Project Engineer at Arkad Engineering & Construction Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Arkad Engineering & Construction Company
-
Saudi Arabia
-
Construction
-
700 & Above Employee
-
Project Engineer
-
Dec 2017 - Present
Client: Saudi Aramco Project: Master Gas System Phase-II Package-IEPC of 422 KM 56” underground pipe line start from Pump station 07 near Riyadh to pump station 11 near Medina. Major scope is to construct the ROW along the Pipe line, construction of pipe line, 19 Valve station, Burn Pits, Black Powder Filtration System, Corrosion inhibitor Skids, eleven (11) Thrust Bore Road Crossing.Responsibilities:Pipeline• Liaising with Qc for the receiving inspection of 56” pipes.• Coordinate with team for proper storage of received material.• Supervise the team for stringing the pipes along the ROW.• Monitor the team for 56” joints welding as per weld map• Giving input to engineering department regarding weld map, redlines, TQs & JSI• Applying holiday test prior to backfilling of trench• Assigning the team for Tie-In weld jointsPiping• Coordinating for receiving inspection of A/G spools• Transporting the A/G spools from Fabrication shop to valve stations & pump stations• Supervising the team for Field Weld joints • Installing the spools on Pipe racks, pipe supports, sleepers & shoe supportsFabrication • To Verify the BOQ of steel structure of all pump stations & valve stations• To coordinate with Qc for the receiving inspection of steel structure material• Fabricating the Pipe Racks/Ring Girder/ShoeSupports/Platforms/Pipe Supports• Fabricating the stairs/Ladder/Hand Rail• Coordinating with Qc for the releasing the fabricated material for Galvanizing• Dispatching the material for Galvanizing after releasing from Qc• Keeping record properly of released & Galvanized materialErection/Installation• Shimming & chipping of Civil foundations• Installation of Pipe supports & Pipe racks• Erection of platforms• Installing the ring Girders & shoe supports• Installing the Grating & Stair treads• Installation of Platform Ladders• Leveling & alignment of Platform & Pipe supports Show less
-
-
Project Engineer
-
Sep 2016 - Nov 2017
Client: Saudi Aramco Project: Onshore Maintain Potential Program OMPP-NA-1B (KP-29)To accommodate the new oil wells KRSN-128/133/134, KP-29 Mechanical Scope of work includes:o Installation of CS 12” A/G trunk line (3Km)o Installation of CS 12” production headero Installation of CS 10” Test Headero Installation of CS 8” hook up & flow lines of wells KRSN-128,133,134 respectivelyo Installation of CS 8” MPFM Inlet & OutletResponsibilities:Mechanical • IFC MTO comparison with MRS (Material Reconciliation summary sheet)• IFC comparison with site conditions• Follow-up of material collection from Aramco warehouses• Monitoring the proper storage & handling of material received at site• Giving input to engineering department regarding weld map, redlines, TQs & JSI• Assigning tasks to supervisors on daily basis & sharing Next day Plan• Following up with QCs for raising the RFIs of completed work on daily basis• Installation of prefabricated & post fabricated spools• Scheduling with QC the NDT quality test immediately after welding i.e RT, PT, MPT• Lowering in trench the U/G portion of trunkline• Holiday test & backfilling of U/G trunkline• Arranging & supervising the hydra tightening of flanged connections• Performing the internal cleaning of pipelines• Assisting QC to prepare HT packages• Organizing & supervising the team for hydro static leak test• Pigging the trunk line for internal cleaning• Preparing the Daily, weekly & Monthly progress reportsCivil• Extension of well pad as per IFC• Receiving inspection & RFI raising of precast civil foundations with QC• Installation of precast foundation• Excavation, backfilling, compaction FDT for precast & cast-in site foundations• Assigning team for the preparation of formwork, steel fixing & concrete pouring of cast-in site foundations i.e. Removable Anchors, trust anchors, corrosion inhibitor skid etc.• Constructing the Right of way ROW of trunkline• Making berm of U/G trukline Show less
-
-
-
Peoples Steel Mills Ltd
-
Pakistan
-
Industrial Machinery Manufacturing
-
100 - 200 Employee
-
Project Engineer
-
Mar 2012 - Dec 2015
Client: Oil & Gas Development Company Ltd (OGDCL) Pakistan Project: Pirkoh Compression Relocation Project (PCRP)OGDCL awarded a contract to PSM for installation of: o SOLAR Turbine Inc. (A Caterpillar Company), Twin Shaft, 10MW Powero MHI Centrifugal Compressor, 02 Stage Booster Compressor, 154MMscfdo Process piping ASME B31.3o Steel Structure ASTM A36, ASTM A53Responsibilities:• To make sure that pipe fabrication is being done according to isometric weld map.• To monitor that WPS and PQR are being applied while joining the pipes and fittings.• To prepare fit-up and welding reports on daily basis.• Responsible for delivery of assembled and approved material from shop to sand blasting yard.• To ensure that all the near white sand blasting works done are in accordance with the code NACE-2/SA 2.5 and project specification.• To ensure that all the painting works done are in accordance with the code SSPC/NACE and project specification.• To assign targets for accomplishments and ensure targets are met on daily basis.• To submit site daily reports, inspection requests.• Preparation of (B.O.Q) & (B.O.M) as per drawing for supply of Piping Materials.• To coordinate with the subcontractor regarding the day to day operations.• To prepare fit-up reports, welding reports• To update RT, PWHT and Hardness reports.• To update weld control summary.• To carry out all mechanical works and equipment installation activities.• To produce daily, monthly, weekly progress reports.• Supervise hydrostatic leak test of process lines and prepare test packs.• To supervise box-up and prepare reports.• To execute commissioning with designated team.• To prepare and supervise to kill final punch points.• To prepare and submit dossier to client/consultant Show less
-
-
Mechanical Engineer
-
Jul 2010 - Feb 2012
Client: Oil & Gas Development Company Ltd (OGDCL) Pakistan Project: Qadirpur Permeate Compression Project (QPCP)OGDCL awarded a contract to PSM for installation of: o MAN Turbo AG, Twin Shaft, 10MW Powero MHI Centrifugal Compressor, 02 Stage Booster Compressoro Process piping ASME B31.3o Steel Structure ASTM A36, ASTM A53Responsibilities:• To review drawings for omissions, errors, overall quality.• To coordinate with the subcontractor regarding the day to day operations.• To assist and implement assignments given by the site manager.• To Review calculations and stamp construction documents.• To submit requirements and justifications for resources such as materials, tools, equipment and man power.• Giving inputs to civil, electrical / instrumentation groups for various purposes.• To produce weekly and monthly progress reports Show less
-
-