating these activities with annual Oil Sands Exploration (OSE) programs or existing commercial operations. Stewarted all activities within annual budgetary constraints of $175 - $200MM.
-
-
Group Lead, Operations Engineering
-
2008 - 2011
Headed up the onsite and Calgary-based multi-disciplinary engineering team of 100 staff and 400 contractors for the Foster Creek and Christina Lake commercial developments. Engineering, commissioning and startup for Phases D&E at Foster Creek and Phase C at Christina Lake adding 100,000 bbls of production capacity. Implemented and influenced operational culture change to include area work team concept increasing team collaboration and ultimately production onstream by 2% or $50MM annually. Hired and onboarded more than 50 professional staff spearheading the creation of corporate onboarding, development, new grad, and training programs.
-
-
Project Manager, SAGD Sustaining & Expansions
-
2005 - 2008
Directly managed and coordinated the installation of over 150 SAGD wellpairs including the associated regulatory, above ground thermal pipelines, powerlines, communications, and other supporting infrastructure. Developed the complete wellpad and pipeline design basis for both Foster Creek and Christina Lake developments. Managed and mentored a high performing SAGD Project Team of ten staff and 150 contractors for both Foster Creek and Christina Lake commercial developments. Completed 15 full-cycle SAGD Offsite expansion and sustaining projects ahead of schedule and under budget. This included wellpads, disposal, source water, salt caverns, sand cells, pipelines, etc. Stewarded all activities within annual budgetary constraints of $225 - $250MM.
-
-
Facilities Engineer, Foster Creek Site
-
2002 - 2005
Completed the industry's first gas-lift SAGD wellpair conversion to ESP, including operational performance testing. Designed and integrated the salt cavern systems into existing operations at Foster Creek. Improved day to day plant and well performance by executing over 250 MOC projects during the commissioning and startup of Phases A-C (60,000 bbls/d capacity) at Foster Creek SAGD Commercial and Pilot. Confirmed design basis for future SAGD expansions by completing equipment, chemical, and operational trials while generating technical reports with comprehensive results/recommendations. Reduced Opex costs by $8MM annually, stewarded all onsite project activities within annual budgetary constraints of $10 - $12MM, and saved future phase expansion projects $25MM per phase with process improvements.
-
-
-
Catalyst Paper
-
Canada
-
Paper and Forest Product Manufacturing
-
500 - 600 Employee
-
Process Engineer, Paper Machines
-
2001 - 2002
Supported day to day operations team at Port Alberni Papermill. Member of team that transformed the papermill to neutral papermaking and completed over 10 chemical and process trials. Lowered annual Opex costs by $1MM with implemented improvements. Supported day to day operations team at Port Alberni Papermill. Member of team that transformed the papermill to neutral papermaking and completed over 10 chemical and process trials. Lowered annual Opex costs by $1MM with implemented improvements.
-
-
-
Cenovus Energy
-
Canada
-
Oil and Gas
-
700 & Above Employee
-
SAGD Operator, Pilot Plant
-
1999 - 2001
Commissioning, startup, operations, and field testing for the initial SAGD wellpairs at Foster Creek. Vacation and summer relief operator at the Foster Creek SAGD Pilot Plant. Solved oil treating foaming issue and increased heat exchanger runtimes by 100% between cleanings. Acquired the required steam plant firing time for 4th class power engineering certification. Commissioning, startup, operations, and field testing for the initial SAGD wellpairs at Foster Creek. Vacation and summer relief operator at the Foster Creek SAGD Pilot Plant. Solved oil treating foaming issue and increased heat exchanger runtimes by 100% between cleanings. Acquired the required steam plant firing time for 4th class power engineering certification.
-
-
Education
-
University of Alberta
Bachelor of Science (BSc), Chemical Engineering -
Southern Alberta Institute of Technology / SAIT
4th Class Power Engineering -
University of Alberta
Bachelor of Science (BSc), Chemistry and Mathematical Sciences