ARUN KUMAR

SUB INSPECTOR at Central Industrial Security Force (cisf)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Shrawan Gupta

Arun is a best co-worker to have in your team. The way he finds solutions to the new problems at sites thus keeping the ability to complete the task before time is great. Whenever I am with him I get to learn an improve myself. As a person he is cool tempered, solution finder, understanding.. I wish him All the best for his future.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Security and Investigations
    • 500 - 600 Employee
    • SUB INSPECTOR
      • Aug 2013 - Present

    • Finland
    • Telecommunications
    • 700 & Above Employee
    • FIELD OPERATIONS ENGINEER
      • Dec 2011 - Aug 2013

      • Operation & Maintenance of Nokia Flexi EDGE BTS Sites, Alarms monitoring of BTS Cell Sites. • Maintenance / Implementation / Trouble shooting of Nokia Flexi BSC 3i . Implementation for Nokia Flexi BSC 3i. • BSC Operation, Maintenance & Migration of Nokia Flexi EDGE BTS Sites ,Ceragon mux FIU19 from One BSC to another BSC , Alarms monitoring of BSC's and their Cell Sites. • Looked after Operations and Maintenance of BSC. • Integration of Sites with Routing of E1 and Patching E1. • Creation, & Addition of sites in BSC at A-Bis interface. • Hands on of all the Service affecting faults such as diversity, TRX fault, VSWR etc. of all Sites. • Trouble Shooting of BTS equipments at site in co-ordination with NMS team an Integration/ testing of BTS equipment. • Declaring site to be ready for Radiation & delegating the site to the RF Team for Drive test with VSWR Measurement and Return losses of the IF Cable.

    • BTS Project Engineer
      • Nov 2010 - Sep 2011

      • Co-ordination with five Project Engineers for Telecom Implementation for New Roll out sites. • Installation, commissioning and Integration ZTE 3G BTS,ZTE(8800,8700,8906,8206). • (Creation, & Addition) of sites in BSC at A-Bis interface. • Routing of E1 and Patching E1. • Measurements the VSWR with (Bird, Gencom, Anristu) & AT of Sites. • Rectification & Troubleshooting of sites. • infra & Telecom Vendor Management for New Roll Out sites for making sites RFI & Telecom Implementation. • Co-ordination with O & M Team for getting E1, Database & RF team for Drive test for new sites. • Overall Project Management for Telecom & Infra Implementation for New Roll Outs at cluster level. • Handing over the new sites to O & M with Quality & with minimum PUNCH Points. Punch Point clearance in given time. • Managed to handover Approx. 200 sites with quality to the customer till date with ZTE.

    • Project Engineer
      • Jan 2010 - Sep 2010

      Job profile: Swapping of Motorola BTS by ZTE BTS, Integration and commissioning of various ZTE BTS's,included Commissioning / Integration / Trouble shooting / maintenance of ZTE BTS sites. Material Management, Telecom Implementation and Co-ordination with NOC and all the Sub Vendors and Teams. Job profile: Swapping of Motorola BTS by ZTE BTS, Integration and commissioning of various ZTE BTS's,included Commissioning / Integration / Trouble shooting / maintenance of ZTE BTS sites. Material Management, Telecom Implementation and Co-ordination with NOC and all the Sub Vendors and Teams.

    • Project Coordinator cum Engineer
      • Jul 2009 - Dec 2009

      Job Profile: Execution of the GSM BTS & Microwave Link sites for Tata, Vodafone UP (W) rollout project. Planning & Control the field activities for Installation, Commissioning, AT, Invoicing. Vendor management, Team deployment & planning to achieve the target in given time frame. Job Profile: Execution of the GSM BTS & Microwave Link sites for Tata, Vodafone UP (W) rollout project. Planning & Control the field activities for Installation, Commissioning, AT, Invoicing. Vendor management, Team deployment & planning to achieve the target in given time frame.

    • Project Engineer
      • May 2008 - Jun 2009

      • Site Survey & Installation and commissioning of Alcatel for Reliance. • Integration of Sites with Routing of E1 and Patching E1 • Rectification & Troubleshooting of sites • Measurements the VSWR with (Bird, Gencom, Anristu) & AT of Sites • Site Survey & Installation and commissioning of Alcatel for Reliance. • Integration of Sites with Routing of E1 and Patching E1 • Rectification & Troubleshooting of sites • Measurements the VSWR with (Bird, Gencom, Anristu) & AT of Sites

Education

  • Institute / University Percentage
    Year; 2008 B.E; M, Electronics & Communication
    2004 - 2008
  • Institute / University Percentage
    Year; 2008 B.E; M, Electronics & Communication
    2004 - 2008
  • RUSTAMJI INSTITUTE OF TECHNOLOGY
    B.E, Electronics & Telecommunications
    2004 - 2008

Community

You need to have a working account to view this content. Click here to join now