Ashley Cook

Mechanical Engineer at Minnovo Pty Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Perth Area, AU
Languages
  • English Native or bilingual proficiency
  • French Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Workplace First Aid
    St John Ambulance (WA)
    Jun, 2013
    - Nov, 2024

Experience

    • Australia
    • Mining
    • 1 - 100 Employee
    • Mechanical Engineer
      • Jan 2017 - Present

    • Australia
    • Mining
    • 100 - 200 Employee
    • Mechanical Engineer
      • Sep 2016 - Jan 2017

    • Junior Maintenance and Reliability Engineer
      • Jul 2016 - Sep 2016

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Mechanical Engineer
      • Dec 2014 - Apr 2016

      Roy Hill – Detailed Design• Redesign of conveyor skirting and dust suppression system after fabrication issues during commissioning, salvaging the already fabricated materials preventing rework.• Co-authored the preliminary maintenance and lifting study report, identifying major maintenance and constructability issues.Mulga Rock Uranium - Basic Engineering Design• Lead mechanical engineer assigned to the project.• Weekly client meetings to discuss client needs, generating excellent client rapport, gaining sole-source recommendation for future study phases.• Developed all technical and equipment specifications for major equipment and fabricated items, incorporating them into design.• Tendered and evaluated the suitability of quoted packages (and where necessary, modify requirements or design to suit the available equipment).• Responsible for budget-accurate equipment sizing and pricing, oversight of junior mechanical designer and mechanical layouts.Krumovgrad Gold - Detailed Design• Acting lead mechanical engineer for 2 months during detailed design.• Continued involvement from pre-feasibiliy (2012) through to detailed design (2015)• Revised project documentation from previous phases in line with new duties for tender to market, and evaluated responses.• Created a 'Permitting Package' for the fulfillment of Bulgarian local and federal government health, safety and environmental sustainability permitting requirements, in coordination with multiple international subcontractors.• Managed the waste water discharge system design, including interfacing with international contractors for tailings dam designs and Bulgarian authorities for permitting approval, while managing community requirements for the system.• Assisted in implementing a new, unproven flotation cell design required by the client for the project.Copler Gold Expansion - Detailed Design• Assisted in the creation of project piping and valve specifications, suitable for use in POX processes.

    • Graduate Mechanical Engineer
      • Sep 2011 - Dec 2014

      Roy Hill• Published a preliminary lifting study for inclusion into site commissioning and maintenance procedures, and constructability reports.• Facilitated HAZOP meetings between clients and various contractors and sub-contractors.Christmas Creek Tripper Remediation• Co-authored a technical report identifying major flaws with both design and maintenance of a conveyor tripper following a site fatality. Major outcomes included structural and control system analysis with remedial recommendations to resolve current issues and prevent future incidents.Windimurra – Vanadium• Part of a small team allocated to remediate recurring production issues, through the replacement of a comminution circuit, within a 9-month shutdown schedule.Hillside Copper• Supervised a team of experienced engineers handling distribution of work to produce required project documentation (specifications, datasheets, scopes of work and tender evaluations).• Initiated a series of novel cost-saving measures to assist in meeting revised budgetary targets, including the substitution of a ~$10M thickener package with a ~$2M settling pond reclamation system.

    • Mining
    • 1 - 100 Employee
    • Student Metallurgist/Process Engineer
      • Sep 2010 - Nov 2010

      Produced and internally published an honours thesis paper on the optimisation of the gold flotation circuit on-site. The work included: • Design of testwork methodology and process. • Manual collection and processing of samples including size fractionation, and hydro- and pyrometallurgical assay. • Results analysis, in the form of an internally published set of recommendations to reduce product tailings losses. • Job hazard/safety analysis and mitigation. Produced and internally published an honours thesis paper on the optimisation of the gold flotation circuit on-site. The work included: • Design of testwork methodology and process. • Manual collection and processing of samples including size fractionation, and hydro- and pyrometallurgical assay. • Results analysis, in the form of an internally published set of recommendations to reduce product tailings losses. • Job hazard/safety analysis and mitigation.

Education

  • The University of Western Australia
    Bachelor of Engineering (B.Eng.), Mechanical Engineering
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now