Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Electrical Power Testing - Level III
    Hyuandai Heavy Construction Limited.
    Dec, 2017
    - Sep, 2024
  • Industrial Maintenance Electrician
    Natus GmbH & Co.KG
    Mar, 2013
    - Sep, 2024

Experience

    • Iran
    • Construction
    • 1 - 100 Employee
    • Electric Engineer
      • Mar 2022 - Present
    • Oil and Gas
    • 200 - 300 Employee
    • Electrical Engineer
      • Feb 2020 - Feb 2022

      Skilled in installation & Commissining & field test of electrical equipment such as MV & LV Switchgear-Transformers-GenaratorInstallation of HRSG & Gas Turbine(V94.3A ) & ANSALDO Steam Turbin Instruments.Single Shaft /class FAttending to installation and commissioning of auxiliary systems such as fire alarm-water treatment-air compressor-central heating-auxiliary cooling-Gas pressure reduce station-gas final filter station of Gas feed for GAS Turbine (V94.3).Installation of MV and LV bus duct. Show less

    • Electrical Engineer
      • Sep 2020 - Feb 2021

      supervision of commissioning and pre-trialrun testing in MAPNA B.O.O POWER PLANT-ASALOUYEHCommissioning of steam turbine & ACC and HRSG systems including all related equipment’s.Installation of HRSG & Steam Turbin Instruments.Attending to installation and commissioning of fire alarm system.Attended on site meetings with client and contractors and make a technical report.Installation & Commissioning of auxiliary systems related to power block such as lube oil , rotor displacement , seal oil , H2-CO2 , gas oil , high pressure water purging , compressor for blow off valves , hydraulic , gas skid and gas final filtration , ventilation and air dryer Show less

    • Caspain Cycle combained power plant
      • Oct 2017 - Sep 2020

      Skilled in installation & commissining & field test of electrical equipment such as MV & LV switchgear-transformers.Attending to installation and commissioning of Excitation and SFC ( Static Frequency Convertor) system.Installation of HRSG & Gas Turbine(V94.3A ) & ANSALDO Steam Turbin Instruments. single shaft class F.Attending to installation and commissioning of auxiliary systems such as fire alarm-water treatment-air compressor-central heating-auxiliary cooling-Gas pressure reduce station-gas final filter station of Gas feed for GAS Turbine (V94.3). Installation of MV and LV bus duct. Show less

    • Iran
    • Appliances, Electrical, and Electronics Manufacturing
    • 400 - 500 Employee
    • Oil&Gas project
      • Oct 2014 - 2017

      installation & field test of electrical equipment such as MV & LV switchgear & transformer.installation of auxiliary system such as fire alarm-paging-telephone.Installation & commissining of more than 20 substaions and utility.

    • Electrical Engineer
      • Aug 2011 - Oct 2014

      Skilled in installation & commissining & field test of electrical equipment such as MV & LV switchgear-transformers.Attending to installation and commissioning of Excitation and SFC ( Static Frequency Convertor) system.Installation of FOJI generation and VOTH hydro turbine.and commissioning of 3phase power transformer.

Education

  • Islamic Azad University,Science And Research Branch
    Master of Engineering (M.Eng.), Electrical and Electronics Engineering
    2013 - 2015

Community

You need to have a working account to view this content. Click here to join now