Arturo Vega
Instrument Engineer at ProLytX - Engineering IT- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Spanish Native or bilingual proficiency
-
Portuguese Limited working proficiency
Topline Score
Bio
Experience
-
ProLytX - Engineering IT
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Instrument Engineer
-
Oct 2022 - Present
Databases migration to the Instrumentation module - Intools SPI. Databases migration to the Instrumentation module - Intools SPI.
-
-
-
ENGlobal
-
United States
-
Oil and Gas
-
700 & Above Employee
-
I&C Engineer
-
Jun 2022 - Sep 2022
-
-
-
Own Business
-
Houston, Texas, United States
-
New York Stock Market Investor
-
May 2020 - Jun 2022
Development and education in stock market strategies and trend analysis for investment. Placed stock option orders based on trending analysis, interpretation, and risk assessments on volume and pricing patterns. Sensitive order decisions based on ever-changing market conditions to maximize profits due to market volatility. Development and education in stock market strategies and trend analysis for investment. Placed stock option orders based on trending analysis, interpretation, and risk assessments on volume and pricing patterns. Sensitive order decisions based on ever-changing market conditions to maximize profits due to market volatility.
-
-
-
Optimized Process Designs LLC
-
United States
-
Oil and Gas
-
200 - 300 Employee
-
Assistant lead
-
Aug 2019 - Apr 2020
- Comstock – Enterprise - Train 7 - Targa - Part of the commissioning team for Isobutane Dehydrogenation Unit - Enterprise - Mount View, Tx - Comstock – Enterprise - Train 7 - Targa - Part of the commissioning team for Isobutane Dehydrogenation Unit - Enterprise - Mount View, Tx
-
-
-
Massy Energy Colombia S.A.S.
-
Colombia
-
Oil, Gas, and Mining
-
700 & Above Employee
-
Instrumentation Project Lead
-
Sep 2017 - Jun 2019
Massy Energy, Bogotá, Colombia September 2017 – May 2019 Instrumentation Engineer Lead– Midstream facilities (EPC Projects). • Developed, reviewed, approved, and issued engineering discipline documents. ● Estimated man-hours and preparation for WBS proposals. ● Launched material take-off, followed up, and expedited purchases for the procurement area. ● Provided Construction Field support ● Safety instrumented loop diagrams definition and issuance. Show less
-
-
-
Wood
-
United Kingdom
-
Professional Services
-
700 & Above Employee
-
Project Engineer / Instrumentation Engineer
-
Jul 2012 - Aug 2017
Project Engineer / Instrumentation Engineer for Onshore / OffShore Facilities / Midstream● Interface with client technical personnel as required● Worked as a project team, managing projects within the budget and schedule● Assisted with review of design documents, data sheets and drawings.● Established guidelines for equipment, drawing and line numbering● Coordinated P&ID updates and changelog record and also for Isos, Mechanical packages, Electrical Drawings, and Instrumentation Diagrams.● Updated Action Item List ● Support the design disciplines interface with Project Management and provide to the design disciplines with required information● Prepared, approved, and followed up equipment packages for technical evaluation, purchase, change order, fabrication drawings and inspection.● Assisted the client in meeting engineering deadlines to keep all disciplines’ schedules on track.● Reviewed and approved project material requisitions and followed up on each item on the PO with vendors.● Assisted field construction.● Hazop / What if studies coordination and attendanceProject - Client - Duration- South Pass 89E Expansion – BP – Kiewit (Golf of Mexico – USA). February – Jun 2017 - Ethylene Expert – Dow (Freeport – Tx –USA). September 2015 – January 2017- LHC-9 – Dow – Gulfstream Program (Freeport – Tx – USA). April 2014 – August 2015- Smith Bluff – Shell (Port Neches – Tx – USA) November 2013 – March 2014- Garyville Compressor Station – Shell (Garyville – LA – USA). May – October 2013- Port Arthur Dry Gas Station – Shell (Port Arthur – Tx – USA). January – April 2013- Mariner West Pipeline Project – Sunoco Logistic Partners (PA – USA) September – December 2012 Show less
-
-
Project Engineer
-
Feb 2009 - Jun 2012
