Asad Khan

Site Foreman, Project Manager at Isle of Mann Group of Companies
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Surrey, British Columbia, Canada, CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Real Estate
    • 1 - 100 Employee
    • Site Foreman, Project Manager
      • Mar 2014 - Present

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Engineer In Training
      • Jan 2013 - Mar 2014

      Substation design. Substation design.

    • Utilities
    • 700 & Above Employee
    • Intern - Protection & Control Technical Services
      • Jan 2011 - Dec 2011

      • Remotely retrieved event files from Digital Fault Recorders, and consolidated records for each fault. Independently performed preliminary fault analysis and assisted with developing the protection misoperation reports.• Continually updated the protection and control asset information database, to ensure that all the settings and configurations matched the as‐left settings.• Provided support to field and design engineers, and ran requested queries on the protection information system. • Remotely retrieved event files from Digital Fault Recorders, and consolidated records for each fault. Independently performed preliminary fault analysis and assisted with developing the protection misoperation reports.• Continually updated the protection and control asset information database, to ensure that all the settings and configurations matched the as‐left settings.• Provided support to field and design engineers, and ran requested queries on the protection information system.

    • Canada
    • Facilities Services
    • 1 - 100 Employee
    • Intern - Electrical Engineering
      • Jan 2010 - Sep 2010

      • Performed lighting and energy audits for all types of buildings including offices, educational institutes and industrial buildings.• Maintained an intensive lighting database in MS Access after each audit to perform energy consumption calculations.• Designed detailed Power and Lighting Layouts using AutoCAD, working within Canadian Standards Association guidelines to size conduits, wires and breakers.• Suggested energy efficient lighting retrofit options to induce greater savings with a reasonable simple payback.• Prepared tender packages completed the bidding process and coordinated site reviews with contractors.

    • Government Administration
    • 700 & Above Employee
    • Intern - IT Infrastructure
      • May 2008 - Dec 2008

      • Installed and ensured functionality of wireless communication systems.• Communicated with clients over the phone, via email, and in person to provide timely support and solutions to a diverse range of IT related problems.• Coordinated the installation of hardware and software for over 500 users around the province. • Installed and ensured functionality of wireless communication systems.• Communicated with clients over the phone, via email, and in person to provide timely support and solutions to a diverse range of IT related problems.• Coordinated the installation of hardware and software for over 500 users around the province.

Education

  • The University of British Columbia / UBC
    Electrical Engineering, Power Systems
    2007 - 2013

Community

You need to have a working account to view this content. Click here to join now