邱浚智Arthur Chiu
Project Manager at Silvaco- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Chinese -
Topline Score
Bio
Experience
-
Silvaco
-
Denmark
-
International Trade and Development
-
1 - 100 Employee
-
Project Manager
-
Jun 2010 - Present
-
-
-
-
CAD Engineer
-
Sep 2004 - Jul 2010
Responsibilities: > LCD Mask Layout Automation and Verification > LCD Mask Layout Design > Font end/ back-end EDA tool evaluate/ benchmark and problem solving. > Red Hat Linux and Solaris UNIX System Administrator. Achievement: > Create LVS verification flow to ensure correctly electronic connection on panel layout. This flow combine different netlist file from different tools, such as Laker ADP, Cadence OrCAD and Mentor DA_IC. Furthermore, Calibre LVS rule file will be generated automatically in different process by user’s requirement. The flow integrated with Calibre and tcl/tk program. This flow had been adopted in mask tapeout flow and detected several significant mistakes. > Create DRC rule file for difference process like LTPS and FFS. In each process had different specifications and consequently need to revise DRC rule file. This DRC rule file can detect 80% mistake in mask layout. > Build up substrate layout automation platform to improve efficiency of layout designer. Layout editor is integrated with tcl/tk program in the platform. In general case, this platform can reduce 3~5 days of lead-time and improve accuracy of layout in mask design flow. > Build up Design Flow for Amorphous Silicon Gate Design. Flow includes schematic design (Laker ADP ), circuit pre-simulation/ po-simulation (Mentor Eldo), layout design (Laker), RC extraction ( Mentor xRC ) . Several products had been tapeout by this flow. > Experience of LCD Mask tapeout. Show less
-
-
-
Delta Electronics
-
Taiwan
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Network Engineer
-
Sep 1996 - Sep 2002
Responsibilities: >Internet/Intranet Network Management >Server Management and Maintenance >End user problem solving Achievement: > Lotus cc-mail system migrates to Microsoft Exchange Server. >Ensure intranet connection is well of each site in Taiwan. The lost connect rate is less then 2% .(5 days of year ) > Keep servers are running in server room at head office. > Base on experience of server and network management, I passed Microsoft MCSE certification and Cisco CCNA certification by self study. Show less
-
-
Education
-
Yuan-Ze University
Master of Science (M.S.), Computer Science