Antonio Parra Lobato

Project Director at Atlantic Copper
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Huelva, Andalusia, Spain, ES

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Spain
    • Mining
    • 200 - 300 Employee
    • Project Director
      • Apr 2023 - Present

      Leading CirCular Project at Atlantic Copper, a Freeport-McMoRan Company. The CirCular Project includes the design, construction and start-up of the necessary facilities to recycle 60.000 Ton/year of Waste Electrical & Electronic Equipment (WEEE), recovering Cu, Au, Ag, Pt, Pd, Sn and Ni among others, key elements for the technological transition, decarbonisation and renewable energies. Leading CirCular Project at Atlantic Copper, a Freeport-McMoRan Company. The CirCular Project includes the design, construction and start-up of the necessary facilities to recycle 60.000 Ton/year of Waste Electrical & Electronic Equipment (WEEE), recovering Cu, Au, Ag, Pt, Pd, Sn and Ni among others, key elements for the technological transition, decarbonisation and renewable energies.

    • Energy Area Director
      • Nov 2021 - Apr 2023

      Biogas | Biomethane | AD Plants | Green Hydrogen | Waste to Energy | PV | Wind Power | Decarbonization Development / Design / Construction (EPC / EPCm) Biogas | Biomethane | AD Plants | Green Hydrogen | Waste to Energy | PV | Wind Power | Decarbonization Development / Design / Construction (EPC / EPCm)

    • Spain
    • IT Services and IT Consulting
    • 700 & Above Employee
      • Aug 2019 - Dec 2021

      GATE Terminal. LNG Plant Turnaround 20/21. Maasvlakte Rotterdam. The Netherland. (13 MM€)Proposal and Project Management. Conceptual & Constructability analysis, FEED, Detailed Engineering, Procurement and Contracting, Constructability Workshops, Risk Management, Mechanical Completion management, Work Packages preparation and work execution.Key achievement: The project was completed with success: without any LTI, on time, inside expected budget and with expected quality.At the end of period:- Business development in Hydrogen and CO2 markets.- Proposal Management for Offshore Wind Power PCM services. Show less

      • Sep 2018 - Jul 2019

      Supporting business development and engineering disciplines. Constructability strategy. Modular design and construction. PV Plants. FSRU. Floating Power Barge. Constructability analysis on the following projects:- SENER solar tracker development project & PV plants.- Project SKR-03. Production Capacity Expansion. REPSOL - ILBOC. Cartagena.- Revamping on Platforming unit. CEPSA San Roque.- Torch unit revamping. Cepsa Química Puerto Mayoral.- Project 2101755. Production Capacity Expansion in Polypropylene plant. REPSOL. Puertollano.- Project 2101868. New torch in Polypropylene Plant. REPSOL. Industrial Complex Puertollano.- Project P64. Compressor 802K-001A Revamping. REPSOL. Industrial Complex Puertollano Show less

      • Sep 2017 - Aug 2018

      Mobilized to Oman, CRM Project (PDO), as Deputy Site Manager. Construction, Pre commissioning, Commissioning & Start Up operations, until acceptance tests and commercial operations of two (2) upstream PDO gas plants.

      • Jan 2017 - Sep 2017

      Solar Tower Project development: Constructability / Modularization. Engineering and Construction.

      • Mar 2016 - Dec 2016

      CRM Project (PDO). Mobilized to Oman to ensure three (3) Shutdowns in two (2) PDO upstream gas plants.Managing all operations done before and during Gas Plant Shutdowns. Key achievement: The three shutdowns were completed with success. Zero LTI and on time.

    • Spain
    • Engineering Services
    • 700 & Above Employee
    • Construction Coordinator
      • Apr 2013 - Mar 2016

      Six (6) months mobilized to Volgograd (Russia) as Site Construction Manager, to start the construction activities for the EPC project for the construction of three new units inside LUKOIL REFINERY in Volgograd: Mild Hydrocracker, Hydrogen and Sulphur units. Budget: 1.200 MM$. Customer: LUKOIL. Team mobilization inside refinery, PTW, managing subcontractors, coordination meeting with Client, constructability analysis, managing Heavy Lifting subcontractors, etc. In Madrid: Construction Department, making coordination and supporting to different Sites: Russia, Abu Dhabi, Kuwait, Algeria, Bolivia, Canada. Managing Construction Resources, including Organization Charts and mobilization/demobilization plans of the construction staff in coordination with Sites Construction Managers / Project Directors. Recruiting Management, coordination work permit visa, hiring process, etc. Site Visits to Kuwait, Russia refineries, to analyse local subcontractor and to get information for issue construction bids. Site Visit to Kuwait, Russia refineries, to analyse local subcontractor and to get information for issue construction bids. Show less

    • Spain
    • Engineering Services
    • 700 & Above Employee
      • 2009 - Apr 2012

      Projects:• 2010 – 2012. V. de Arnedo Compressor Station in La Rioja (Spain) for ENAGAS. (Turbo compressor package: MAN Turbo)• 2009 – 2010. Lumbier Compressor Station in Navarra (Spain) for ENAGAS. (Turbo compressor package: Nuovo Pignone / General Electric)

      • 2007 - 2009

      Project:OPRT (Offshore Pipeline Reception Terminal) in Almería (Spain) Included in MEDGAZ Project.

      • 2004 - 2007

      Projects:• Compressor Station of Sevilla. ENAGAS, S.A. Sevilla. (Turbo compressor package: Solar Turbines)• Compressor Station of Alicante. ENAGAS, S.A. Crevillente. (Turbo compressor package: MAN Turbo)

      • 2002 - 2004

      Project:Extension of the Compressor Stations of Maghreb pipeline in Morocco, for EMPL.(Turbo compressor package: Rolls Royce)(Turbo generator package: Solar Turbines)

      • 2001 - 2002

      Projects:• Extension of the Compressor Stations of Maghreb pipeline in Morocco, for EMPL.• Compression Station of GAZ ASOCIES. SRGA. PHASE 2 HASSI R’MEL (ALGERIA). • Pumping Station of Barcelona for CLH.• Pumping Station of Ballobar for CLH.

      • 1999 - 2001

      Projects:• Compression Station of Valencia. ENAGAS. Valencia. (Turbo compressor package: Solar Turbines)• Pumping Stations 2 & 3 of Cartagena – Puertollano pipeline. REPSOL PETROLEO. Spain.

Education

  • Universidad de Extremadura
    Ingeniero Técnico Industrial, Electricidad
    1995 - 1999