Arakkan Niroop

Senior Project Coordinator at Seashore Group Qatar
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Ras Laffan, Al Khor and Al Thakhira, Qatar, QA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Qatar
    • Industrial Machinery Manufacturing
    • 100 - 200 Employee
    • Senior Project Coordinator
      • Jan 2019 - Present

      Supervised waste handling, disposal and recycling ensuring environment compliance. implemented effective inventory management systems for monitoring waste quantities. Acting Qatar Gas host for approving permit to work for waste management divisions. Keeping track of Qatar Gas waste management inventory. Prepared and submitted waste disposal reports to Qatar Gas for compliance and accountability. Strategically planned day to day activities to optimise allocations and ensure smooth operations. Safely managed both solid and liquid waste, enforcing proper segregation and environmental responsible disposal. Managed Tank cleaning activities including removal of sludge in Inert atmosphere adhering to safety protocols. Show less

    • Supervisor
      • Oct 2017 - Dec 2017

      supervised Cleaning of pipelines using high power water jetting. Managed the cleaning of vertical heat exchangers using high power water jetting. supervised in assisting plant maintenance activities. supervised Cleaning of pipelines using high power water jetting. Managed the cleaning of vertical heat exchangers using high power water jetting. supervised in assisting plant maintenance activities.

    • Site Incharge
      • Aug 2017 - Aug 2017

      Blinding and De-Blinding activities. Unloading and loading of demister pads, chevrons from diesel reactor upto final box up. Internal reactor cleaning and maintenance works. Blinding and De-Blinding activities. Unloading and loading of demister pads, chevrons from diesel reactor upto final box up. Internal reactor cleaning and maintenance works.

  • Jyostna Enterprises
    • Mumbai, Maharashtra, India
    • Site incharge
      • Jun 2017 - Jul 2017

      Removal of column manhole, trays and cleaning it with high power water jetting. Re-installation of trays and final box up. Removal of column manhole, trays and cleaning it with high power water jetting. Re-installation of trays and final box up.

  • Aarathi catalyst and solutions
    • Mumbai, Maharashtra, India
    • Site incharge
      • May 2017 - Jun 2017

      supervised internal installation of trays and jhonson beds in dehydrators. Loading of fresh catalyst and ceramic balls in each beds with sunny socks as per the markings. Managed unloading and loading of PSA using vacuum unit. supervised internal installation of trays and jhonson beds in dehydrators. Loading of fresh catalyst and ceramic balls in each beds with sunny socks as per the markings. Managed unloading and loading of PSA using vacuum unit.

    • Saudi Arabia
    • Oil and Gas
    • 700 & Above Employee
    • Permit Holder
      • Apr 2017 - May 2017

      Responsible for day to day permits to work. Managed Blinding and De-Blinding activities prior to the opening the reactor man ways for unloading the catalyst. Responsible for day to day permits to work. Managed Blinding and De-Blinding activities prior to the opening the reactor man ways for unloading the catalyst.

    • Supervisor
      • Jan 2017 - Mar 2017

      Plant Maintenance Removal of blocks from various plant pipelines using high power water jetting. cleaning of heat exchanger bundles and fin fan coolers using high power water jetting. unloading and loading of pall rings from column and cleaning it with water jetting. Unloading and loading of catalyst from PSA. Extracting heat exchanger bundle using bundle puller. Blinding and De-Blinding operations. Plant Maintenance Removal of blocks from various plant pipelines using high power water jetting. cleaning of heat exchanger bundles and fin fan coolers using high power water jetting. unloading and loading of pall rings from column and cleaning it with water jetting. Unloading and loading of catalyst from PSA. Extracting heat exchanger bundle using bundle puller. Blinding and De-Blinding operations.

    • India
    • Construction
    • 1 - 100 Employee
    • Site Engineer
      • Jun 2015 - Nov 2016

      Managed earthworks, markings and foundation bed for the road to be constructed. Managed rigid pavement construction for state highway. Managed earthworks, markings and foundation bed for the road to be constructed. Managed rigid pavement construction for state highway.

    • Saudi Arabia
    • Industry Associations
    • 1 - 100 Employee
    • QA/QC
      • Feb 2014 - Mar 2015

      Oversaw dismantling and re installation of hydrocrackers. Oversaw dismantling and re installation of hydrocrackers.

    • Australia
    • Oil and Gas
    • 400 - 500 Employee
    • Supervisor
      • May 2014 - Dec 2014

      supervised Extraction of heat exchanger bundles using bundle buller. managed in the cleaning of heat exchangers and fin fan coolers using high power water jetting. supervised dehydrator installation. Handled plant Maintenance works. supervised Unloading and loading of catalysts from PSA using vacuum unit. supervised Extraction of heat exchanger bundles using bundle buller. managed in the cleaning of heat exchangers and fin fan coolers using high power water jetting. supervised dehydrator installation. Handled plant Maintenance works. supervised Unloading and loading of catalysts from PSA using vacuum unit.

    • NDT Technician
      • Apr 2014 - May 2014

      Dry penetration test expertise. Magnetic partical test expertise. Ultrasonic test for finding the thickness of equipments. Dry penetration test expertise. Magnetic partical test expertise. Ultrasonic test for finding the thickness of equipments.

    • Australia
    • Oil and Gas
    • 400 - 500 Employee
    • Supervisor
      • Feb 2013 - Mar 2014

      Supervised the cleaning of heat exchangers, fin fan coolers, Slug Catcher and pipelines using high power water jetting. Supervised unloading of wax from wax reactor. Supervised unloading of catalyst from Secondary Reformer using 4" tubes and loading them back using sunny socks. Supervised unloading of catalyst from Primary reformer using vacuum unit and loading it back with Dense loader after the internal maintenance and cleaning of reactor. Removal of column man way for unloading of pall rings, demister pads, chevrons and trays. Cleaning the same with high power water jetting and reinatallation of the same. Supervised the unloading and unloading of catalyst from CCR reactors. Show less

  • Seeco constructions
    • Mangaluru, Karnataka, India
    • Site Supervisor
      • Jan 2013 - Jan 2014

      Coordinated and managed construction activities for Plama habitat high rise residential building Coordinated and managed construction activities for Plama habitat high rise residential building

    • United States
    • Manufacturing
    • Site Supervisor
      • Jun 2009 - Nov 2011

      oversaw 180 luxury apartment units and eminities on a 9 acre site for Diamond city with a budget of 97 cr. Lead construction of 14 storied residential apartments in beach city emphasising architectural design with budget of 88 cr. oversaw 180 luxury apartment units and eminities on a 9 acre site for Diamond city with a budget of 97 cr. Lead construction of 14 storied residential apartments in beach city emphasising architectural design with budget of 88 cr.

Community

You need to have a working account to view this content. Click here to join now