Anton Shadchnev

Head of Digital Projects at Group of companies
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Moscow, Moscow City, Russia, RU
Languages
  • Russian Native or bilingual proficiency
  • English Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Project management
    Пермский Государственный Университет (ПГУ)
    May, 2021
    - Nov, 2024
  • Improving the efficiency of hydrocarbon extraction from heterogeneous reservoirs at the late stage of field development
    РГУ нефти и газа (НИУ) имени И.М. Губкина
    Dec, 2020
    - Nov, 2024
  • MS Excel (Аdvanced)
    IT Academy Russia / Академия АйТи
    Dec, 2020
    - Nov, 2024
  • Modern methods of production stimulation and geological conditions of their application
    IEC Northern Capital
    Dec, 2020
    - Nov, 2024
  • Skills of highly effective managers
    IT Academy Russia / Академия АйТи
    Dec, 2020
    - Nov, 2024
  • Technologies of hydrocarbon extraction by submersible electric centrifugal pumps and pumping and ejector units
    РГУ нефти и газа (НИУ) имени И.М. Губкина
    Dec, 2020
    - Nov, 2024
  • Geological models of deposits for managing the development of oil & gas fields and methods of developing hard-to-recover reserves
    РГУ нефти и газа (НИУ) имени И.М. Губкина
    Nov, 2020
    - Nov, 2024
  • MS Project (Basic Course)
    IT Academy Russia / Академия АйТи
    Nov, 2020
    - Nov, 2024
  • Modern methods of of downhole logging and well testing
    IEC Northern Capital
    Nov, 2020
    - Nov, 2024
  • Project and risk management at the oil and gas industry
    РГУ нефти и газа (НИУ) имени И.М. Губкина
    Nov, 2020
    - Nov, 2024
  • Formation of a rational complex of downhole logging and well testing
    РГУ нефти и газа (НИУ) имени И.М. Губкина
    Oct, 2020
    - Nov, 2024
  • Public speech. Preparation of presentations. Skills of team work. Making complex management decisions.
    EY Academy of Business
    Oct, 2019
    - Nov, 2024
  • Integrated Production Modelling (Resolve, Prosper, MBAL & GAP Training)
    Petroleum Experts
    Jun, 2019
    - Nov, 2024

Experience

    • Russian Federation
    • Oil and Gas
    • 1 - 100 Employee
    • Head of Digital Projects
      • Feb 2021 - Present

      ● IPM Petex Licensing Business Owner (activities in Russia)● Interaction with the top-10 and other’s oil and gas companies in Russia - GazpromNeft, NOVATEK, LUKOIL, Rosneft, Tatneft etc.♦ Development of the WebSCADA – Decision Support and Adoption System for petroleum engineers: implementation at 10+ oil and gas fields (>300 wells)♦ Development of virtual flow rate estimation algorithms based on Petex (PROSPER): implementation at 2 oil and gas fields (>40 wells)♦ Successfully completed LUKOIL's project "Designing a template of Integrated Operations Center" (a role: Integrated Operations expert)

    • Russian Federation
    • Oil and Gas
    • 1 - 100 Employee
    • Lead Petroleum Engineer of Central Dispatch Service
      • Oct 2019 - Jan 2021

      ● 9 oil fields production monitoring and optimization, >300 wells● 10 field modeling engineers and 4 integrated planners under command🎖Production optimization & IPM♦ IM of Bulatovskoye field and field named after V.N. Vinogradov: 4 productive reservoirs, 164 wells♦ Positive effect with the IPM approach per 2020 year:– Incremental oil production > 256k bbl, EBITDA > $4.8kk– Replacement calculations of downhole pumping equipment, change of direction of flows at gathering facilities, ESP design, capacity growth calculations of gathering facilities♦ A template for the passport of the field’s with IM ♦ Standardized list of typical calculations for IM♦ Methodology for assessing the economic efficiency of the Project♦ For a Group of Companies: 6 webinars at the "Production optimization" area, from 100 to 150 participants🎖Digital initiatives♦ Management of production program for the introduction of new software products, from 5 to 15 engineers under command:– OIS+Hydrocarbon– Automation of the process of applications at oil and gas production department– Integrated planning module based on OIS iField♦ The workflow for the formation of an electronic database of ESP equipment (Well-Info)♦ Approbation and commissioning of automated process control systems "Integrated Modeling" and "Choke Modelling"♦ Configured data output to the Scada-system to work with IM, objects of 3 oil fields: 89 wells, 17 Group Metering Stations🎖 Organizational support IOC & Development of internal documentation♦ Bringing the Organizational and Role structures of the company's IOC to the standard of PJSC LUKOIL♦ Regulation’s on «Integrated Modeling» and on «Integrated planning with a horizon of 30/90 days»♦ Designed with RACI functional matrices– Business-processes and interaction schemes employees of the Company, based on 5 key-tasks of the CDS– Regulations on the interaction of the IOC with structural divisions and third-party organizations

    • Petroleum Engineer / IPM Engineer of Integrated Operations Center
      • Sep 2018 - Oct 2019

