Arif Rozaq Kurniawan

Production Planning and Inventory Control (PPIC) at PT Saliman Riyanto Raharjo
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Yogyakarta, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Kurniawan​​ Nugraha

Rozaq is had good leadership and always responsible with his job. Direct problem solver with excellent analytical thinking.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • PRODUCTION PLANNING & CONTROL
    PRODEMY-Productivity Academy
    Nov, 2021
    - Nov, 2024
  • ACCIDENT INVESTIGATION
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • BASIC SAFETY TRAINING (BST)
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS)
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • HACCP - Hazard Analysis & Critical Control Point
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • HEALTH AND SAFETY ENVIRONMENT (HSE) PLAN
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • INDUSTRIAL HYGIENE
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • ISO 14001 : 2015 - Environmental Management System
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • ISO 45001 : 2018 - Occupational Health & Safety Management System
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • ISO 9001 : 2015 - The Quality Management System
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • LOCKOUT / TAGOUT (LOTO)
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • Panitia Pembina Keselamatan dan Kesehatan Kerja (P2K3)
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • QUALITY CONTROL / QUALITY ASSURANCE (QC/QA)
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • SEIRI, SEITON, SEISO, SEIKETSU, SHITSUKE (5S)
    PT. Ajisaka Nusa Ilmu
    Oct, 2021
    - Nov, 2024
  • Hazard Identification, Risk Assesment and Determining Control (HIRADC)
    PT. Ajisaka Nusa Ilmu
    Sep, 2021
    - Nov, 2024
  • ISO 22000 : 2018 - Food Safety Management System
    PT. Ajisaka Nusa Ilmu
    Sep, 2021
    - Nov, 2024
  • ISO 31000 : 2018 - Risk Management
    PT. Ajisaka Nusa Ilmu
    Sep, 2021
    - Nov, 2024
  • JOB SAFETY ANALYSIS (JSA)
    PT. Ajisaka Nusa Ilmu
    Sep, 2021
    - Nov, 2024
  • Sertifikasi Calon Ahli K3 Umum, KEMNAKER RI
    Kementerian Ketenagakerjaan Republik Indonesia
    Sep, 2021
    - Nov, 2024
  • Project Management
    The Institution of Engineers Indonesia (PII)
    Jan, 2018
    - Nov, 2024
  • Quality Management System
    The Institution of Engineers Indonesia (PII)
    Jan, 2018
    - Nov, 2024
  • Certified SolidWorks Associate
    Dassault Systèmes
    Mar, 2017
    - Nov, 2024

Experience

    • Indonesia
    • Food Production
    • 1 - 100 Employee
    • Production Planning and Inventory Control (PPIC)
      • Dec 2021 - Present

      Make a production plan based on the forecast received from marketing. Calculating the need for staple & auxiliary raw materials for production needs. Order raw materials to purchasing department by considering the level of daily raw material usage and arrival lead time. Make a production plan based on the forecast received from marketing. Calculating the need for staple & auxiliary raw materials for production needs. Order raw materials to purchasing department by considering the level of daily raw material usage and arrival lead time.

  • PT. Anggun Kreasi Garment
    • Sedayu, Daerah Istimewa Yogyakarta, Indonesia
    • Industrial Engineering & Planning
      • Feb 2021 - Aug 2021

      Make production forecast, then running production with analysis to ensure production targets are in accordance with the plan Make production forecast, then running production with analysis to ensure production targets are in accordance with the plan

    • Indonesia
    • Insurance
    • 300 - 400 Employee
    • Industrial Engineering Staff
      • Jan 2019 - Feb 2021

      Januari 2019 - November 2019: Staff Industrial Engineering, bagian Production Memiliki tugas dan tanggung jawab: 1. Membuat plan produksi 2, Memastikan line produksi berjalan sesuai plan 3. Berkoordinasi dengan beberapa departement untuk memenuhi kebutuhan produksi 4. Memanajemen line agar produksi berjalan efisien 5. Melakukan observasi proses dan analisis terhadap line apabila terjadi kemacetan produksi 6. Melakukan improvement / diskusi dengan team untuk mecarikan solusi terhadap analisis permasalahan November 2019 - sekarang: Staff Industrial Engineering, bagian Cost Analysis Product Memiliki tugas dan tanggung jawab: 1. Melakukan breakdown proses pada sebuah sketch produk 2. Melakukan analisis dan menentukan estimasi waktu (cost) pembuatan produk pada setiap prosesnya 3. Berkoordinasi dengan departement lain apabila menemukan kerumitan pada proses pembuatan produk 4. Menanggapi nego costing dari marketing apabila cost produk tidak sesuai dengan permintaan buyer Show less

    • Indonesia
    • Higher Education
    • 300 - 400 Employee
    • Laboratory Assistant
      • Sep 2015 - Aug 2018

    • Indonesia
    • Medical Equipment Manufacturing
    • 1 - 100 Employee
    • Quality Assurance (Engineer Internship)
      • Mar 2017 - May 2017

Education

  • Universitas Ahmad Dahlan
    Sarjana, Teknik Industri
    2014 - 2018

Community

You need to have a working account to view this content. Click here to join now