Anh Tran
Project Manager at RailCorp- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
vietnamese -
Topline Score
Bio
Phillip Cleary
Anh puts a great deal of emphasis on detailed planning of projects prior to site works, which has paid off.
Andres Isaza
This is what I would write: Anh is a highly committed project manager who is able to work independently and achieve project milestones on time or even before the due date. Anh has excellent budget management skills allowing him to estimate project costs quite accurately and control them during construction accordingly. Due to his vast experience within the Rail industry Anh is able to tackle multidisciplinary projects almost immediately after being handed over to him. Being an Electrical Engineer too, Anh has a strong practical knowledge of Electrical systems which helps him to helps and resolve complex technical issues by providing his guidance. Last but not least, Anh shows a great commitment to complete the projects with the highest quality.
Phillip Cleary
Anh puts a great deal of emphasis on detailed planning of projects prior to site works, which has paid off.
Andres Isaza
This is what I would write: Anh is a highly committed project manager who is able to work independently and achieve project milestones on time or even before the due date. Anh has excellent budget management skills allowing him to estimate project costs quite accurately and control them during construction accordingly. Due to his vast experience within the Rail industry Anh is able to tackle multidisciplinary projects almost immediately after being handed over to him. Being an Electrical Engineer too, Anh has a strong practical knowledge of Electrical systems which helps him to helps and resolve complex technical issues by providing his guidance. Last but not least, Anh shows a great commitment to complete the projects with the highest quality.
Phillip Cleary
Anh puts a great deal of emphasis on detailed planning of projects prior to site works, which has paid off.
Andres Isaza
This is what I would write: Anh is a highly committed project manager who is able to work independently and achieve project milestones on time or even before the due date. Anh has excellent budget management skills allowing him to estimate project costs quite accurately and control them during construction accordingly. Due to his vast experience within the Rail industry Anh is able to tackle multidisciplinary projects almost immediately after being handed over to him. Being an Electrical Engineer too, Anh has a strong practical knowledge of Electrical systems which helps him to helps and resolve complex technical issues by providing his guidance. Last but not least, Anh shows a great commitment to complete the projects with the highest quality.
Phillip Cleary
Anh puts a great deal of emphasis on detailed planning of projects prior to site works, which has paid off.
Andres Isaza
This is what I would write: Anh is a highly committed project manager who is able to work independently and achieve project milestones on time or even before the due date. Anh has excellent budget management skills allowing him to estimate project costs quite accurately and control them during construction accordingly. Due to his vast experience within the Rail industry Anh is able to tackle multidisciplinary projects almost immediately after being handed over to him. Being an Electrical Engineer too, Anh has a strong practical knowledge of Electrical systems which helps him to helps and resolve complex technical issues by providing his guidance. Last but not least, Anh shows a great commitment to complete the projects with the highest quality.
