Andy W.

Electrical Technician at UT-Battelle
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Powell, Tennessee, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Research Services
    • 500 - 600 Employee
    • Electrical Technician
      • Mar 2010 - Present

      My responsibilities included: supporting the HRBIF Physics Division, Supporting Each Physicist and Engineering, Maintaining A safe working enviroment, making sure of all preventative maintenance schedules are met, repair of broken machinery, and Special projects for each facility in the assigned building area by management. My responsibilities included: supporting the HRBIF Physics Division, Supporting Each Physicist and Engineering, Maintaining A safe working enviroment, making sure of all preventative maintenance schedules are met, repair of broken machinery, and Special projects for each facility in the assigned building area by management.

    • Facilities Maintenance Electrician
      • Mar 2010 - Present

      Facilities Support for the Stable Isotope Enrichment Laboratory. •Facilities Support for the HRIBF Physics Division. •Facilities Support for the High Density Gas Jet Project. •Facilities Support for the Energy Efficiency Sustainability Metering Project Facilities Support for the Stable Isotope Enrichment Laboratory. •Facilities Support for the HRIBF Physics Division. •Facilities Support for the High Density Gas Jet Project. •Facilities Support for the Energy Efficiency Sustainability Metering Project

    • Owner/Operator
      • May 2004 - Apr 2011

      Supervised Several Electricians on each Project. •Project Design, Planning, Estimating, and Installation of Projects to NEC/NFPA standards. •Installed and Computer Programmed extensive Energy Efficient Lighting Systems. •Strong Communication Skills with Inspectors, Engineers, and Builders. Supervised Several Electricians on each Project. •Project Design, Planning, Estimating, and Installation of Projects to NEC/NFPA standards. •Installed and Computer Programmed extensive Energy Efficient Lighting Systems. •Strong Communication Skills with Inspectors, Engineers, and Builders.

    • Electrician
      • Aug 2003 - Apr 2004

      under TVA Supervision. •Followed Blueprints per TVA Engineering Specs. •Installed Steel Structures and Equipment under the Transmission Power Substation Manual. •Assisted Supervision/Sales Reps with the new Grounding Pilot Grounding Program. •Installed Gas Breakers, Ground Mats, Motor Operated Switches and new Structure Supports. under TVA Supervision. •Followed Blueprints per TVA Engineering Specs. •Installed Steel Structures and Equipment under the Transmission Power Substation Manual. •Assisted Supervision/Sales Reps with the new Grounding Pilot Grounding Program. •Installed Gas Breakers, Ground Mats, Motor Operated Switches and new Structure Supports.

    • Journeyman Inside WIreman
      • Apr 2002 - Jul 2003

      Installed High Voltage Transformers. •Built and Maintained High Voltage Transmission Lines at the K-25 Technology Park. •Installed new Electrical Equipment at the Spallation Neutron Source. •Removed Contaminated Electrical Equipment from the K-25 BNFL Clean-up site. Installed High Voltage Transformers. •Built and Maintained High Voltage Transmission Lines at the K-25 Technology Park. •Installed new Electrical Equipment at the Spallation Neutron Source. •Removed Contaminated Electrical Equipment from the K-25 BNFL Clean-up site.

    • Facility Fabrication Electrician
      • Jul 2001 - Apr 2002

      Planned, Estimated, and Installed Electrical Equipment by Research Design Engineers. •Assisted in the Redesign of the PORTA-SAG Generator. •Supported Research Technicians and Engineers. •Built Custom Test Equipment to Design Specifications per the NEC. •Computer Designed and Fabricated Safety Shields for various Test Equipment. Planned, Estimated, and Installed Electrical Equipment by Research Design Engineers. •Assisted in the Redesign of the PORTA-SAG Generator. •Supported Research Technicians and Engineers. •Built Custom Test Equipment to Design Specifications per the NEC. •Computer Designed and Fabricated Safety Shields for various Test Equipment.

Community

You need to have a working account to view this content. Click here to join now