Aries Efendi

Instrumentation and Control Engineer at PT. YTL Jawa Timur (Paiton II Power Station)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
East Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • Instrumentation and Control Engineer
      • Nov 2013 - Present

      Job description : - Manage a work order for maintenance activity - Making a job plan for maintenance activity - Design & calculation on modification equipment - Assess and analysis maintenance problem/defect - Annual Calibration and Resertification - Assist Section Head and Plant Area Engineer for their special task/project Job description : - Manage a work order for maintenance activity - Making a job plan for maintenance activity - Design & calculation on modification equipment - Assess and analysis maintenance problem/defect - Annual Calibration and Resertification - Assist Section Head and Plant Area Engineer for their special task/project

    • Commisioning Staff as Unit Controller
      • Jun 2013 - Aug 2013

    • Main Plant Operator
      • Nov 2010 - May 2013

      1) Routine checks the parameter process in local during normal operation. 2) Reporting the defect, abnormal condition and abnormal operation in local to control room for corrective maintenance. 3) Perform routine inspection and testing of critical equipment. 4) Isolate and De-isolate plant or apparatus from the system. 5) Prepare the system for service after it had been out of service for maintenance. 6) Perform the safety work group meeting for discuss the Health, Safety and Environment issue Show less

Education

  • Institut Teknologi Sepuluh November
    S1, Engineering Physics
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now