Ankit Mourya
Manager, Thermal Power plant operation (CCR) at Jspl Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
BOILER OPERATION ENGINEER
Boiler board, Raipur, Chattisgarh
Experience
-
Jspl Limited
-
India
-
Mining
-
400 - 500 Employee
-
Manager, Thermal Power plant operation (CCR)
-
2012 - Present
I am looking after operation of 6X135 MW Power Plant having super high pressure, reheating H/IP common casing double casing, double flow, single shaft condensing Turbine of Shanghai turbine works LTD with 39 stages (1 Impulse+38 reaction),seven extractions, rpm 3000, Shandong Jinan Power Equipment Factory, China make Generator, 6X460 TPH coal fired super high pressure with intermediate REHEAT, single drum, natural circulation, CFBC Boilers (132 Kg/cm2, 535°C) and DCS Emerson. Also worked in 140 MW (2x70 MW) Power Plant having BHEL make Turbine of 47 stages (1 Impulse+46 reaction) with five extractions, rpm 3000 controlled through MAX DNA EHTC governor, BHEL make Generator, 4 x 165 TPH coal fired AFBC Boilers (90 Kg/cm2, 535°C) supplied by BHEL, and DCS ABB & SEIMENS.) for three years.
-
-
-
ACC Ltd.
-
Accounting
-
1 - 100 Employee
-
Shift In charge
-
May 2007 - Apr 2012
I was looking after mainly Operation and also maintenance of 15 MW Captive Power Plant (having BHEL make Turbine having 25 stages (1 Impulse+24 reaction) with three extractions, rpm 7700, controlled through 505 WOODWARD Governor, 15 MW BHEL make Generator, 2 x 40 TPH coal fired AFBC Boilers (66 Kg/cm2, 485°C) supplied by Cethar Vessel Ltd and DCS -SEIMENS.)
-
-
Education
-
National Institute of Technology Durgapur
Bachelor of Engineering - BE, Electrical Engineering Technologies/Technicians -
NPTI, nagpur
PGDC, Power plant O&M