      ● 3 oil fields production monitoring and optimization, 72 wells in operation ● 2 field modeling engineers under command ♦ IM of Novo-Dmitrievskoye field: 4 productive reservoirs, 5 wells♦ Positive effect with the IPM approach per Jan-Sept 2019– Incremental oil production > 60k bbl, EBITDA > $1.4kk– Calculation of the reservoir pressure maintenance system, calculations for the flushing of flow lines and subsurface pumping equipment, calculations for the reagent supply ♦ Modules of the Scada-system for work with the IM in PetEx software (development with the contractor) ♦ Successfully implemented two rationalization proposals for the optimization of production (> $50k per year):– Optimizing the planned costs for conducting wells remedial work (termination of wells killing operation)– Improving the energy efficiency of production (shutdown of wells with high WTC) ♦ Development of internal documentation (related to oil fields with an IM)– Regulations on the formation and protection of well operating practices– The interaction of field modeling engineers with oil and gas production departmentJob responsibilities as a Field modeling engineer (PetEx Software tools):◊ Development of IPM workflows (RESOLVE+OpenServer)– Well test modeling– Production optimization– Different scenario production forecasting etc.◊ Building production/injection network systems (MBal+GAP)– Formation-Well-Surface Equipment-Pipe-Central Process Facilities◊ ESP/Downhole equipment design (PROSPER)◊ Coordinate updating of IM updates including technical task requirement, quality control◊ The bottlenecking optimization – Identified production opportunities based on the constraints analysis of the existing oil gathering systems and wells ◊ Short/medium/long-term production forecasting based on integrated and hydrodynamic models◊ Participation in the development and implementation of a software– Automated Process Control System for Integrated Modeling and for Choke Modelling

    • Production Manager
      • Dec 2016 - Sep 2018

      ● Oil production at Bogorodskoye field: 20 wells in operation, including 7 with natural flow, 8 beam pump, 5 ESP● 32 workers under command Achievements:♦ Transferred into ESP and brought into operation 7 wells previously operated in natural flow regime♦ Improved the scheme and the schedule of well control procedures by operators, optimized 8 positions♦ Set up maintenance hourly production reports with remote server control, optimized 4 positions♦ Successfully executed 2 chemical water shutoff operations for wells produced with beam pumps♦ Made changes and additions to the job description of oil and gas operators ♦ Made a detailed map of roads, wells, and facilities throughout the companyJob responsibilities as a Production manager:◊ Maintain and repair field equipment◊ Control and accounting of produced fluids◊ Planning and control of equipment overhaul◊ Supervise well operations according to technological and production constraints◊ Training sessions in case of emergency situations at hazardous production facilities◊ Document circulation, control over the movement, write-off, and sale of tangible assets◊ Organization and monitoring of field services work (workovers, equipment, fitters, electricians, etc.)

    • Russian Federation
    • Oil and Gas
    • 1 - 100 Employee
    • Production Manager
      • Jul 2016 - Nov 2016

      ● Oil production at 13 fields, 33 wells in operation, 5 production facility units● 51 workers under commandAchievements:♦ Technical regulations of prodcution facilities objects "Kryukovskiy" and "Malo-Chernigovskiy»♦ Elimination and localization plan for accidents at hazardous production facilities♦ Redesigned production reporting system for production accounting ● Oil production at 13 fields, 33 wells in operation, 5 production facility units● 51 workers under commandAchievements:♦ Technical regulations of prodcution facilities objects "Kryukovskiy" and "Malo-Chernigovskiy»♦ Elimination and localization plan for accidents at hazardous production facilities♦ Redesigned production reporting system for production accounting

    • Oil and Gas
    • 700 & Above Employee
    • Specialist of Technologies of development of non-traditional hydrocarbon reserves
      • Oct 2014 - Jun 2016

      ● Processing and analysis of production data of Usinsk field wells ● Steam treatment results analysis and conseqent recommendations● Oil production forecasting and NPV assessment of a water shutoff treatment implementation project● Water shutoff treatment analysis and assessment of criterias of its implementation ● Processing and analysis of production data of Usinsk field wells ● Steam treatment results analysis and conseqent recommendations● Oil production forecasting and NPV assessment of a water shutoff treatment implementation project● Water shutoff treatment analysis and assessment of criterias of its implementation

    • Russian Federation
    • Oil and Gas
    • 1 - 100 Employee
    • Oil and gas production Operator 3 levels
      • Jul 2013 - Feb 2014

      ● Wells operation in Serginskoye (40 wells), V.N. Vinogradov (3 wells), Sredne-Nazymskoye (13 wells)● Analysis of the effectiveness of thermal gas EOR method of Sredne-Nazymskom field (Bazhenov formation)● Calculation of the coefficient of water-gas ratio of the injected steam-gas mixture ● Wells operation in Serginskoye (40 wells), V.N. Vinogradov (3 wells), Sredne-Nazymskoye (13 wells)● Analysis of the effectiveness of thermal gas EOR method of Sredne-Nazymskom field (Bazhenov formation)● Calculation of the coefficient of water-gas ratio of the injected steam-gas mixture

    • Oil and Gas
    • 100 - 200 Employee
    • Work practice
      • Jul 2011 - Aug 2011

      Eurasia Drilling Company (2 month at 2011, 2 month at 2012)● Assistant driller for production and exploration drilling for oil and gas, grade 5● Assembler 4 grade Eurasia Drilling Company (2 month at 2011, 2 month at 2012)● Assistant driller for production and exploration drilling for oil and gas, grade 5● Assembler 4 grade

Education

  • Gubkin Russian State University of Oil and Gas
    Master's degree (2 year's), Department of LUKOIL-Engineering, Modeling of physical and technological processes of oil and gas fields development
    2014 - 2016
  • Gubkin Russian State University of Oil and Gas
    Specialist's degree (5 year's), Development and operation of oil and gas fields
    2008 - 2014

Community

You need to have a working account to view this content. Click here to join now