ANTONIO CARUSO
Engineering Manager at RAM Power S.r.l.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Italiano Native or bilingual proficiency
-
Inglese Full professional proficiency
-
Portoghese Limited working proficiency
-
Francese Elementary proficiency
Topline Score
Bio
Experience
-
RAM Power S.r.l.
-
Italy
-
Oil and Gas
-
1 - 100 Employee
-
Engineering Manager
-
Sep 2021 - Present
1) Preparation of technical documentation for BID new Project PLAQUEMINES LNG inside the Baker Hughes (BH) Yard of Avenza. After Calcasiueu Pas Project, Plaquemines LNG is the 2nd project that the Company Venture Global LNG has awarded to BH; it has the same characteristics of the previous one. 2) Execution of project Feasibility Studies; preparation of Site Layout and preparation / issuing of all Lifting Procedures. RAM Power contractual SoW to be carried out inside BIBLIS Production Plant (adjacent to homonymous nuclear palnt, c/o Frankfurt - Germany) foresees the installation and commissioning assistence of N. 11 groups of Turbines ExPess2500 (turbines, generator and stack), process piping and 23 skids. Client: GE Power Gas; Owner: RWE GA (Germany).3) Engineering follow up for TUVA Project - ENIPower Mantova; installation of a new steam turbine (TUVA), piping and E/I connections inside th Combined Cycle Power production plant (CC2).
-
-
Engineering Manager
-
May 2020 - Sep 2021
Mechanical and E/I assembling (piping and equipment) of N. 9 process Modules for gas compression (LNG); precommissioning and commissioning assistence (final module weight: 1390 ton/each); Client: Baker Hughes; Owner: Venture Global LNG (Louisiana - USA)
-
-
-
NEC Srl
-
Italy
-
Oil and Gas
-
1 - 100 Employee
-
Site & Project Manager
-
Sep 2018 - Apr 2020
SARLUX Refinery Maritime Terminal (pier) refurbishment works including: site fabrication engineering, procurement, construction and installation (by means n. 3 self propelled pontoons). The Sow includes the following parts: 1) Construction and installation of a new mooring equipment (briccola) I1NB3 and removal/demolition of the existing one (approx 210 tons). 2) Replacement of existing raw GR1 & GR10 42" lines located along the pier (pipe cutting and removal of existing 42" line and replacement with new 40" lines; approx 3000 m/each); installation of 72 piles 48"; construction and offshore installation of platforms and other support strutures for a total amount of 5200 tons. 3) Construction and assembly of the 24" vapor recovery pipe line (VRU) (approx 1650 m) located along the pier; construction and assembly of variuos support structures for a total amount of 700 tons. 4) Complete replacement of n. 2 18" R6 pipe lines located along pier (cutting, removal od existing line and replacement with new 18" lines; appprox 1800 m/each); construction and offshore installation of pier reinforcement support for a total amount of 230 tons.
-
-
Proposal & Operation Manager
-
Apr 2018 - Aug 2018
BID for refurbishment activities relevant to the existing SARLUX Refinery Maritime Terminal in Sarroch (Cagliari, Italy); (550000 h; 6300 tons)
-
-
-
OFFICINE RAM POWER S.R.L.
-
Italy
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Operation Manager
-
Sep 2017 - Oct 2018
EPC of 8 Fuel Gas Modules and 4 Pumps for SERGIPE Project (Brazil); Client Baker Hughes General Electric (BHGE) EPC of 8 Fuel Gas Modules and 4 Pumps for SERGIPE Project (Brazil); Client Baker Hughes General Electric (BHGE)
-
-
-
Ersai Caspian Contractor LLC
-
Kazakhstan
-
Oil and Gas
-
300 - 400 Employee
-
YARD OPERATION MANGER
-
Jan 2016 - Aug 2017
1) EPC Contract N. 2 Topsides for the Kashagan Field Experimental Program Clusters (EPC 2&3) (2,48 M hours, 3450 tons); Client: North Caspian Operating Company (NCOC). 2) Construction of 75 Pipe Racks (18,0 M hours, 54000 Tons) for Future Growth Project (FGP) / Wellhead Pressure Management Project (WPMP), facilities located in Tengiz (Western Kazakhstan); Client TENGIZCHEVROIL. 1) EPC Contract N. 2 Topsides for the Kashagan Field Experimental Program Clusters (EPC 2&3) (2,48 M hours, 3450 tons); Client: North Caspian Operating Company (NCOC). 2) Construction of 75 Pipe Racks (18,0 M hours, 54000 Tons) for Future Growth Project (FGP) / Wellhead Pressure Management Project (WPMP), facilities located in Tengiz (Western Kazakhstan); Client TENGIZCHEVROIL.
