Arda Gerdan
Mechanical Design Team Leader at Inventra Mühendislik A.Ş- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
İngilizce Full professional proficiency
Topline Score
Bio
Experience
-
Inventra Mühendislik A.Ş
-
Türkiye
-
Defense and Space Manufacturing
-
1 - 100 Employee
-
Mechanical Design Team Leader
-
Sep 2021 - Present
In accordance with my position in the company, ● Creating system designs with full parametric solid modeling techniques ● To apply design optimization by considering machining and non-conventional manufacturing methods ● Creating technical documentation in accordance with ASME Y14.5 M 1999 standard In accordance with my position in the company, ● Creating system designs with full parametric solid modeling techniques ● To apply design optimization by considering machining and non-conventional manufacturing methods ● Creating technical documentation in accordance with ASME Y14.5 M 1999 standard
-
-
-
Okur Makina
-
Türkiye
-
Machinery Manufacturing
-
1 - 100 Employee
-
Project Engineer
-
Feb 2020 - Sep 2021
During my time at the company, ●In-vehicle dynamic system design ●Performing vibration and shock analyzes ●Realization of manufacturing optimizations ●Determination of factory production capacity and production of parts realization of production planning ●In addition, as per my position, I carry out the processes of planning the works, assigning the tasks, realizing the designs, and providing daily reporting to the senior management. During my time at the company, ●In-vehicle dynamic system design ●Performing vibration and shock analyzes ●Realization of manufacturing optimizations ●Determination of factory production capacity and production of parts realization of production planning ●In addition, as per my position, I carry out the processes of planning the works, assigning the tasks, realizing the designs, and providing daily reporting to the senior management.
-
-
-
MERİH ASANSÖR
-
Türkiye
-
Construction
-
1 - 100 Employee
-
Research And Development Engineer
-
Dec 2017 - Feb 2020
During my time at the company,●Conducting literature research on new projects within the R&D Center,●Drawing solid model designs in line with the information obtained at the end of the research,●Preparing the prototype of the designs according to the structural analysis and analysis results,●Preparing test document reports based on criteria such as conformity to usage conditions, mechanical strength, functionality and lifetime in prototype observations,●Preparing dxf, technical drawing, assembly map and technical catalogs for mass production by different dimensions of accepted designs with smart design,●Realization of smart designs in order to make different dimensions in order to accelerate mass production in new and existing designs,●Creating a test environment for product certification and testing of products by making existing products conform to elevator standards,●Simplification of product assembly for production and preparation of user manuals and technical catalogs of existing products Show less
-
-
Product Development Engineer
-
Jan 2017 - Dec 2017
During my time at the company,●Designing new products in accordance with customer demands and elevator standards and preparing the products for mass production by examining the prototypes,●Preparing a test setup for the certification of existing products in accordance with elevator standards and testing the products,●To facilitate the assembly of products for production, to carry out the processes of preparation of user manuals and technical catalogs of existing products.●Simplification of product assembly for production and preparation of user manuals and technical catalogs of existing products. Show less
-
-
-
Kes Klima
-
Türkiye
-
Wholesale Building Materials
-
1 - 100 Employee
-
Research and Development Engineer
-
May 2016 - Nov 2016
During my time at the company, ●Creating a new product, ●Realizing the design of the product by doing literature research in the projects ●To test the product by making the necessary test setups for prototypes ●To make the product work more efficiently with the aim of making a financial contribution to the company by reducing the product cost by improving the existing products. ●Simplifying production and executing processes by providing ease of assembly During my time at the company, ●Creating a new product, ●Realizing the design of the product by doing literature research in the projects ●To test the product by making the necessary test setups for prototypes ●To make the product work more efficiently with the aim of making a financial contribution to the company by reducing the product cost by improving the existing products. ●Simplifying production and executing processes by providing ease of assembly
-
-
-
-
Internship
-
Aug 2012 - Sep 2012
Manufacturing Procedures Internship I completed various studies in Manufacturing, Welding and Assembly Units. Manufacturing Procedures Internship I completed various studies in Manufacturing, Welding and Assembly Units.
-
-
-
-
Internship
-
Jul 2012 - Aug 2012
Thermal and Mechanical System Analysis internship, I completed various studies in the Boiler Room, R&D and Transport Systems units. Thermal and Mechanical System Analysis internship, I completed various studies in the Boiler Room, R&D and Transport Systems units.
-
-
-
FNSS Savunma Sistemleri A.Ş.
-
Türkiye
-
Defense and Space Manufacturing
-
700 & Above Employee
-
Internship
-
Jul 2011 - Aug 2011
Factory Facility and Organization Internship I worked in the Purchasing, R&D, Source and Quality Control departments of the company. Factory Facility and Organization Internship I worked in the Purchasing, R&D, Source and Quality Control departments of the company.
-
-
Education
-
Gazi Üniversitesi
Makine Mühendisliği -
G.Ü.V Özel Fen Lisesi