Ashish Ranjan
Chief Technical Officer at Infinity Power- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Infinity Power
-
Egypt
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Chief Technical Officer
-
Jul 2023 - Present
Dubai, United Arab Emirates
-
-
CTO Wind
-
Apr 2022 - Jun 2023
Dubai, United Arab Emirates
-
-
-
ACWA Power
-
Saudi Arabia
-
Utilities
-
700 & Above Employee
-
Director - Techno Commercial (Wind)
-
Jun 2021 - May 2022
Dubai, United Arab Emirates
-
-
Executive Manager - Techno Commercial (Wind)
-
Mar 2019 - Jun 2021
Dubai
-
-
-
Enel Green Power
-
Italy
-
Renewable Energy Semiconductor Manufacturing
-
700 & Above Employee
-
Senior Manager Project Engineering
-
Aug 2017 - Feb 2019
Bangalore
-
-
-
-
Head of Section - Project Engineering
-
Jun 2014 - Aug 2017
Bengaluru Area, India Technical due-diligence for majority of wind IPP portfolios in India including contract reviews, turbine appraisals, evacuation risk reviews, project construction risk profiling, inventory management reviews, IPP business strategy reviews. Responsibilities include sales, business development, strategic decisions, project management & technical advisory in Project Engineering function for renewables.
-
-
-
Vestas
-
Denmark
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Assistant Manager
-
Jun 2011 - May 2014
Chennai Area, India Electrical design & Engineering of 87 MW EPC wind project in Philippines in a Virtually managed environment formed the key responsibility. Ensuring the design deliverable for timely execution of the project (including but not limited to design methodology as per local & international standards, design reports on Power cable optimization, DG-set based Yaw Power system design, grid-connection requirements, FDS for SCADA) formed the key task. Working through pre-sales support in framing employers… Show more Electrical design & Engineering of 87 MW EPC wind project in Philippines in a Virtually managed environment formed the key responsibility. Ensuring the design deliverable for timely execution of the project (including but not limited to design methodology as per local & international standards, design reports on Power cable optimization, DG-set based Yaw Power system design, grid-connection requirements, FDS for SCADA) formed the key task. Working through pre-sales support in framing employers requirement on electrical items, finalizing the DoR in consultation with sub-contractor were other part of the job. I was also responsible for electrical Balance Of Plant (BOP) engineering & Technical Support for wind power projects in India. This involved working on total 350 MW project (51.8MW Firm) during pre-sales, preparing Division of Responsibility (DoR) & costing for engineering solutions along with the task of electrical BOP design solutions. State Utility connection requirements, Reactive Power guarantee, Technical consultancy on Transmission Line & Loss optimization, BOP Technical support during execution & service were other tasks performed.
-
-
Engineer
-
Jun 2008 - Jun 2011
Chennai Area, India - Electrical Balance of Plant design and engineering
-
-
Education
-
Vellore Institute of Technology
B.Tech, Electrical & Electronics