-
-
-
Saipem
-
Italy
-
Engineering Services
-
700 & Above Employee
-
YARD OPERATION MANAGER (CHANGE LEADER)
-
Feb 2015 - Dec 2015
YARD CHANGE LEADER for SAIPEM Fabrication Improvement Program (F.I.P.): - Yard Organization and construction process review and optimization for cost savings; - new construction methodologies implementation for operation productivity improvement; - new Cost Management implementation (MACO); - new Subcontracting strategy implementation; - new ASSET organization. YARD CHANGE LEADER for SAIPEM Fabrication Improvement Program (F.I.P.): - Yard Organization and construction process review and optimization for cost savings; - new construction methodologies implementation for operation productivity improvement; - new Cost Management implementation (MACO); - new Subcontracting strategy implementation; - new ASSET organization.
-
-
-
Saipem Taqa Al-Rushaid Fabricators Co. Ltd.
-
Saudi Arabia
-
Construction
-
300 - 400 Employee
-
YARD OPERATION MANAGER
-
Jul 2013 - Feb 2015
1) WASIT EPC Project (Arabiyah & Hasbah Project): construction of N. 14 decks, N. 5 jackets, N. 2 bridges, N. 2 flares and sealine spools (5,6 Mh; 24.500 tons); Client: ARAMCO. 2) ABUSAFAH EPC Project: construction of N. 3 Decks, N. 2 Jackets and sealine spools for (1.1 Mh; 5.400 tons); Client: ARAMCO. 3) ZULUF & MARJAN EPC Project: construction of N. 3 Decks, N. 6 Jackets, brownfield structures and sealine spools (2.15 Mh; 17.500 tons); Client: ARAMCO. 1) WASIT EPC Project (Arabiyah & Hasbah Project): construction of N. 14 decks, N. 5 jackets, N. 2 bridges, N. 2 flares and sealine spools (5,6 Mh; 24.500 tons); Client: ARAMCO. 2) ABUSAFAH EPC Project: construction of N. 3 Decks, N. 2 Jackets and sealine spools for (1.1 Mh; 5.400 tons); Client: ARAMCO. 3) ZULUF & MARJAN EPC Project: construction of N. 3 Decks, N. 6 Jackets, brownfield structures and sealine spools (2.15 Mh; 17.500 tons); Client: ARAMCO.
-
-
-
SAIPEM do BRASIL
-
Guaruja' , San Paolo, Brazil
-
YARD OPERATION MANAGER
-
Jan 2012 - Jun 2013
1) Support to Saipem Yard Manager during the fabrication of the onshore Yard in Guaruja', San Paolo State, Brazil. SAIPEM investment in Brazil. 2) Responsible of receiving, handling, storage and load-out of 32.000 sea line pipes (D. 24") for Cabiunas Project; Client: Petrobras; 3) Manpower and facilities recruitment and training overview for Cabiunas Project construction activites starting. 1) Support to Saipem Yard Manager during the fabrication of the onshore Yard in Guaruja', San Paolo State, Brazil. SAIPEM investment in Brazil. 2) Responsible of receiving, handling, storage and load-out of 32.000 sea line pipes (D. 24") for Cabiunas Project; Client: Petrobras; 3) Manpower and facilities recruitment and training overview for Cabiunas Project construction activites starting.
-
-
-
SKEMA SpA (Ozen Port Production Base - OPPB, Kazakhstan)
-
Atyrau, Kazakhstan
-
PROJECT MANAGER & Deputy GENERAL MANAGER
-
Jul 2011 - Dec 2011
Procurement, construction (PC) and offshore installation of supports (E&I, structural and piping); onshore structures fabrications; offshore punch list works execution; living quarters refurbishment; helideck modifications for Kashagan Field - Atyrau (Kazahstan); Client: AGIP KCO Procurement, construction (PC) and offshore installation of supports (E&I, structural and piping); onshore structures fabrications; offshore punch list works execution; living quarters refurbishment; helideck modifications for Kashagan Field - Atyrau (Kazahstan); Client: AGIP KCO
-
-
-
SKEMA SpA (Ozen Port Production Base - OPPB; Kazakhstan)
-
Atyrau; Kazakhstan
-
PROJECT MANAGER & Deputy GENERAL DIRECTOR
-
Apr 2009 - Jul 2011
Engineering, Procurement and Construction (EPC) of 12 Offshore Process Utility Buildings - In Country (1500 tons) for Kashagan Field - in OPPB Yard, Atyrau (Kazakhstan); Client: AGIP KCO Engineering, Procurement and Construction (EPC) of 12 Offshore Process Utility Buildings - In Country (1500 tons) for Kashagan Field - in OPPB Yard, Atyrau (Kazakhstan); Client: AGIP KCO
-
-
-
Rosetti Marino Group of Companies
-
Italy
-
Oil and Gas
-
300 - 400 Employee
-
PROJECT ENGINEERING MANAGER & Deputy PROJECT MANAGER
-
2007 - Mar 2009
Construction of N. 4 manifolds for Kashagan Project - Kazakhstan (Complex A and Complex D) (6000 tons); Client: AGIP KCO.Assigned tasks: - responsible to support the Project Manager so as to ensure that the project is realized in accordance with project related specifications, in full respect of dedlines, quality requirements, foreseen costs and performances;- to reach the assigned margin of profit.
