Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Chief Engineer
      • Feb 2021 - Present

      Presently I am working as Lead Engineer for SGCC Project Presently I am working as Lead Engineer for SGCC Project

    • Discipline Manager
      • Mar 2014 - Present
    • Principal Engineer
      • Jan 2008 - Present

      From August 2012 till date Name of Project : Rabigh II CP4 Location : Saudi Arabia Client : Saudi Aramco / Sumitomo Brief Description: Rabigh II CP4 comprises of three major petrochemical unit namely a) MTBE/Isobutylene b) Metathesis and c) MMA and 2 Substation and 3 Process Interface Building (PIB) . Roles & Responsibility: Work as lead Engineer, involved in preparation of SLD , Cable , Power , Lighting, Earthing , Telecom & Fire Alarm layout . The job also involve in preparation of Bill of Material for procurement of bulk material. From February 2011 to December 2011 Name of Project : Ruwais Refinery Expansion (RRE) Location : UAE Client : Takreer Brief Description: RRE project comprises of two major Refinery unit namely a) Whole Crack Naptha Hydrotreater and b) Propylene Recovery Unit and 1 Substation and 1 PIB . Roles & Responsibility: Work as lead Engineer, involved in preparation of SLD, Cable, Power, Lighting, Earthing, Telecom, Cathodic Protection & Fire Alarm layout. The job also involve in preparation of Bill of Material for procurement of bulk material. From July 2008 to April 2009 Name of Project : Nizhnekamsk Refinery Project Location : Tartarstan , Russia UAE Client : JSC TANECO Brief Description: This project comprises of aromatic complex with 6 unit and 4 nos of Substation. Roles & Responsibility: Deputed to Seoul and work as job Engineer . Involved in preparation of Material Request , Data sheet , Technical Query , Technical Bid Evaluation for transformer , HV and LV switchgear , Capacitor , AC & DC UPS , Heat Tracing etc , Show less

    • India
    • Oil and Gas
    • 500 - 600 Employee
    • Deputy Manager
      • Sep 1994 - Dec 2007

      Deputy Manager, Numaligarh Refinery Ltd., Golaghat Assam, 1994-2007 From June 2002 to September 2005 Name of Project : Motor Spirit Project Consultant : Toyo Engineering India Ltd Licensor : Axen Brief Description: This project comprises of Naptha Hydrotreater , Catalytic Reforming and Isomerization with 1 no of substation . From December 1999 to March 2002 Name of Project : Coke Calcination Unit Brief Description: This project comprises conveyor system , rotary klin with incenator and Waste Heat Boiler . For controlling this there is a switchgear and control room with PLC . From September 1994 to October 1999 Name of Project : Numaligarh Refinery Project Brief Description: This is a 3MMTPA Refinery Project comprises of CDU/VDU, DCU , Hydrogen and Hydrocracker with Utilities and offsite tank ages . Responsibilities: • Prepare purchase request for the materials inclusive of technical specification, data sheet, bill of quantity and inspectoion test plan. • Interact and liaison with consultants/process licensor. • Conceptualise the designs, Prepare and finalise design basis/data. • Maintain cordial relationship with vendors and keep a check on their progress. • Carryout the responsibilities of supervising the installation testing and commissioning processes. • Conduct technical bid evaluation. • Inspect and certify factory/site. Show less

Education

  • Visvesvaraya National Institute of Technology
    Electronics and Power
    1988 - 1992
  • Don Bosco High School
    HSLC

Community

You need to have a working account to view this content. Click here to join now