Armando Arenas

I. T. Topografía en N-260 de Campo a Congostos del Ventanillo ( Dragados ) at Topográficas Egea
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Campo, Aragon, Spain, ES
Languages
  • Inglés Native or bilingual proficiency
  • Español Native or bilingual proficiency
  • Chino Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • CSCS card
    Geocisa UK Ltd. (ACS Group)
  • LUCAS card
    Transport for London
  • OLEC1
    Network Rail
  • PTS
    Network Rail
  • SERCO card
    Transport for London

Experience

    • Spain
    • Civil Engineering
    • 1 - 100 Employee
    • I. T. Topografía en N-260 de Campo a Congostos del Ventanillo ( Dragados )
      • Aug 2020 - Present

    • IT Topógrafo en Grupo Marco
      • Oct 2018 - May 2019

      • Topógrafo encargado de todos y cada uno de los trabajos a nivel topográfico realizados en la construcción de los 4 parque eólicos y la subestación de Valcardera. Trabajos tales como: - Replanteo y estaquillado de plataformas y viales de los parques. - Replanteo de cimentación de Aerogeneradores - Mediciones y certificaciones - Trabajos de control - Nivelaciones de bridas - Postprocesado de datos - Paquetes de firmes - Apoyo a tierras - Replanteo con estación total de zapatas en la subestación - Replanteo de drenaje en parques y subestación - Replanteo de la red de tierras en la subestación - Creación de archivos .csv para los trabajos - Calculo de cubicaciones y superficies - Calculo de Acuerdos verticales Show less

    • Government Administration
    • 1 - 100 Employee
    • Topografo Municipal
      • Oct 2017 - Feb 2018

      • Responsable de todos y cada uno de los trabajos en área de urbanismo con respecto a la topografía, tales como replanteos, levantamientos, Control de Calidad, apoyo a proyectos, etc... Por ejemplo, la reciente construcción del campo de rugby en el colegio de Sagrada Familia de Úbeda. • Responsable de todos y cada uno de los trabajos en área de urbanismo con respecto a la topografía, tales como replanteos, levantamientos, Control de Calidad, apoyo a proyectos, etc... Por ejemplo, la reciente construcción del campo de rugby en el colegio de Sagrada Familia de Úbeda.

    • United Kingdom
    • Civil Engineering
    • 700 & Above Employee
    • Foundation Engineer
      • Mar 2016 - Oct 2017

      • Chief Engineer in charge of the preparation, analysis and post-processing of all the stakeout data of each and every one of the piles inserted in the GWEP project (more than 30,000 piles). Armando Arenas Ginés • Chief Engineer in charge of Quality Control in the installation of piles by mechanical processes (Vibration and percussion), being aware of the orientation and inclination of the piles for the installation of the structure of the catenary in the railway. • Use of topographic material such as Total Station TS60, TS40, Leica Viva GPS, Leica DNA Level, etc ... • Post-processing of information in real time using tables and PDAs. • Office work writing reports for the client using AutoCad, Excell and other internal programs. • Daily briefing to the assistants of topography on Work Safety and work processes. • Engineer in charge of soil analysis and exploration (trial holes) for the subsequent analysis of the pile installation, carried out with GPS, Leica DISTO, etc ... • Engineer in charge of the installation of the carrier structure of the catenary in situ, carrying out tasks of Quality Control and data collection to carry out the report. Show less

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Land Surveyor Engineer
      • Nov 2015 - Mar 2016

      CROSSRAIL WEST OUTER ELECTRIFICATION (WOE) CLIENT: balfour beatty - Track Monitoring. Carrying out track monitoring, according to the risk level of the location. Using Total Station Leica TS16, - Steel Works As Built. carrying out every of the measures required by the client of the OLE structure (Mass, Boom SPS, etc.) Using Total Station TS16, Leica DISTO, Height Stagger, track Gauger, inclinometer...etc. - Baseline's works. Carrying out the accommodation of the area that will receive the structure, for once installed, you can monitor it. Attaching target and doing the Baseline readings. - Office's Works. Post-processing of all data acquired in the field. Usinf Excel and Autocad, Show less

    • United Kingdom
    • Architecture and Planning
    • 1 - 100 Employee
    • Topographical Surveyor Engineer
      • Jun 2015 - Oct 2015

      - Engineer on HOPS train, working for Amey and doing the time and motion of the Movax and Fambo record. Setting out the location of the piles. RS1, RS2, RS3, RS4 and RS5.- Engineer on trial holes (Buried services) in RS1, RS2, RS3 and RS4; leaving the soil ready to receive the pile and completing all sections of the report with all measures required. Using Leica GPS, Leica DISTO, Inclinometer, etc.- Engineer on Foundations As Built: taking all measures required by the customer of the piles already installed. Using Leica GPS, Leica DISTO, Inclinometer, etc.- Engineer On Foundations Piling: Taking all the measures required by the client throughout the process of piling both Movax as Fambo as the concrete piles. Using Leica GPS, Leica DISTO, Inclinometer, etc. Show less

    • Land Surveyor Engineer
      • May 2015 - Oct 2015

      Working as Land Surveyor Engineer. Carrying out surveys and stake out for many parts of Scotland, both rural and urban.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Monitoring Surveyor in (BAM Ferrovial Kier JV) and (Dragados Sisk JV)
      • Nov 2014 - May 2015

      CROSSRAIL C305 (DSJV)– Eastern Running Tunnels (Limmo Peninsula to Farringdon; Limmo Peninsula to Victoria Dock; Stepney Green to Pudding Mill Lane) and CROSSRAIL C435 FARRINGDON (BKF). - Daily team briefings and risk assessments. - Carry on toolbox talks following health and safety standards under CROSSRAIL policy. - Monitoring all influence area of the TBM, surrounding streets and buildings during the TBM passage and all railway lines affected (DLR, LU) during the night shift. - High accuracy LEVELLING handling level Leica DNA03. - 3D Monitoring handling TM30 and TS30 Total Stations Leica. - Baseline in the C305 contract in all the areas of the Metropolitan line from Liverpool St. To Barbican. (track levelling and prisms) - Baseline in disused tunnels of the London Underground in Liverpool St Station and Moorgate Station. - Real time monitoring in boreholes and concrete’s injections. - Setting Out. - Stake Out and Surveying handling GPS Leica Viva. - Studs, sockets and prisms Installation. - Installation of Vibrating Wire Strain Gages – hanger replacement - Inclinometer, Piezometer, Extensometer, Crackmeter and Tape Extensometer manual readings. - Drafting. - Check and adjust DNA03 - Daily data processing and daily reports. Show less

  • Intergeo UK
    • London, Reino Unido
    • Land Surveyor engineer en BAM Ferrovial Kier JV- Crossrail & Dragados Sisk JV
      • Mar 2014 - Oct 2014

    • Técnico municipal
      • Sep 2012 - Dec 2012

Education

  • Universidad de Jaén
    Ingeniería, Topografía y cartografía
    2008 - 2012
  • Universidad de Jaén
    Ingeniería Técnica en Topografía, Topografía
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now