ansari samad

Piping Designer at The Shaw Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Manama, Capital Governorate, Bahrain, BH

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Smart plant 3D
    Petropipe Academy
    Nov, 2021
    - Nov, 2024

Experience

    • United States
    • Oil and Gas
    • 200 - 300 Employee
    • Piping Designer
      • Nov 2022 - Present

      Project: LIMA Clint: Wood Client: Tecnicas Reunidas Project: MRJN PKG 9 •Extraction of Piping Isometric drawings in Smart plant Spoolgen. •Detailing of Spool drawings in AutoCAD •Markup and checking Isometric as per client drawings. •Detailing of isometric drawing in AutoCAD. •Preparation of Erection & Spool drawings for Fabrication. •Checking of Spool drawings as per isometric drawings and guidelines. •Generation of Erection and Spool drawings in spoolgen software. Show less

    • Maritime Transportation
    • 700 & Above Employee
    • Engineering Trainee
      • Aug 2022 - Nov 2022

      Client: Petrobrass Project: P78 •Markup and updating the Ship Piping GA as per guidelines. •Quality check of the Model as per P&id. •Checking the model for any clashes, disconnected Piping etc. •Resolving TDL errors. •Checking of Isometric drawings as per P&id and guidelines. •Assets tagging process of plant, requiring identification of parts and components used such as valves, tanks, pumps, filters . •Primary and Secondary support modeling by using SP3D. •Checking the model with respect to P&ID's and vendor drawing to keep the model clean and inline in S3D. Show less

    • Oman
    • Oil and Gas
    • 100 - 200 Employee
    • Piping Designer
      • Jun 2021 - Aug 2022

      Client: ADNOC Project: MDB ZIRKU •Pipe routing as per P&id. •Equipment modeling and primary support modeling by using smart plant 3d. •To do list error clear. •Extraction of isometric in SP3D. •Checking isometric drawings as per guidline and P&id •Updating a model based on PMC comments. Client: ADNOC Project: MDB ZIRKU •Pipe routing as per P&id. •Equipment modeling and primary support modeling by using smart plant 3d. •To do list error clear. •Extraction of isometric in SP3D. •Checking isometric drawings as per guidline and P&id •Updating a model based on PMC comments.

Education

  • Petropipe academy
    Postgraduate Diploma, Piping engineering
    2021 - 2021
  • Anjuman-i-islam kalsekar polytechnic.
    High School Diploma, diploma mechanical engineer
    2015 - 2019

Community

You need to have a working account to view this content. Click here to join now