Artjoms Ivanovs

Technician at CTS OFFSHORE AND MARINE
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Latvia, LV

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Perrie Caster

I worked with Artjoms on the Formosa 2 project (OWF) Art was very keen to learn new parts of the project to gain new skills for the the Job. He was very experienced on deck in his role as Rigger. I would highly recommend Artjoms for future roles as Deck Rigger.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Technician
      • Jul 2023 - Present

    • Netherlands
    • Civil Engineering
    • 700 & Above Employee
    • Tower Rigger
      • May 2023 - Jul 2023

    • Rigger
      • Feb 2023 - May 2023

    • Belgium
    • Civil Engineering
    • 700 & Above Employee
    • Tower Rigger
      • Apr 2023 - May 2023

    • Luxembourg
    • Construction
    • 700 & Above Employee
    • Tower rigger
      • Dec 2022 - Feb 2023

    • Belgium
    • Civil Engineering
    • 700 & Above Employee
    • Tower rigger
      • Sep 2022 - Oct 2022

      Kaskasi Project in Germany. Worked as a tower riggger. Tower mob. Demob. Cable pulling , hang-off installation. Kaskasi Project in Germany. Worked as a tower riggger. Tower mob. Demob. Cable pulling , hang-off installation.

    • Luxembourg
    • Construction
    • 700 & Above Employee
    • Rigger
      • Aug 2022 - Sep 2022

      Farmosa 2 project. Jackets , TP installation, melcal crane operator, cherry picker and forklift driver. Bolting, rigging , hoisting. Farmosa 2 project. Jackets , TP installation, melcal crane operator, cherry picker and forklift driver. Bolting, rigging , hoisting.

    • Italy
    • Engineering Services
    • 700 & Above Employee
    • Rigger
      • Jul 2022 - Jul 2022

    • Rigger
      • Apr 2022 - Jul 2022

      Farmosa 2 project, Bokalift1 TP Jacket installation,bolting , working with cherry picker, melcal crane , all kinds of lifting. Farmosa 2 project, Bokalift1 TP Jacket installation,bolting , working with cherry picker, melcal crane , all kinds of lifting.

    • Belgium
    • Civil Engineering
    • 700 & Above Employee
    • Rigger
      • Jul 2021 - Dec 2021

      Living Stone cable vessel. Cable Loading , connection , testing. Lifting and transporting different type of loads .. Different works with crane as a banksman. Saint Nazaire Project Innovation Jack up vessel.Monopiles Installations( Drilling,hammer), MODIGA Installations, TP preparation and Installations., Lifting and hoisting. HKZ project Living Stone cable vessel. Mobilization , connection , testing . Lifting and hoisting , moving and transporting different type of loads and equipment. Continuosly monitor rigging equipment being used and remove from service and found defective. Show less

    • Denmark
    • Maritime Transportation
    • 100 - 200 Employee
    • Rigger
      • Apr 2021 - May 2021

      HORNSEA 2 Wind offshore Project. Monopiles and TP installations on Wind Orca Gamba project. Gabon . SPM( single point mooring buoy) preparation and installation Anchors installation. HORNSEA 2 Wind offshore Project. Monopiles and TP installations on Wind Orca Gamba project. Gabon . SPM( single point mooring buoy) preparation and installation Anchors installation.

    • Netherlands
    • Civil Engineering
    • 700 & Above Employee
    • Rigger/Banksman
      • Jul 2018 - Mar 2021

      Viking & Vulcan oil rigs decommissioning project. Heavy lift Bokalift 1.Secondary works on Boka da Vinci Banking crane, safety representative, doing Mobilisation on vessel for project. Preparing site for rigging and lifting operations. Work in confined spaces and working at heights.Preparing rigging for jackets lifting. Demobilization and Mobilization At Boka Da Vinci and Bokalifit1

    • Rigger
      • Jul 2018 - Sep 2019

    • Transportation, Logistics, Supply Chain and Storage
    • 700 & Above Employee
    • AB/Rigger
      • Mar 2018 - Apr 2018

      Wind farm Wind farm

    • Norway
    • Renewable Energy Power Generation
    • 700 & Above Employee
    • Rigger
      • Jul 2017 - Oct 2017

      Crane work deploying various installations i.e. manifolds,piles, TP`s, jackets, top sides etc.. Control movements of heavy equipment using chain falls, gin poles etc. Select cables, ropes, blocks and sheaves according to weight and size of load to be moved, TP`s and MP`s grouting activities. Crane work deploying various installations i.e. manifolds,piles, TP`s, jackets, top sides etc.. Control movements of heavy equipment using chain falls, gin poles etc. Select cables, ropes, blocks and sheaves according to weight and size of load to be moved, TP`s and MP`s grouting activities.

Community

You need to have a working account to view this content. Click here to join now