Arturo Zumaya

Manager Maintenance at Cambridge International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Matamoros, Tamaulipas, Mexico, MX
Languages
  • Ingles -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Manager Maintenance
      • Aug 2016 - Present

    • France
    • Packaging and Containers Manufacturing
    • 700 & Above Employee
    • Supervisor de Produccion
      • Jan 2015 - Present

  • Bright Finishing
    • Matamoros y alrededores, México
    • Superintendent of Maintenance
      • Jan 2014 - Jan 2015

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Ing. de Equipo
      • Jul 2012 - May 2013

      Coordinate the maintenance in the floor. Technical support on maintenance. Coordinate Pm en the equipment Generate activities in order to improve the OEE Coordinate the maintenance in the floor. Technical support on maintenance. Coordinate Pm en the equipment Generate activities in order to improve the OEE

    • Maintenance Supervisor
      • Jan 2012 - Jun 2012

      Provide technical support to Manufacturing Floor in order to reduce the down time in the production equipment. Install Pm system Order spare parts for the equipment. Get technical support to technician in order repair the equipment. Facilities support , air conditioner and compressor system.. Experience in security system Electric installations Hydraulic systems. Knowledge in PLC and vision system. Knowledge on Miller and Mig solder Provide technical support to Manufacturing Floor in order to reduce the down time in the production equipment. Install Pm system Order spare parts for the equipment. Get technical support to technician in order repair the equipment. Facilities support , air conditioner and compressor system.. Experience in security system Electric installations Hydraulic systems. Knowledge in PLC and vision system. Knowledge on Miller and Mig solder

    • Human Resources Services
    • 1 - 100 Employee
    • Test equipment Engineer
      • Sep 2010 - Sep 2011

      Verify the End Of Line Tester were making the test according the costumer specs. Checks wich mechanical parts in the equipment were critical for each test and put it in the Pm system. Show to the Test Engineer and Technician the mechanical parts that were critical in the equipment for each test. Make a masters parts for calibrate the EOL when it have some PM activity. Modify the test procedure in the EOL according the costumer specs. Implement electronic maintenance on Molding area. Implement a system for Monitoring the OEE on Molding area. Show less

    • Electronic Maintenance Supervisor
      • Jan 1997 - Dec 2009

      Provide technical support to Manufacturing Floor in order to reduce the down time in the production equipment. End of line tester , Press Machine , wave solder machine ,Smt equipment. The company made electronic and electromechanical switches for GM and FORD. Main Achievements & Responsibilities Supervise maintenance pm activities the equipment in the production floor. Get technical support to the technician when they have some problem with the equipment. Install spare parts in the tool crib for the equipment. Generate purchase order when it was necessary. Establish PM system in SMT lines Verify all equipment was in the PM System. Establish communication with the equipment supplier in order to get technical support if it was necessary. Install weekly maintenance control reports and trend charts for improvement in each area of responsibility. Establish target for the performance in Pm activities. Audit the system Pm every six months. Transfer lines between plant Winamack USA to Condura, and Rochester Hills to Condura. Establish Pm activities to SMT equipment like Screen Printer, Chip Shooter, Reflow Oven, Wave Solder, HP, Axiales, Radiales and Nordson equipment. Modify existent equipment in kaizen activities. Design new equipment and debug. Supervise 5 technicians. Made changes in the equipment when it were necessary in the Kaizen activities or costumer compliances. Design some tools in order to detect bad products (Poka yokes). Show less

    • General Maintenance Supervisor
      • Apr 1989 - Jan 1997

      Supervise maintenance activities in the second shift. Main Achievements & Responsibilities Support all the necessities of maintenance in the second shift, air , electricity and air conditioner. Get technical support to the technicians. Develop new equipment. Install equipment in the production floor. Supervise 10 technicians. Establish target for the performance in Pm activities. Support the manufacturing floor. Made tools for detects defects in the products.poka yokes Show less

    • Curse First line supervisor
      • Jan 1989 - Jan 1993

      Industrial security PLC course Industrial security PLC course

    • Quality technician
      • Sep 1986 - Jan 1987

      Verify that Pc boards were correctly assembly Educational Background and Skills Control process by computer Dec 1988 Verify that Pc boards were correctly assembly Educational Background and Skills Control process by computer Dec 1988

Education

  • Universidad Autónoma de Nuevo León
    Maestria en Ingenieria Industrial y Produccion
    2000 - 2002
  • Univerdsidad autonoma de Nuevo Leon
    Ingeniero en control y Computacion, Oct
    1983 - 1989

Community

You need to have a working account to view this content. Click here to join now