Asad Arfat Ali Tikka

Welding Inspector at Sinsina Industrial Works
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bihar, India, IN
Languages
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Six Sigma White Belt Certification
    sixsigmaonline USA
    Jul, 2021
    - Nov, 2024
  • ASNT NDT Level II (ASNT)
    Imech Institute Pvt Ltd | HVAC | QA QC | NDT | MEP | SAFETY | NEBOSH | CSWIP Courses in Hyderabad
  • ISO 9001 Lead Auditor - Quality Certification
    IRCA | International Register of Certificated Auditors
  • cswip3.1
    TWI
  • iosh
    IOSH

Experience

    • Saudi Arabia
    • Oil and Gas
    • 1 - 100 Employee
    • Welding Inspector
      • Jan 2023 - Present

    • Saudi Arabia
    • Oil and Gas
    • 300 - 400 Employee
    • Welding Inspector
      • Jan 2020 - Oct 2021

      Welding Inspection:As a (Welding inspector) Fit-up inspection, root gap, Bevel lip, Bevel angle, misalignment, Dissimilar thickness Bevel Preparation , as per approved WPS and ASME B 31.3,31.4,31.8 Inspection of welding equipment and check the welding consumables certificates Record of welding, Heat number, item code, spool drawing, isometric drawing, consumable batch number, welder number, weld joint number 4. Calibration of oven for electrodes and consumable Witness of preheating as per approved WPS or ASME B 31.3 Check the base metal to be welded as per drawing / WPS Inspection of NDT matrix from isometric, Release the NDT, PWHT, Hardness Testing and PMI as Applicable. Co-ordination with the Key Personnel involved in the project concerning quality Inspection of material before fabrication spools as per approved drawing Checking of pipe spool fabrication based on approved spool isometric drawing, bill of materials, QCP and applicable codes Dimensional Checking, Orientation, Configuration, Material traceability, Transfer of Heat numbers etc Documenting & keeping records of applicable QC documents and reports Initiating non-conformance reports (NCR) in case of non-conformity or if deviation arises from Codes/Standards Inspection of site/shop at various vendor facilities for project work as required  Responsible for co-ordination of all QC works as per planning schedule Welder Qualification of Different Contractors Material request for fabrication of fitting and pipe Control of loath of manpower & solve all kind problems in drawing & give advice for job During my working in various companies and different sites, I have gained knowledge regarding the following safety related aspects through the trainings Show less

    • Materialman SAP MM
      • Sep 2019 - Dec 2019

    • India
    • Construction
    • 700 & Above Employee
    • Welding Inspector
      • Sep 2016 - Sep 2019

       Fit-up inspection, root gap, Bevel lip, Bevel angle, misalignment, Dissimilar thickness Bevel Preparation, as per approved WPS and ASME B 31.3,31.4,31.8  Inspection of welding equipment and check the welding consumables certificates  Record of welding, Heat number, item code, spool drawing, isometric drawing, consumable batch number, welder number, weld joint number  Calibration of oven for electrodes and consumable  Witness of preheating as per approved WPS or ASME B 31.3  Check the base metal to be welded as per drawing / WPS  Inspection of NDT matrix from isometric, Release the NDT, PWHT, Hardness Testing and PMI as Applicable.  Co-ordination with the Key Personnel involved in the project concerning quality  Inspection of material before fabrication spools as per approved drawing  Checking of pipe spool fabrication based on approved spool isometric drawing, bill of materials, QCP and applicable codes  Dimensional Checking, Orientation, Configuration, Material traceability, Transfer of Heat numbers etc.  Documenting & keeping records of applicable QC documents and reports  Initiating non-conformance reports (NCR) in case of non-conformity or if deviation arises from Codes/Standards  Inspection of site/shop at various vendor facilities for project work as required  Responsible for co-ordination of all QC works as per planning schedule  Welder Qualification of Different Contractors  Material request for fabrication of fitting and pipe  Control of loath of manpower & solve all kind problems in drawing & give advice for job Review Material Test Certificate (MTC) of all Pipe  To carry out of Over Shortage and Damage (O.S & D) report of all material.  Witness of NDT Methods such as MT, UT, PT, VT for Static Equipment such as Exchangers, Reactors, Heaters, Vessels and Storage Tank.  Involved in WPS& WPQR. Show less

    • Welding Supervisor
      • Jul 2014 - Aug 2016

Education

  • ditm
    mechanical engineer, Mechanical Engineering
    2010 - 2014

Community

You need to have a working account to view this content. Click here to join now