Ariel Abraham Cotto

Project Manager at FE Controls Corporation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Calabarzon, Philippines, PH
Languages
  • English -
  • Tagalog -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Facilities Services
    • 1 - 100 Employee
    • Project Manager
      • May 2017 - Present

      assigned at Philippines assigned at Philippines

    • Philippines
    • Information Technology & Services
    • 1 - 100 Employee
    • Testing & Commissioning / Preventive Maintenance
      • Jul 2014 - Apr 2017
    • Malaysia
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Test Engineer - Maxim Integrated Project Based - DDAP - TMT LTX Credence ATE, LoadBoards and Probes
      • Dec 2013 - Jan 2014

      March 2013 to Jan 15, 2014 at Maxim Integrated - Cavite Qualify and Startup Board Repair Services Responsibilities include but are not limited to: • Debug, and implement hardware and software on the TMT LTX platform to validate power management, analog, mixed signal, and signal chain ICs. • Hardware Debug and Repair of Load Boards for System (ATE) and Test Heads. August - December 2012 at Texas Instruments - Baguio BMG - Board Management Group Supervisor / I.T. Support Engineer  Startup and lead BIB (Burn-In-Board) and Feed-Through diagnostics and Repair of AEHR Max3, Max4, KES PV Power5 and MCC (Micro Control Company).  Backup, Recovery, Format, Reformat and Install Operating System on Client Computers.  Install Encryption Software, Anti-Virus and Mal-wares on all Clients as required by Management.  Setup new employee’s e-mail accounts.  Setup and maintain Internet Connection on all Client Computers (LAN, Wi-Fi, WAN)  Attend to on-call problem(s) encountered on day to day basis. Show less

    • United States
    • Semiconductor Manufacturing
    • 700 & Above Employee
    • Equipment Engineer
      • Aug 2012 - Dec 2013

      Board Level Repair of Burn-In Equipment Board Level Repair of Burn-In Equipment

    • Computers and Electronics Manufacturing
    • 1 - 100 Employee
    • R&D - Design Engineer CREO Products - Business Development
      • Jun 2009 - Feb 2012

      Position : Circuit Designer Multisims, Eagle, orCAD, Vision and others. Project : Bluetooth Barcode – Baracuda - US Responsibilities : · Generate Work Instruction from Front-Line to Back-End and Functionality Test. · Monitor and solve Yield, LAR and defects. Position : Design Engineer Project : ISDB-T Set-Up-Box – I Want TV - Philippines Responsibilities : · Generate Schematic Diagram, BOM and PCB lay-out · Design Review of OEM parts · Generate Parts Cross-references and Costing Position : Design Engineer Project : LED Lightings – Cree/Osram LED – CREO Products Responsibilities : · Generate Schematic Diagram, BOM and PCB lay-out · Design Review of alternative Power Supply · Generate Parts Cross-references and Costing · Prototype and Testing Position : Process Engineer Project : HDD Voice Coil – Toshiba and Hitachi – Japan/Philippines Responsibilities : · Monitor and solve Yield, LAR and defects for RTV · Process and Product Evaluation · Time and Motion Study (Standard Time) Position : Test Engineer Project : Techlog Philippines – US Phones (BlackBerry, Motorola, Nokia, LG) Responsibilities : · Product Refurbishing · Phone Flashing and Programing · RF Test · Functionality Test Show less

    • United States
    • Electrical/Electronic Manufacturing
    • 1 - 100 Employee
    • Equipment / Process / Test / Eazix / Test System Development
      • Dec 1995 - Mar 2009

      Eazix IMI Design Team - Test Systems Development / R&D / Reverse Engineering Eazix IMI Design Team - Test Systems Development / R&D / Reverse Engineering

    • Wireless Services
    • 1 - 100 Employee
    • Firmware Test Specialist - ToshibaSamsungST Kawasaki Japan Project
      • Feb 2004 - Jun 2006

      TEST TECHNICIAN (TEST and SYSTEMS DEVELOPMENT - (formerly MHCI - M.Hansson Consulting Inc. )) INTEGRATED MICROELECTRONICS, INC. North Science Ave. Special Export Processing Zone. Laguna Technopark Biñan, Laguna, Philippines 4024 03-APR-2008 to 04-MAY-2009 (1 Year)  Responsible in defining requirements, participating in system design, implementation of design on test article through installation, calibration and check out, and maintenance / troubleshooting of system throughout the test program.  Responsible in outsourcing of parts and material for BOM generation for incoming projects.  Responsible in attending on-site technical support for previous projects. TEST TECHNICIAN (SUB-CON for TOSHIBA SAMSUNG STORAGE TECHNOLOGY – JAPAN) INTEGRATED MICROELECTRONICS, INC. Unit 301 Plaz@ Bldg.B 6530 Northgate Cyberzone, Filinvest Corporate City, Alabang Muntinlupa City, Philippines 1770 11-FEB-2006 to 26-MAR-2008 (2 Years)  Responsible in performing Microsoft DTM / WHQL test for ODD products, for MS windows logo certification.  Responsible in reporting test outcomes by collecting data and completing procedural documentation.  Responsible in maintaining good running condition of more the 200 client computers.  Responsible in conducting maintenance and repair of test fixtures and equipment.  Responsible in conducting calibration of test equipment such as Temperature and Humidity Chamber and Disc Quality measurement equipment. Show less

Education

  • University of Perpetual Help System DALTA
    BS ECE, Industrial Electronics Technology/Technician
    1995 - 1998
  • TESDA - Technical Education and Skills Development Authority
    Computer Systems and Applications, Hardware & Software
    2000 - 2000
  • TESDA - Laguna Nortwestern College
    2 Years Electronics Technology, Electrical, Electronic and Communications Engineering Technology/Technician
    1990 - 1992

Community

You need to have a working account to view this content. Click here to join now