Project Engineer – Facilities / Midstream December 2010 – August 2012● Management of multidisciplinary team activities. ● Responsible for project scheduling and tracking changes. ● Reviewed and approved all official deliverables to meet contract and client goals. ● Coordinated all disciplines interfaces within detailed engineering. ● Prepared and updated action lists in a timely manner. ● Expedited information and data as required by design disciplines.● Ensured adherence to deadlines.● Ensured client requirements were clearly defined and communicated within the team.● Issued, reviewed, and approved materials’ lists for purchasing.● Coordinated all disciplines’ boundaries to avoid interferences between equipment on a 3D model. Project - Client - Duration- Basic and Detail Engineering for Araguaney Pumping Station (600 KBPD) as part of Bicentenario Pipeline (Yopal – Casanare – Colombia). December 2010 – August 2012Lead Instrumentation & Control Engineer (Facilities/Upstream) February 2009 - November 2010● Planned, scheduled, and coordinated all assigned engineering work.● Assisted in selecting staff and assigning to projects. ● Managed discipline.● Developed, reviewed, and approved all instrumentation & control documentation with SPI Software (Instruments Specifications, Data Sheets, I/O List, Instrument Index, Hook-up drawings, BOM/MTO, Loops, Bids tabulations, Cable Schedules, Logic Diagrams, BPCS/ESD/PLC/DCS/F&G Systems Architectures & specifications, Instrument and Sizing calculations, Instrument location DWGs, Cause & Effect, etc.● Supervised design and engineering.● Approved vendor information packages (Drawings, material, and specifications).● Attended to Hazop & What if studies and report issuance assistance Show less
-
-
-
Ocensa
-
Oil and Gas
-
100 - 200 Employee
-
Project Engineer
-
Oct 2007 - Dec 2008
Project Engineer (Facilities / Midstream) ● Provided technical support for project management division. ● Responsible for execution and supervision of minor worksites, facilities improvements, and tests or procedures development at pipeline and pump stations. Project - Duration - Pipeline and facilities technological actualization for heavy crude oil transportation (1 MM BFPD) (Porvenir / Miraflores – Boyaca – Colombia) November 2007 – December 2008 Show less
-
-
-
Inelectra
-
Venezuela
-
Oil and Gas
-
700 & Above Employee
-
Instrumentation Project Lead
-
Jan 1999 - Oct 2007
Instrumentation & Control Lead Engineer (Facilities / Downstream) ● Same position duties described above for Lead Instrumentation & Control Engineer. Project - Client - Engineering Procurement & Construction (EPC) for the New Hydrodesulfurization Plant – Colombian Oil Company (ECOPETROL) (Barrancabermeja (Eja) – Colombia). - Field supervisor for the Dewaxing Plant project (Construction, Pre-commissioning, Commissioning and start up) – ECOPETROL (Eja – Colombia). - Detailed Engineering for Ammonia plant compressor – ECOPETROL (EJA – Colombia). - FEED for Automation of Trichloroethylene system in a Vinyl Acetate Plant and Relocation of stripper column and associated equipment – PETCO (Cartagena – Colombia). - Flare system EPC – ECOPETROL (Eja – Colombia). - Detail Engineering for the Dewaxing Plant project – ECOPETROL (Eja – Colombia). - Basic and detailed engineering for a Naphtha system – ECOPETROL (Eja ). - Detailed Engineering for "Improving controls for catalytic cracking plant – ECOPETROL (Cartagena – Colombia). - Detailed Engineering for a new Power Generation Facilities for Central Oil Process Facilities (CPF) – PERENCO (Quito – Ecuador) - Detailed Engineering for construction of the new storage tanks - CHEVRON / TEXACO (Maracaibo – Venezuela). - EPC for SCADA system between nine (9) offshore platforms at Maracaibo´s Lake - SHELL (Maracaibo – Venezuela). - EPC for The new Alkylation Plant – ECOPETROL (Eja – Colombia). - EPC Sulfuric acid plant revamping- ECOPETROL (Eja – Colombia). - EPC for Conversion from simple cycle to combined cycle of "La Sierra" Thermal Power Plant – Empresas Publicas de Medellin (La Sierra - Colombia). Show less
-
-
Education
-
Escuela Colombiana de Ingeniería 'Julio Garavito'
Bachelor of Science in Electrical Engineering, Engineering -
Instituto Tecnico La Salle
Industrial Instrumentation Technician, Electrical and Electronics Engineering