Angel Cuevas
Project Manager at International Industrial Contracting Corporation- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
International Industrial Contracting Corporation
-
United States
-
Construction
-
1 - 100 Employee
-
Project Manager
-
Jun 2016 - Present
-
-
-
Dematic
-
United States
-
Transportation, Logistics, Supply Chain and Storage
-
700 & Above Employee
-
Maintenance Manager
-
Oct 2014 - Mar 2016
-
-
-
International Industrial Contracting Corporation
-
United States
-
Construction
-
1 - 100 Employee
-
Project Manager
-
May 2011 - Oct 2014
-
-
-
NGK Ceramics Mexico, S. DE R.L. DE C.V
-
Monterrey y alrededores, México
-
Facilities & Engineering Manager
-
May 2008 - May 2011
STRONG EXPERIENCE ON START-UP FACILITIES & Coordination of public utilities service such as: C.F.E. (115 kV, 34.5 kV), SADM (Wells water), CATASTRO (Property land tax) and Secretaria de Desarrollo Urbano (Construction License), NATURAL GAS contract, ENVIRONMENTAL AGENCIES, TELMEX, WASTE MANAGEMENT, DEALING WITH PARKS REGARDING ON MONTHLY MAINTENANCE FEES Responsible for supervision and coordination for new facility over 600,000 sq.ft. Built area, which includes: FPS, compress air room, a/c system, electrical system and plumbing. Public utilities management to get successfully and on time arrangements and contracts for all facility infrastructures. Strong communication and negotiation skills with contractors also suppliers. Coordinate document control for all documentation during the equipment installation, such as: drawings control, transmittals, submittals, work schedule and estimations control. Elaborate TPM program for the operation of the facility and production equipment. Show less
-
-
-
-
Project Manager
-
Aug 2005 - May 2008
Schedule and update all activities for the "Flexible Transmission Program" for GM Power train at Ramos Arizpe Complex on the Production Equipment. Finance reports on the follow up during the Program. Coordinate document control for all documentation during the equipment installation Document Clarification Request, Transmittal, Submittal, Organ Chart, Field Orders, Inter Office Correspondence, Bid Packages, Scope of work) TPM reports in coordination with Manufacture Engineers. Coordinate earthworks, hydraulic, sewer, electrical utilities for home development around 230 dwelling units working with all contractors specialties. Schedule all constructions activities to get this Project on time. Coordination for all civil, mechanical and electrical works on site for two department buildings, contractor supervision, materials and quality construction. Schedule and follow in all specialties Develop scope of works for mechanical, electrical and civil works for GM "Power Transmission Project" in Ramos Arizpe, Coah; their were upgrade a warehouse to a production facility, reinforced all steel structure to support all pipe and duct works, electrical bussway, exhaust, chillers water and FPS. Develop a Facilities Management for CATERPILLAR in Nuevo Leon and Coahuila Plants, which mean optimized all maintenance organ chart and activities. Show less
-
-
-
-
Engineering Manager
-
Apr 2001 - Jun 2003
Several projects on American General Consulate Offices at Matamoros, Tamps., rebuild Storage room, upgrade on parking lot, install 1 (one) 150 kw generator and relocate an small one 45 kw. Full responsibility for supervision and coordination for several constructions, which included: Molding machines SMT equipment installation, FPS, structural steel, pipelines installation, isometric drawings and labor management. Disassembly and reassembly a chemical facility, pipe rack construction, tank area, welding supervision, and isometric drawings review Show less
-
-
-
-
Project Manager
-
Aug 2000 - Feb 2001
Responsible for supervision and coordination for new facility close to 140,000 sq.ft. built area, which include: FPS, compress air room, nitrogen pipeline, a/c system, A.H.U., electrical system and plumbing. Also responsible for all civil works: Earthworks, foundations, steel structure, tilt-up walls and roofing. Position required knowledge of electronics, air system and mechanical; decision-making and absolute accuracy under extreme pressure. Responsible for supervision and coordination for new facility close to 140,000 sq.ft. built area, which include: FPS, compress air room, nitrogen pipeline, a/c system, A.H.U., electrical system and plumbing. Also responsible for all civil works: Earthworks, foundations, steel structure, tilt-up walls and roofing. Position required knowledge of electronics, air system and mechanical; decision-making and absolute accuracy under extreme pressure.
-
-
-
-
Preventive & Corrective Maintenance Supervisor
-
Aug 1997 - Aug 2000
Preventive & Corrective Maintenance Supervisor Full responsibility for all installation such as: SMT machines (G.S.M., M.P.M., F.C.M. and reflow ovens), wave solder machines, lasers, paint button machines, molding machines (Cincinnati) all these installations were supplied with power, compress air, nitrogen & vacuum. Also responsibility for maintenance for air compressors like: pistons, turbine and oil free screw; give maintenance for chiller water units (400 tons. Trane brand 5 units) water pumps, volts regulator and R.O.S. Excellent interface with employees resulting in minimal grievances with union. Show less
-
-
Education
-
Universidad Autonoma de Tamaulipas
Ing. Civil -
Universidad Autónoma de Tamaulipas
Ingeniero Civil, Maintenance and Equipment Instalation