Antonio Arigliano

Managing Director at TTI Flavors
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Umbria, Italy, IT
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Tommaso Pinto

Antonio is a Manager who can see 360 degrees each situation and manages to find possible solutions, can stimulate and enhance his team. Always ready and direct.

Luca Forni

At the time I joined Novartis, Antonio was the well established operations manager in the Packaging Dept. I immediately got in synch with him as our direct way, integrity and attitude was very similar: what is the issue; what are the possible, viable solutions; how do we proficiently execute them. After three years he was also instrumental in the implementation of the major organizational review ever made in the Rosia site where his insight was invaluable. Eager to grow, Antonio was humble enough to undergo a coaching path with myself in order to enhance his qualities and approaches to business issues. I believe Antonio is now ready for a Segment Head role.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Black Belt (Lean Six Sigma)
    George Group

Experience

    • Italy
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Managing Director
      • Nov 2018 - Present

    • United Kingdom
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • OMV Production B11 Operational Manager
      • Jan 2017 - Nov 2018

    • Packaging Operational Manager
      • Mar 2015 - Dec 2016

      I'm responsible for the operations in the Packaging area, managing around 150 people. My main object is to meet the production plan and to optimize the lines usage and people assignment. The area consists of 7 packaging lines and 1 labeling module, with a great variety of technology and type of machines. In this role I have been part of many project for:- electronic batch record implementation- new lines implementation- SAP usage improvement for planning- new automatic warehouse implementation and logistic implovement implementation

    • Switzerland
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Packaging Operational Manger
      • Dec 2008 - Mar 2015

      I'm responsible for the operations in the Packaging area, managing around 150 people. My main object is to meet the production plan and to optimize the lines usage and people assignment. The area consists of 9 packaging lines and 1 labeling module, with a great variety of technology and type of machines. In this role I have been part of many project for:- electronic batch record implementation- new lines implementation- SAP usage improvement for planning- new automatic warehouse implementation and logistic implovement implementation

    • Project Manager
      • Jan 2008 - Dec 2008

      I have covered the position of Project Manager for the site construction and Site Manager for the production already working. The plant produce light carpentry and rubber.I have had the responsibility for:•Coordination of equipment installation•Coordination of production machines supplier, for installation and training •Employee selection•Control of costs•Managing of raw material supplier•Managing contacts with external consultant (HSE, IT, European Funds, etc.) I have covered the position of Project Manager for the site construction and Site Manager for the production already working. The plant produce light carpentry and rubber.I have had the responsibility for:•Coordination of equipment installation•Coordination of production machines supplier, for installation and training •Employee selection•Control of costs•Managing of raw material supplier•Managing contacts with external consultant (HSE, IT, European Funds, etc.)

    • Production Manager
      • Jan 2007 - Dec 2007

      Terexlift is a company of TEREX Group. I was responsible for production department, managing 150 employee, divided on 4 production lines. Every line was managed directly by a supervisor.I had the responsibility to:•prepare the production plan, based on commercial forecast•work with the purchasing department to have the right material in the right time•work with quality department to solve problems found on the production lines.I have had experiences in the implementation of the first moving line of the site and in many projects related to “Lean Production” approach.I had also a week of training on “Lean Production” in USA.

    • General maintenance & Utilities Manager
      • Mar 2002 - Dec 2006

      Maintenance and Utilities Manager at “ELI LILLY” Sesto Fiorentino’s site. Since 2003 until 2006, I was part of Board of Director of CEF (“Consorzio Energia Firenze”) for Eli Lilly.I was responsible for maintenance department, managing 55 employee, divided in 4 different areas: General Maintenance, Utilities Maintenance, Electrical Maintenance and Pharma Maintenance.I was responsible to perform FMEA analysis on equipment, preparation of preventive maintenance program, ,managing of ordinary and extraordinary maintenance activities. I was responsible to manage the external maintenance service suppliers, estimation of services costs and verification of realization.I was responsible to prepare the maintenance and energy expenses budget.In April 2006 I have been certified as “Black Belt” in “LEAN SIX SIGMA” program.

    • General Maintenance & Utilities Manager
      • Mar 2002 - Dec 2006

      Maintenance and Utilities Manager at “ELI LILLY” Sesto Fiorentino’s site. Since 2003 until 2006, I was part of Board of Director of CEF (“Consorzio Energia Firenze”) for Eli Lilly.I was responsible for maintenance department, managing 55 employee, divided in 4 different areas: General Maintenance, Utilities Maintenance, Electrical Maintenance and Pharma Maintenance.I was responsible to perform FMEA analysis on equipment, preparation of preventive maintenance program, ,managing of ordinary and extraordinary maintenance activities. I was responsible to manage the external maintenance service suppliers, estimation of services costs and verification of realization.I was responsible to prepare the maintenance and energy expenses budget.In April 2006 I have been certified as “Black Belt” in “LEAN SIX SIGMA” program.

    • United States
    • Retail
    • Test Engineer
      • Jul 1999 - Mar 2002

      Test Engineer at “PIAGGIO VEICOLI EUROPEI S.p.A.” Pontedera’s site, in the Engine Department , for the development of 4 stroke engines.I was responsible to manage the new engines project, the operators of tests area and to prepare the test check lists.I was responsible to prepare documentation of test results, to discuss with the technical director.I was part of project team as representative of tests and results, to propone alternatives and technical solutions.Project developed:•Engine 125 4T 4V e 180 4T 4V for “Hexagon”•Engine 125 4T 4V e 180 4T 4V for “Runner”, “X9”, “DNA”•Engine 125 4T 4V e 200 4T 4V for “BEVERLY”

    • Italy
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Test Engineer
      • Jul 1999 - Mar 2002

      Test Engineer at “PIAGGIO VEICOLI EUROPEI S.p.A.” Pontedera’s site, in the Engine Department , for the development of 4 stroke engines.I was responsible to manage the new engines project, the operators of tests area and to prepare the test check lists.I was responsible to prepare documentation of test results, to discuss with the technical director.I was part of project team as representative of tests and results, to propone alternatives and technical solutions.Project developed:•Engine 125 4T 4V e 180 4T 4V for “Hexagon”•Engine 125 4T 4V e 180 4T 4V for “Runner”, “X9”, “DNA”•Engine 125 4T 4V e 200 4T 4V for “BEVERLY”

Education

  • QFORMA
    Executive MBA
    2020 - 2020
  • Università degli Studi di Perugia
    Mechanical Engineer, Engineering
    1992 - 1998
  • Politecnico di Bari
    1991 - 1992
  • Politecnico di Bari
    Engineering
    1990 - 1992
  • Liceo Scientifico
    1985 - 1990
  • Liceo Scientifico Monticelli
    Liceo Scientifico
    1985 - 1990

Community

You need to have a working account to view this content. Click here to join now