-
-
PROJECT MANAGER
-
2005 - 2007
EPC Contract of KATARINA Platform construction (jacket, piles, deck, living quarter and helideck), including MARICA Platform revamping; Client: INAgip doo
-
-
PROJECT MANAGER
-
2004 - 2005
EPC Contract of IKA-IDA Platforms construction (N. 5 complete platforms: jackets, piles, decks and helidecks); Client: INAgip doo
-
-
PROJECT MANAGER
-
2003 - 2004
Construction of MISKAR Gas Compression Module for DP4 field in Tunisia; Client: BECHTEL / BRITISH GAS TUNISIA
-
-
PROJCT MANAGER
-
2002 - 2003
Refurbishment activities (equipment procurement / installation, equipment support fabrication / installation) inside old PIPE Fabrication Workshops (SPS owner) in Baku, Azerbaijan; Manpower training and production start-up; Client: SAIPEM SA
-
-
CONSTRUCTION INVESTMENT & MAINTENANCE MANAGER
-
2002 - 2003
Responsible of Construction Investment and Assets Maintenance Manager
-
-
PROJECT MANAGER
-
May 2000 - 2002
Refurbishment and expansion of an existing FINE CHEMICAL PLANT (Engineering, procurement, fabrication and installation of structures, piping / equipment, E&I, including pre-commissioning, commissioning and start-up assistance), located inside the ENICHEM Chemical Plant of Ravenna; Client: GREAT LAKES MANUFACTURING ITALY Srl (Canadian Company)
-
-
PROJECT MANAGER
-
2000 - 2002
EPC Project for a new FINE CHEMICAL PLANT (Engineering, procurement, fabrication and installation of structures, piping / equipment, E&I, including pre-commissioning, commissioning and start-up assistance), located inside the ENICHEM Chemical Plant of Ravenna; Client: ENDURA SpA
-
-
-
-
COMMERCIAL MANAGER ASSISTANT
-
Jan 2000 - May 2000
Waiting for new project awarding, I was in charge to perform the preparation of Pre-qualification and Technical Bids, supporting Company Commercial Manager. Waiting for new project awarding, I was in charge to perform the preparation of Pre-qualification and Technical Bids, supporting Company Commercial Manager.
-
-
-
BELLELI OFSHORE Srl, Taranto
-
Taranto, Italy
-
Deputy PROJECT MANAGER
-
1998 - 1999
- execution of feasibilities, construction studies and Bid preparation for SHELL Brutus Project (tension leg hull platform construction), expected weight 13.500 tons; Client: SHELL. - URSA TLP Project, Hull construction completion (28.500 tons); Client SHELL - execution of feasibilities, construction studies and Bid preparation for SHELL Brutus Project (tension leg hull platform construction), expected weight 13.500 tons; Client: SHELL. - URSA TLP Project, Hull construction completion (28.500 tons); Client SHELL
-
-
-
NEW OFFSHORE COMPANY (BELLELI Group), Taranto, Italy
-
Taranto, Italy
-
Deputy PROJECT MANAGER
-
1996 - 1998
Storebealt Bridge Project (Denmark); construction, painting and load-out for COINFRA Company (ex IRITECNA - IRI Group) of 33 sections of a suspended metallic bridge, to be installed on Great Belt Straits in Denmark (total lenght: 1600 meters; total weight: 16600 tons) Storebealt Bridge Project (Denmark); construction, painting and load-out for COINFRA Company (ex IRITECNA - IRI Group) of 33 sections of a suspended metallic bridge, to be installed on Great Belt Straits in Denmark (total lenght: 1600 meters; total weight: 16600 tons)
-
-
-
BELLELI SpA
-
Taranto, Italy
-
Deputy PROJECT MANAGER
-
1995 - 1995
Construction of N. 4 TLP hull columns for NJORD Project; Client AKER Construction of N. 4 TLP hull columns for NJORD Project; Client AKER
-
-
-
BELLELI SpA, Tarato
-
Tranto, Italy
-
Deputy CONSTRUCTION MANAGER & SUBCONTRACTOR SUPERVISOR
-
1993 - 1995
HIBERNIA Project - Procurement, construction, pre.commissioning and onshore commissioning of the "MUD MODULE" (6000 tons) and "POWER GENERATION & UTILITY MODULE" (8000 tons) HIBERNIA Project - Procurement, construction, pre.commissioning and onshore commissioning of the "MUD MODULE" (6000 tons) and "POWER GENERATION & UTILITY MODULE" (8000 tons)
-
-
-
FREELANCE WORKS
-
Italy
-
FREELANCE ENGINEER
-
1990 - 1992
Freelance Engineer - Structural designer and consultant for Civil Engineering works Freelance Engineer - Structural designer and consultant for Civil Engineering works
-
-
Education
-
Università degli Studi di Napoli 'Federico II'
LAUREA IN INGEGNERIA, Civile-Edile -
Università degli Studi della Basilicata
ESAME DI STATO (QUALIFIED ENGINEER), Ingegneria civile