Asad hussain

Assistant Manager E&I at Servis Longmarch Tyres
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lahore District, Punjab, Pakistan, PK
Languages
  • English Full professional proficiency
  • Urdu Native or bilingual proficiency
  • Sindhi Professional working proficiency
  • saraiki Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Siemens PLC and Drives Training
    Siemens
    Aug, 2021
    - Nov, 2024
  • Wind turbine rescue and climbing training
    Mira Rope Access
    Jan, 2016
    - Nov, 2024

Experience

    • Pakistan
    • Manufacturing
    • 1 - 100 Employee
    • Assistant Manager E&I
      • Sep 2020 - Present

      To ensure smooth working of Instrumentation and automation system installed on whole Tyre division.Modifications in the Instrumentation and control equipment installed mainly on business critical Assets including1- Coal fired Boiler 25ton/hour.2- Mixing unit BM440 BM 305 Ferrell 160 and Nippon 160.3- Four Bowl calandar.4-Tyre building Machines for ULT,MCTT,CTT and Agricultural Tyre Tube.5-Tyre Curing Presses for ULT,MCTT,CTT and Agricultural Tyre Tube.6- Instrument calibration Record maintenance and calibration Audits.7- Instrumentation Related installation commissioning and startup for upcoming projects to be installed at SIL Tyre division.Major Tasks Completed1-Installation and commissioning of 870 kw solar power plant2-Mitsubishi MR-J4 Based Servo Drive Modification in Bias Cutter.3-In house Commissioning of BOM Curing Press for Tyre Curing4-Scada Based energy monitoring system for LT distribution.5-In House Instrumentation and Automation Modification in ULT Tyre Curing Presses.6-In house Modification in Coal Fired Boiler PLC and Scada by integrating Pressure Transmitter onSuperheater.7-Standardization of calibration method and documentation using relevant Master Calibration equipment.8-Duplex Extruder Automation on Tread Width Control

    • Pakistan
    • Glass, Ceramics and Concrete Manufacturing
    • 300 - 400 Employee
    • Electrical and Instrumentation Engineer
      • Aug 2016 - Sep 2020

      Synchronizing of Cummins Diesel generator withWaukesha Gas Engines.To ensure smooth and efficient running of all the electrical and control related equipment.Installation, commissioning and operation of 150TPD Automatic Batch Plant.Installation, commissioning and operation of Image processing based Glass Inspection machine.Rebuilt and Up gradation of 150TPD capacity Glass Melting Furnace.Design, Installation and commissioning of Scada based energy metering system.Installation of Boosting System for Glass Melting Furnace.Installation of new LT panel capacity 2500Amp.Design the SLD for LT panel.Up gradation of Rosario C2C ACL Printing Machine control System.Installation of Mitsubishi FX 3G-24M For for hearth temperature control.Installation and calibration of AGR Ramp pressure tester machine.Installation of VFD’s on mold cooling blowers. Installation of automatic Shrink Wraping Machine

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Electrical snd instrumentation engineer
      • Mar 2015 - Aug 2016

      Control and power work of wind turbine generator.Wind speed wind direction sensors andWind turbine elevator.Control panels and MV panels132KV grid station.client( engro polymer)Overhauling and Installation of “TOM-E-DECANTAR TRH-050 Centrifuge at PVC1” and “Satake Multimixer”.Calibration of “Positioner of Fisher Control Valves”, “Oxymate Analyzer 6F”, “Rosemount 3051 Pressure Transmitters” and“3051 CF Series FlowTransmitters”.Corrective maintenance of Pressure Safety Valves.Testing of Thermocouple and RTD by JOFRA ITC 65-CA, Contact type Level Switches FE154 Shut down maintenance ofEDC/VCM plant.Understanding the DCS system installed EPCL.Lapping and Hydro Testing of Fisher Control ValvesInstallation and Calibration of DP HARP EJA 430A by Hart Field Communicator.Hydro Jetting of Heat Exchangers.Preventive and Corrective Maintenance of HCL Refrigerator Control Panel

    • Pakistan
    • Glass, Ceramics and Concrete Manufacturing
    • 1 - 100 Employee
    • Electrical and Instrumentation Trainee Engineer
      • Apr 2013 - Mar 2015

      Rountine,Preventive and Schduled maintainance of IS machines.Understanding overall glass forming process.Modify the overall control system.Deigning of overall plant PFD.Design an emergency mechanism to prevent the shear of IS Machine under sudden power shutdown using pneumaticvalves.Compressor control using PLC and HMI. Rountine,Preventive and Schduled maintainance of IS machines.Understanding overall glass forming process.Modify the overall control system.Deigning of overall plant PFD.Design an emergency mechanism to prevent the shear of IS Machine under sudden power shutdown using pneumaticvalves.Compressor control using PLC and HMI.

Education

  • University of Engineering and Technology, Lahore
    Bachelor of Engineering (B.E.), Mechatronics, Robotics, and Automation Engineering
    2009 - 2013

Community

You need to have a working account to view this content. Click here to join now