Experience
-
RailCorp
-
Transportation/Trucking/Railroad
-
700 & Above Employee
-
Project Manager
-
2002 - Present
I am accountable for • the end to end project management of major multidisciplined projects/ programs, including of multi–disciplined design groups, multiple internal/ external construction contractors. • Implementing the RailCorp Project Management Methodology (RPMM) which is base on the PMBOK. • Managing projects/ programs over their life clycle up to value of $30M per annual and ensure all work is delivered to Clients’ expectations, specific engineering standards with proper regard to environmental, risk and safety requirements. Currently, I am responsible for project management of the delivery of Traction System Upgrade (TSU) substation sectioning hut and HV feeder projects. Recently, I completed the delivery of following projects/ program without safety and environmental incident and outstanding defect. • the Overhead Wiring Modernisation program • the overhaul 33kV & 66kV rectifier transformer project • the replacement of 11kV/415v Pad mount substation and 11kV switchgear program • the 11kv TL 649 feeder (Granville to Cabramatta), 33kV 741 feeder (Kingsgove - Narwee) • the Sefton-Cabramatta Resignalling (SPAR) project Show less
-
-
-
Rail Infrastructure Corporation (RIC)
-
Western Sydney
-
Signal Construction Manager
-
2000 - 2002
I was responsible for leading and managing the Penrith Signal Depot staff in team building and delivery of the signalling projects to engineering standards, client’s expectation. I delivered over $10M of the following major CAPEX and OPEX projects on time, budget and no defects and incident • Replacement of signal warning lights at stations • Renewal of point machine and train-stops between Valley Heights and Mt Victoria. • Botany No. 4 Road signalling • Upgrading Parramatta Road Level crossing Show less
-
-
-
Rail Services Authority (RSA)
-
Melbourne, PTC
-
Project Manager, OHW
-
1998 - 2000
During the commercial operation of Rail Services Authority (RSA) I won a contract from the $28 Million multi disciplinary project, owned by John Holland Construction Pty for design, and construct the OHW system at Boronia, Victoria. I brought the NSW rail experts to work with the external contractors (Lang O'Rouke and Downer- Works Infrastructure) to deliver successfully this commercial project to client’s satisfaction. In addition, I experienced in the industrial dispute negotiation with the Victoria Electrical Trade Union (ETU) whilst our NSW the project team was working in the PTC - Victoria railway (Public Transport Corporation) Show less
-
-
-
Rail Services Authority (RSA) of NSW
-
Strathfield
-
Business Development Manager
-
1996 - 1998
1996 to 1998 Business Development Manager, Electrical. I was responsible for winning the external works thru public tenders. It included • Scope investigation • Bid cost estimate & schedule • Bid Document preparation and submission • Bid negatiation and presentation Typical major bids were • Boronia new railway PTC station, Victoria (won $0.5M) • SRA station lighting project (won over $5M) • Other PTC sub-contract works (won over $0.5M) • Hong-Kong 25kV AC rail projects (Joint venture with Queensland Rail & Leighton Asia Pacific) • 25kV AC rail projects in QLD & WA • Melbourne Tram upgrading trolley system projects Show less
-
-
-
State Rail Authority of NSW
-
Strathfield
-
Planning Services Manager
-
1991 - 1996
1991 to 1996 Planning Services Manager, Electrical. I worked for Electrical Construction Group – SRA Capital Development. I was responsible for • Allocating projects budget estimates and cashflow forecast • Submission for Capital funds • Preparing monthly project performance report • Short and long term electrical program • Preparing project concepts including Feasibility / Economic/ Engineering studies • Planning and scheduling all weekend/ closedown OHWM construction activities • Construction Engineer to monitor and control worksites In order to improve quality and cost saving of the OHW construction, I developed • Electrical Construction software (CCON) • Schedule of rate contract for OHW & TL construction Show less
-
-
-
-
Mains Engineer
-
1989 - 1991
1989 to 1991 Mains Engineer I planned and carried out the electrical routing maintenance within the Sefton Electrical District.
-
-
Design Engineer, Electrical
-
1986 - 1989
1988 to 1989 Computer System Manager.I managed and maintained computer hardware and software for Electrical Branch. I developed a number of computerised database system such as the transmission line pole base maintenance (UNISYS system), Track Possession & STN database, Transmission line design program in Sharp portable computer.1986 to 1988 Electrical Design Engineer. • Design overhead wiring (OHW), HV transmission lines (cable/ aerial), 1500v substations & sectioning huts. • For the last 6 months in Electrical Design Office, I performed as senior design engineer acting team leader of Transmission Line and OHW design • Quality Assurance and commissioning OHW system of the East-Hill electrification project Show less
-
-
Education
-
Sydney University
Master's degree, Master Engineering Studies (MES) -
NSW Vocational Education & Training Accreditation Board
Advanced Diploma of Project Management, Project Management -
Sydney University
Graduate Diploma, Computer System Engineering -
Queensland University of Technology
Bachelor of Engineering (BEng), Electrical Power Transmission & Control -
Phu Tho Institution of Technologies, Saigon
Bachelor of Engineering (BEng), Electrical